  #4321  
Old Posted Jul 19, 2010, 6:05 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,149
what about reinvesting into public transit.

palm to face
     
     
  #4322  
Old Posted Jul 19, 2010, 6:05 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Good news.

I want to know when they're going to start working on the unsightly ROW in the NE. I'd like to see the leg north of downtown get the same asthetic treatment as the south side
     
     
  #4323  
Old Posted Jul 19, 2010, 9:13 PM
TimB09 TimB09 is offline
Registered User
 
Join Date: Oct 2006
Location: Edmonton
Posts: 1,526
Quote:
Originally Posted by Shodan View Post
Century Park LRT parking saves millions for Edmonton
$15M freed up for roadwork as Heritage Valley lot not needed


edmontonjournal.com
July 19, 2010 11:23 AM

EDMONTON — Putting a parking lot at the Century Park LRT station is producing a multimillion-dollar benefit for Edmonton’s transportation system.

The station was scheduled to be served by a regional lot in Heritage Valley linked to the station by a shuttle bus.

But that plan was put on hold after the city arranged last fall to build a temporary 1,230-stall gravel lot beside the station on leased land not yet required for the Century Park condo development...

© Copyright (c) The Edmonton Journal

http://www.edmontonjournal.com/news/Century+Park+parking+saves+millions+Edmonton/3296187/story.html
Have you seen that parking lot at Century Park? Ohhh man. You need to be 4x4ing to go through there and not lose some teeth along the way.
They should look at putting some money into that parking lot to make it a little safer for everyone.
     
     
  #4324  
Old Posted Jul 19, 2010, 9:38 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Just run a grader over it.

No sense spending $$ on a temporary leased lot
     
     
  #4325  
Old Posted Jul 19, 2010, 11:36 PM
TimB09 TimB09 is offline
Registered User
 
Join Date: Oct 2006
Location: Edmonton
Posts: 1,526
Quote:
Originally Posted by 240glt View Post
Just run a grader over it.

No sense spending $$ on a temporary leased lot
Yeah, they better do something about it. Not the greatest.
Didn't realize it was a temp lot anyways.
They should have built that park and ride there when they had the chance.
Oh well.
     
     
  #4326  
Old Posted Jul 20, 2010, 2:23 AM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Oh I'm sure there will be a park & ride at the end of that leg but it will be at Heritage Valley when they push the LRT down there. The temporary CP lot is only for the time that the line ends there.
     
     
  #4327  
Old Posted Jul 20, 2010, 3:12 PM
MrOilers MrOilers is offline
Registered User
 
Join Date: Apr 2008
Location: Edmonton
Posts: 2,498
Quote:
Originally Posted by hilman View Post
The few remaining stations are currently being upgraded from 4 to 5 car platform lengths. The power is also being upgraded to allow 4 train lengths of the new SD160 cars (from 3 car lengths).
Will this be done by the end of August? Those 3 car trains are barely cutting it right now.

I am going to be depending on the LRT this fall, and I am getting a little scared with how crammed it is right now WITHOUT all the the U of A and MacEwan students on top of it.

I'll change habits, or whatever. No problem. But I can't afford to be left behind on the platform to be late for my job the first week of September before figuring it all out...
     
     
  #4328  
Old Posted Jul 20, 2010, 3:26 PM
dancinb dancinb is offline
Registered User
 
Join Date: Dec 2008
Posts: 415
^ From http://edmonton.ca/transportation/ets/transit-news.aspx

"The major projects include South LRT platform extensions at McKernan/Belgravia and Health Sciences stations to accommodate 5-car trains. Construction is underway from June to October.

The Northeast LRT Line Signal System upgrade will provide better on-time service and improved safety at level crossings. Work is underway with completion scheduled for April 2011. Northeast Ductline installation will assist the signal system upgrade, by installing a new ductline along the line between Churchill and Clareview stations with completion scheduled for August 2010.

The Northeast LRT Line Electrical System upgrade will allow operation of 4-car and 5-car trains using the new vehicles. Work along the right-of-way is scheduled from June to early 2011. Substation upgrades are scheduled from July to December 2010."
     
     
  #4329  
Old Posted Jul 20, 2010, 3:31 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Quote:
Originally Posted by MrOilers View Post
Will this be done by the end of August? Those 3 car trains are barely cutting it right now.

I am going to be depending on the LRT this fall, and I am getting a little scared with how crammed it is right now WITHOUT all the the U of A and MacEwan students on top of it.

I'll change habits, or whatever. No problem. But I can't afford to be left behind on the platform to be late for my job the first week of September before figuring it all out...
Lots of students moving into our area too for the cheaper housing and easy access to the U. House enxt door was just bought by a U student who plans to rent two extra rooms to other students, and at least two other houses on the block are full of students as well. It'll be interesting to see what happens come september.
     
     
  #4330  
Old Posted Jul 20, 2010, 3:33 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Quote:
Originally Posted by dancinb View Post
^ From http://edmonton.ca/transportation/ets/transit-news.aspx

"The major projects include South LRT platform extensions at McKernan/Belgravia and Health Sciences stations to accommodate 5-car trains. Construction is underway from June to October.

