Old Posted Aug 6, 2010, 7:30 PM
djh djh is offline
Registered User
 
Join Date: Jul 2003
Location: Vancouver
Posts: 1,977
Quote:
Originally Posted by aberdeen5698 View Post
OK, let's see now...

5 months = about 150 days.
550 in 150 days = less than 4 cheaters per day.

But wait - they probably didn't catch all the cheaters. Let's say they caught only 1% of the cheaters. That means there could be up to 400 cheaters a day.

With a ridership of around 100,000 per day that means a fare evasion rate of 0.4%. This is a problem worth spending tens of millions of dollars on?

As Jarret Walker said on Wednesday evening, this is basically a political issue, not a technical one. Politicians are appealing to peoples perception of unfairness, not of an actual, substantial problem.

Many millions of dollars to install fare gates may make the system "seem" fairer, but I sure hope they're not funding it on the expectations of recouped revenues...
I think the problem is with your calculations.
Imagine standing at the entrance to City Hall-Broadway station. A train disembarks. 100 people walk past you. Are you saying only 1 of those people paid for a ticket and 99 didn't?
That's just unrealistic from the get-go.
     
     
  #6782  
Old Posted Aug 6, 2010, 7:52 PM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Quote:
Originally Posted by ozonemania View Post
This is what the UBC Millenium Line extension will be like too, right from day one. Not so much for the Evergreen, which at this point would act as a commuter line.
To be honest, as someone who used to live in Coquitlam, I think the Evergreen line will have higher than anticipated and fast growing number of users, but not on the scale of the Canada Line. The bus service in the area is bad in many respects, but the main routes like 97-B Line and 160 are still jam packed, and there has always been a great demand for the skytrain to be built from everyone.
     
     
  #6783  
Old Posted Aug 6, 2010, 7:59 PM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Quote:
Originally Posted by mrjauk View Post
This is one of the things that I've been impressed with. I was pleasantly surprised at the level of ridership in the non-rush-hour direction. At 4:00 pm, the northbound train at City Hall is almost as full as the southbound one. That's really encouraging.
4pm is pretty much rush hour in Vancouver proper transit, regardless of direction. At 10am on a Thursday, all seats occupied when leaving Richmond Brighouse, seniors boarding at Lansdowne and Aberdeen had difficulty finding a seat.
     
     
  #6784  
Old Posted Aug 6, 2010, 11:41 PM
usog usog is offline
Registered User
 
Join Date: Dec 2008
Posts: 580
Took the Canada Line from Lansdowne to Aberdeen around 2PM today. All seats were taken from Brighouse, around 1/3-1/2 of the standing space was taken by the time I got to Aberdeen. There was a 10-person line for the ticket machines at Aberdeen. From my own observations taking the Canada Line almost daily, ridership is definitely healthy.
     
     
  #6785  
Old Posted Aug 6, 2010, 11:49 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by djh View Post
I think the problem is with your calculations.
Imagine standing at the entrance to City Hall-Broadway station. A train disembarks. 100 people walk past you. Are you saying only 1 of those people paid for a ticket and 99 didn't?
I said the fare evasion rate is 0.4%. In other words, 0.4% of the people didn't pay for a fare. That means a little less than one person out of 200 didn't pay for a fare.

That's based on the quoted figures and allowing a 100-fold increase in the number of stated fare evaders.
     
     
  #6786  
Old Posted Aug 7, 2010, 6:38 AM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Translink had a news release:

Some Canada Line passengers arriving three years early for their trips
Milestone ridership levels close to being achieved
http://www.translink.ca/en/About-TransLi...g-three-years-early-for-their-trips.aspx


Quote:
In addition to more frequent bus connections to the Brighouse and Bridgeport stations, some of the big articulated coaches from the #98 B-Line are bolstering service on the #43, #44 and #49 routes while the Coast Mountain Bus Company has used others to retire older units in the fleet.
#49? is it a mistake? I don't seem to have observed that.
     
     
  #6787  
Old Posted Aug 7, 2010, 7:02 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
The #49 is going to artics this fall on some trips due to the massive ridership to Langara.
     
     
  #6788  
Old Posted Aug 7, 2010, 8:42 AM
djh djh is offline
Registered User
 
Join Date: Jul 2003
Location: Vancouver
Posts: 1,977
Quote:
Originally Posted by aberdeen5698 View Post
I said the fare evasion rate is 0.4%. In other words, 0.4% of the people didn't pay for a fare. That means a little less than one person out of 200 didn't pay for a fare.

That's based on the quoted figures and allowing a 100-fold increase in the number of stated fare evaders.
Aah, thanks for the clarification. Makes much more sense to me now.
     
     
  #6789  
Old Posted Aug 7, 2010, 2:35 PM
worldwide's Avatar
worldwide worldwide is offline
Registered User
 
Join Date: Oct 2007
Location: Vancouver - Ktown
Posts: 704
thank god. I used to take the 49 there all the time until I switched to the 3. I remember waiting for 25 minutes after a night class for the 49 and then barely being able to get on cause it was so packed.
__________________
Hieroglyphics yeah, to the kick and the snare like that, there, yeah, we keep it raw rare
     
     
  #6790  
Old Posted Aug 7, 2010, 10:19 PM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
According to Singtao (Chinese) news, Ken Hardie did explicitly tell reporters that Canada Line capacity is expeced to carry 300000 daily ultimately. No more mentions of ridiculous low figure 142000
     
     
  #6791  
Old Posted Aug 8, 2010, 12:30 AM
whatnext whatnext is offline
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 27,937
Which makes the shortsighted undercapacity of the line even more perplexing. If you want to get more people out of cars transit has to be more appealing. Having it jam-packed almost from the word go isn't the way to do it.
     
