Quote:
Originally Posted by Bassic Lab
I am still relatively undecided on the virtues of the 17th Ave SE BRT. I, as stated earlier, definitely place it behind the primary C-Train network.
|
I'm going to side with Fusili here, on the proviso that the 17th Ave SE BRT can be built for a reasonable price.
Quote:
Originally Posted by Bassic Lab
[...]an upgrade to LRT. That has the makings of an even worse situation than 36th St NE written all over it. This is because 17th has far more crossings than 36th. Forest Lawn blocks are also short east-west
(the opposite of downtown blocks) so consists would be limited to a max of 3 cars and even that might be a little tight.
|
The fix is to close off all the entrances to 17th other than major entrance points. 16th and 19th Ave already work as "back road" local access roads - they would function more so under my scheme - I would leave only 28th, 36th, 44th, and 52nd St. open with full traffic movement - probably 1-2 roads in between as right hand only intersections. Lots of room for BRT and eventual LRT stations. To keep it cheap, I'd say the plan of BRT 1st then eventual LRT would work, assuming BRT could be built cheap enough. Build the SE LRT while waiting for 17th SE to densify/sprawl enough to justify LRT.
Quote:
Originally Posted by Bassic Lab
Ogden-Lynnwood-Riverbend is not that much smaller than Greater Forest Lawn.
|
However, the reasonable priced route for the LRT will run along the edge of the community, leaving 1/2 the station radius serving nothing - since a rail yard and an irrigation canal separate it from even the meager commuters numbers the industrial area would provide.
Quote:
Originally Posted by Bassic Lab
There is also a fantastic opportunity to develop Quarry Park into and urban area from the start.
|
Too late. It will be built out by the time LRT gets there - assuming we are not in for a double - dip recession.
Quote:
Originally Posted by Bassic Lab
Throw in the ballooning suburbs of the SE and there is a lot of potential.
|
Alright, this is where the LRT starts to shine - but we are talking Mckenzie Town before it really works. Douglasdale suffers the same problem as Ogden - the station radius serves only 1/2 residential, and forget re-development - the industrial is built out, and the remaining large parcel of undeveloped land near the LRT will never be built on - former fertilizer plant waste dump - nothing can be built on it - I know because I work on said site and have talked to the reclamation people about this 1/4 section.
Quote:
Originally Posted by Bassic Lab
The 8th Ave Subway is needed to allow the six lines of the skeleton network to actually function.
|
I agree with this point. 8th Ave Subway needs to be built, which would help alleviate the need for a SE line, plus help the inner south LRT commute be more bearable.
Quote:
Originally Posted by Bassic Lab
So I think 17th Ave SE should wait until those three projects are complete.
|
To pull together my thoughts, I'd build 17th Ave BRT as my #2 project, with 8th Ave subway as my #1 project - providing that 17th Ave BRT ties into the 202 NE LRT line, and with the 201 line being diverted into a subway, the 202 frequency could be bumped up to handle the flow coming in at Max Bell as per Wooster's suggestion, which I think is a better use of $, because 17th Ave is going to have to be built cheap, so that SE LRT is not delayed too many years in the future. SE LRT is just going to be too expensive to get it out where it needs to be, and really, even if the subway downtown is dumped as part of the initial plan, SE LRT needs to go to McKenzie Town at least in order to be really useful. As far as where in the priority queue the North line should fall, if it were to be a subway along Centre, the price could be out of this world, putting it #4 after the SE LRT, even if they went up Nose Hill Creek, the benefits drop so much I'd still leave it at #4.
Quote:
Originally Posted by Bassic Lab
I do have my own thoughts on what would be best for [17th Ave] corridor as part of my dream system. It involves tunnelling at least the roughly two miles from 26th St/Barlow to just past 52nd and then continuing the line to Chestermere on the surface. It would then be able to function as a full rapid transit line
|
Why underground? Is it due to what you refer to above with the short block lengths? One other point about 17th Ave SE for those who don't go through there at all - it's a WIDE corridor - 4 lane road with left hand bails, and medians on the sides that allow for parking - it just seems like such a crappy road since the bit east of 36th to 50th st. has not had the road widened any to take advantage of all the space. However, with all the space, it's perfect to put BRT/LRT down the middle, as you'd still have 4 lanes of traffic, plus turn bays where you would need them with hardly a building to be torn down to make room. It's really one of the last places I'd put things underground. Skytrain above ground, perhaps - with buckets of money, but you don't really need it there.