HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #901  
Old Posted Jul 14, 2010, 5:26 PM
mooky mooky is offline
Registered User
 
Join Date: Sep 2008
Posts: 482
I believe the side signs are only on the series 8 SD160's which we only have had 2 arrive, and I don't believe the first is even in service yet. But I do remember seeing the side signs on Edmonton's new LRV's.

I assume the old SD160's could be retrofitted, but if they will is anyone's guess.
     
     
  #902  
Old Posted Jul 15, 2010, 2:33 AM
SubwayRev's Avatar
SubwayRev SubwayRev is offline
Registered User
 
Join Date: Aug 2007
Location: Calgary
Posts: 445
I found this article in Wired about New York gridlock. What I found interesting is the suggestion of not charging for buses, as the time lost from people feeding coins into the bin actaully costs the city more money than they can collect from fares.

http://www.wired.com/magazine/2010/05/ff_komanoff_traffic/
     
     
  #903  
Old Posted Jul 15, 2010, 3:37 AM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by SubwayRev View Post
I found this article in Wired about New York gridlock. What I found interesting is the suggestion of not charging for buses, as the time lost from people feeding coins into the bin actaully costs the city more money than they can collect from fares.

http://www.wired.com/magazine/2010/05/ff_komanoff_traffic/
Komanoff's work is really interesting. What was really interesting was how he calculated that each driver costs the city of New York something like $128. I like the argument that they should just provide transit for free, because it actually costs the city less than what drivers cost the city.
     
     
  #904  
Old Posted Jul 15, 2010, 6:30 AM
DarkKeyo DarkKeyo is offline
Transit/Cartography Geek
 
Join Date: May 2008
Location: Burnaby
Posts: 332
Quote:
Originally Posted by mersar View Post
Remember theres also side destination signs on the trains as well now.
Aren't those inside the trains? Though if they're outside too, then all the better.
     
     
  #905  
Old Posted Jul 15, 2010, 6:57 AM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by DarkKeyo View Post
Aren't those inside the trains? Though if they're outside too, then all the better.
Theres inside facing ones at the end, plus one on the side windows facing out on each side on the new Series 8 LRV's.
__________________

Live or work in the Beltline? Check out the Official Beltline web site here
     
     
  #906  
Old Posted Jul 15, 2010, 4:53 PM
freeweed's Avatar
freeweed freeweed is offline
Home of Hyperchange
 
Join Date: Sep 2006
Location: Dynamic City, Alberta
Posts: 17,568
Quote:
Originally Posted by SubwayRev View Post
I found this article in Wired about New York gridlock. What I found interesting is the suggestion of not charging for buses, as the time lost from people feeding coins into the bin actaully costs the city more money than they can collect from fares.

http://www.wired.com/magazine/2010/05/ff_komanoff_traffic/
Sounds like our LRT honour system for fares. Would cost more money to change how it works than you'd bring in from caught fares. At least I imagine someone's ran the numbers on this at one point...
     
     
  #907  
Old Posted Jul 15, 2010, 4:55 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by freeweed View Post
Sounds like our LRT honour system for fares. Would cost more money to change how it works than you'd bring in from caught fares. At least I imagine someone's ran the numbers on this at one point...
Similar, but not exactly. It is amazing to find out that taking public transit, even for free, costs the city less than someone driving. Damn those externalities!
     
     
  #908  
Old Posted Jul 15, 2010, 7:48 PM
outoftheice outoftheice is offline
Registered User
 
Join Date: Jan 2009
Posts: 914
Well things really seem to be picking up speed with construction of the SE LRT using the $800 million Green Trip funds... at this rate I could see this being a done deal before the election with construction beginning as soon as the West LRT is completed. I really wanted to see this money leveraged into a P3 construction contract to build the SE LRT tied in to a Centre Street subway alignment of the NC LRT. I figured since this new route would be completely independent of Calgary's existing LRT infrastructure, they could have attracted very competitive bids from some of the world's biggest transportation companies (ie: Bombardier). Even if my dream scenario won't be coming true, this is still a positive step forward for Calgary....

Quote:
Aldermen back bid to use grant for southeast LRT line


Calgary Herald July 15, 2010

Transit - The southeast LRT is getting rapid approval from aldermen, who unanimously backed a bid at committee Wednesday to build it with the province's Green Trip transit grants.