     
  #6792  
Old Posted Aug 8, 2010, 4:19 AM
eduardo88 eduardo88 is offline
BANNED
 
Join Date: May 2006
Location: Berlin + Madrid
Posts: 1,024
Quote:
Originally Posted by whatnext View Post
Which makes the shortsighted undercapacity of the line even more perplexing. If you want to get more people out of cars transit has to be more appealing. Having it jam-packed almost from the word go isn't the way to do it.
The line can run at up to 15 000pph, with operations 20hours per day means 300 000 riders per day. Although we all would have liked for longer platforms, with C-cars and increasing frequency the Canada Line can easily handle demand for the next few decades.
     
     
  #6793  
Old Posted Aug 8, 2010, 5:03 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by whatnext View Post
Which makes the shortsighted undercapacity of the line even more perplexing. If you want to get more people out of cars transit has to be more appealing. Having it jam-packed almost from the word go isn't the way to do it.
Perhaps you missed the part of the article that this "shortsighted undercapacity" Canada Line was able to handle 280,000 people during its busiest day during the Olympics.

Many transit systems around the world would be happy to have our problem - a new transit line that is reaching its ridership targets earlier than expected, and it doesn't appear that the ridership numbers are levelling off. The operators have experimented with running more trains per hour during the 'off hours' between the morning and afternoon rush hours because they apparently are surprised that the Canada Line is being used so much outside of the rush hours.

Since it was able to handle the Olympic crowds that were several times today's current volume, I'm not worried about the line's ability to grow to handle 300,000 daily passengers as new trains are added to the fleet. However,even if the money was found to buy more trains to add capacity, it would be years before they arrive and can get pressed into service.


Undoubtedly if the Canada Line daily ridership was only running 60,000 or 70,000 there would be people complaining that it was over-built and under-used and a waste of money just to get Olympic visitors to & from the airport easier.
     
     
  #6794  
Old Posted Aug 8, 2010, 7:47 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
I was one of the people who hated the short platforms the most.
However, I have started to think that multiple medium capacity routes is better in the long run than one massive capacity line. If there were one or two north-south LRT lines in Vancouver eventually too, it would be better to have those three lines than just one massive line, giving more travel options and more stations. My only complaint as that Expo line platforms can be extended to 120 one day if necessary, but the Canada line's platforms can't be extended past 50, But I do realise the cost involved, and I do think in the long run we will have several north-south routes and the Canada Line won't be so over capacity that it will have turned out it was under designed.
     
     
  #6795  
Old Posted Aug 8, 2010, 8:25 AM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Quote:
Originally Posted by red-paladin View Post
I was one of the people who hated the short platforms the most.
However, I have started to think that multiple medium capacity routes is better in the long run than one massive capacity line. If there were one or two north-south LRT lines in Vancouver eventually too, it would be better to have those three lines than just one massive line, giving more travel options and more stations. My only complaint as that Expo line platforms can be extended to 120 one day if necessary, but the Canada line's platforms can't be extended past 50, But I do realise the cost involved, and I do think in the long run we will have several north-south routes and the Canada Line won't be so over capacity that it will have turned out it was under designed.
The thing you have to remember is that the Canada Line 50m platforms are enough, even if none of your suggested parallel lines are built. The platforms only seem short because the Bombardier system has narrow trains and needs long platforms to compensate. As-is the Canada Line is nearly equivalent to a 3-car MKII line. The extended trains will be equivalent to a 4-car MKII line. This is good enough for our city's north-south line. I would love to have long London-style platforms, but it moved just under 300,000 one day as-is. The line has proven itself. The designers were right about the capacity of its wide trains, and we in the peanut gallery were wrong.
     
     
  #6796  
Old Posted Aug 8, 2010, 6:37 PM
Lee_Haber8 Lee_Haber8 is offline
Registered User
 
Join Date: Aug 2005
Posts: 757
Quote:
Originally Posted by eduardo88 View Post
The line can run at up to 15 000pph, with operations 20hours per day means 300 000 riders per day. Although we all would have liked for longer platforms, with C-cars and increasing frequency the Canada Line can easily handle demand for the next few decades.
That 15000 is per direction, so theoretically it could handle twice that amount or 600000
__________________
www.winnipegrapidtransit.ca
     
     
  #6797  
Old Posted Aug 8, 2010, 8:13 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,205
If you run at it capacity for 20 hours day, which doesn't match usage patterns at all.
__________________
"It's ok, I'm an engineer!" -Famous last words

Last edited by Alex Mackinnon; Aug 8, 2010 at 8:56 PM. Reason: grammar
     
     
  #6798  
Old Posted Aug 8, 2010, 8:38 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Alex Mackinnon View Post
If you run it capacity for 20 hours day, which doesn't match usage patterns at all.
Even with the crush of Olympic crowds all day, it only got to 93% of design capacity on its busiest day.

It will be a few decades before this line tops 200,000 daily riders, and I doubt any of us will be around to see it hit 300,000 daily riders.
     
     
  #6799  
Old Posted Aug 8, 2010, 8:55 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
ˆˆˆ Speak for yourself I will be around.

How many trains would be required to maintain 90s headway+3m headway on the ends, and what would be the cost for trains for that? Then once that's done then go to 3-car?
     
     
  #6800  
Old Posted Aug 8, 2010, 11:20 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by jsbertram View Post
It will be a few decades before this line tops 200,000 daily riders, and I doubt any of us will be around to see it hit 300,000 daily riders.
If gas prices go up significantly or if there comes to be a more general realization of how much trouble consuming the stuff is getting us into (in more ways than one), you could live to be wrong about that one...
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:44 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.