The Northeast LRT Line Signal System upgrade will provide better on-time service and improved safety at level crossings. Work is underway with completion scheduled for April 2011. Northeast Ductline installation will assist the signal system upgrade, by installing a new ductline along the line between Churchill and Clareview stations with completion scheduled for August 2010.

The Northeast LRT Line Electrical System upgrade will allow operation of 4-car and 5-car trains using the new vehicles. Work along the right-of-way is scheduled from June to early 2011. Substation upgrades are scheduled from July to December 2010."
THey'd better be doing some landscaping along with that project.
     
     
  #4331  
Old Posted Jul 20, 2010, 3:38 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,149
^no kidding... even if simply some blue spruce and columnar aspens.
     
     
  #4332  
Old Posted Jul 20, 2010, 3:50 PM
dancinb dancinb is offline
Registered User
 
Join Date: Dec 2008
Posts: 415
Right now they just have stacks of pipe along the ROW although I assume trees would come later.
     
     
  #4333  
Old Posted Jul 21, 2010, 2:44 AM
RicoLance21's Avatar
RicoLance21 RicoLance21 is offline
Bring buildings to life
 
Join Date: Mar 2005
Location: Windsor Park, Calgary
Posts: 2,463
Unique view of downtown Edmonton

http://www.youtube.com/watch?v=KpB1jOgZN00
     
     
  #4334  
Old Posted Jul 22, 2010, 4:59 PM
CMD UW's Avatar
CMD UW CMD UW is offline
Urbis Maximus
 
Join Date: Feb 2002
Location: Edmonton
Posts: 12,010
Quote:
Originally Posted by MrOilers View Post
Will this be done by the end of August? Those 3 car trains are barely cutting it right now.

I am going to be depending on the LRT this fall, and I am getting a little scared with how crammed it is right now WITHOUT all the the U of A and MacEwan students on top of it.

I'll change habits, or whatever. No problem. But I can't afford to be left behind on the platform to be late for my job the first week of September before figuring it all out...
You are right. The 7:20AM train departing Century Park usually fills up the seats, by Southgate people are standing, by South Campus it becomes a sardine can. We need to be running 5-cars right now during peak hours. September will be very, very interesting.

Once again, the ridership response to the south LRT shows how much demand there is for the LRT.
     
     
  #4335  
Old Posted Jul 22, 2010, 5:01 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
^ try getting on at Stadium after the train has hit Clareview, Belvedere and Collesium.. same thing.

It's even worse at the end fo the day though. Three times in the past two weeks a train has rolled up and everyone on the platform gorans as they see all the people pressed up against the windows
     
     
  #4336  
Old Posted Jul 23, 2010, 12:03 AM
dancinb dancinb is offline
Registered User
 
Join Date: Dec 2008
Posts: 415
Quote:
Originally Posted by 240glt View Post
^ try getting on at Stadium after the train has hit Clareview, Belvedere and Collesium.. same thing.

It's even worse at the end fo the day though. Three times in the past two weeks a train has rolled up and everyone on the platform gorans as they see all the people pressed up against the windows
You people must get to work earlier than I do. I get on at Stadium at about 8:15 and there's only ever a small handful of people standing and there's a few empty seats here and there. On the way home after 5pm I have my choice of seats many days.
     
     
  #4337  
Old Posted Jul 23, 2010, 12:53 AM
Xelebes's Avatar
Xelebes Xelebes is offline
Sawmill Billowtoker
 
Join Date: Nov 2006
Location: Rockin' in Edmonton
Posts: 14,027
Most workplaces I've been to, outside of government and charities, start at 8 in the morning and get off at 4:30 in the afternoon. I think this is done so that people's commutes at the end of the day will always have sunlight - especially in the winter.
     
     
  #4338  
Old Posted Jul 29, 2010, 3:31 PM
Jarrod's Avatar
Jarrod Jarrod is offline
I'm cheap
 
Join Date: Jan 2006
Location: Edmonton, AB
Posts: 1,216
So, there is now going to be a bus to the airport, Leduc and Nisku starting August 30th that starts and ends at Century Park. Not sure if it's been posted...

http://www.edmonton.ca/transportation/ets/transit-news.aspx
     
     
  #4339  
Old Posted Jul 29, 2010, 3:36 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Quote:
Originally Posted by dancinb View Post
You people must get to work earlier than I do. I get on at Stadium at about 8:15 and there's only ever a small handful of people standing and there's a few empty seats here and there. On the way home after 5pm I have my choice of seats many days.

I am at Stadium station @ 07:35 and the trains are full. @ Churchill headed north @ 16:30 the trains are packed!
     
     
  #4340  
Old Posted Jul 29, 2010, 3:48 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,302
Quote:
Originally Posted by Jarrod View Post
So, there is now going to be a bus to the airport, Leduc and Nisku starting August 30th that starts and ends at Century Park. Not sure if it's been posted...

http://www.edmonton.ca/transportation/ets/transit-news.aspx
Score! No more SkyShuttle. Too bad it won't be in service when I stay over at my brother-in-law's in Leduc.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton
Forum Jump



Forum Jump


All times are GMT. The time now is 12:13 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.