Quote:
Originally Posted by hilman
The few remaining stations are currently being upgraded from 4 to 5 car platform lengths. The power is also being upgraded to allow 4 train lengths of the new SD160 cars (from 3 car lengths).
|
Will this be done by the end of August? Those 3 car trains are barely cutting it right now.
I am going to be depending on the LRT this fall, and I am getting a little scared with how crammed it is right now WITHOUT all the the U of A and MacEwan students on top of it.
I'll change habits, or whatever. No problem. But I can't afford to be left behind on the platform to be late for my job the first week of September before figuring it all out...