Much of the Calgary region's $800-million share of the funding would go to a downtown-to-Douglasglen line touted by Ald. Bob Hawkesworth, who will ask full council to back the plan Monday.

The funding application to Alberta Transportation is due in November. Initially, city officials proposed getting only the LRT line's design study to be considered for a Green Trip grant.

"If I'd not brought this forward, council would have missed out," Hawkesworth said.

Transit planners estimate that the full line, starting underground at Eau Claire and extending to the south Calgary hospital at Seton, would cost $1.5 billion.


Read more: http://www.calgaryherald.com/news/Alderm...st+line/3280126/story.html#ixzz0tmYlgdIT
     
     
  #909  
Old Posted Jul 15, 2010, 8:05 PM
ue ue is offline
BANNED
 
Join Date: Apr 2009
Location: WPG
Posts: 9,493
When is the NC/SE LRT lines expected to start/complete by?
     
     
  #910  
Old Posted Jul 15, 2010, 8:17 PM
ClaytonA ClaytonA is offline
Registered User
 
Join Date: Dec 2009
Posts: 601
Quote:
Originally Posted by outoftheice View Post
Well things really seem to be picking up speed with construction of the SE LRT using the $800 million Green Trip funds... at this rate I could see this being a done deal before the election with construction beginning as soon as the West LRT is completed. I really wanted to see this money leveraged into a P3 construction contract to build the SE LRT tied in to a Centre Street subway alignment of the NC LRT. I figured since this new route would be completely independent of Calgary's existing LRT infrastructure, they could have attracted very competitive bids from some of the world's biggest transportation companies (ie: Bombardier). Even if my dream scenario won't be coming true, this is still a positive step forward for Calgary....
+1 for the City itself versus the region (Okotoks commuters etc) I'd rather the SE LRT gets built than the remaining ring roads.
     
     
  #911  
Old Posted Jul 15, 2010, 8:31 PM
You Need A Thneed's Avatar
You Need A Thneed You Need A Thneed is offline
Construction Enthusiast
 
Join Date: Feb 2007
Location: Castleridge, NE Calgary
Posts: 5,892
Quote:
Originally Posted by edmontonenthusiast View Post
When is the NC/SE LRT lines expected to start/complete by?
The is no timeline yet.
     
     
  #912  
Old Posted Jul 15, 2010, 9:47 PM
DarkKeyo DarkKeyo is offline
Transit/Cartography Geek
 
Join Date: May 2008
Location: Burnaby
Posts: 332
Quote:
Originally Posted by outoftheice View Post
Well things really seem to be picking up speed with construction of the SE LRT using the $800 million Green Trip funds... at this rate I could see this being a done deal before the election with construction beginning as soon as the West LRT is completed. I really wanted to see this money leveraged into a P3 construction contract to build the SE LRT tied in to a Centre Street subway alignment of the NC LRT. I figured since this new route would be completely independent of Calgary's existing LRT infrastructure, they could have attracted very competitive bids from some of the world's biggest transportation companies (ie: Bombardier). Even if my dream scenario won't be coming true, this is still a positive step forward for Calgary....
I would rather see a SE to N route too, but I'll gladly settle for a SE route.... But they would save a lot of money on buses and gain a lot of ridership if it went just a bit further to mckenzie towne. And also if they dont build the tunnel downtown it needs to end at calgary tower and not 4th st. I wonder which of them I should email to tell them that...
     
     
  #913  
Old Posted Jul 15, 2010, 10:17 PM
mooky mooky is offline
Registered User
 
Join Date: Sep 2008
Posts: 482
The SE route will end at 11th'ish avenue on 2nd street until downtown tunnel money is found, and that is fine with me.

Have they changed the south terminus? I was under the assumption it was Seton and the south hospital.

I'm hoping if they do the 2nd street tunnel and 8th avenue tunnel together after (again makes sense from a cost savings perspective) and end the SE line in Eau Claire somewhere, at that time, at whatever future date that is, they'll see the logical efficiency of taking the next step and plan to run it up center street as a subway. The 301N BRT carries a hell of a lot of people up Center street already and it fits planIT.
     
     
  #914  
Old Posted Jul 15, 2010, 10:38 PM
ue ue is offline
BANNED
 
Join Date: Apr 2009
Location: WPG
Posts: 9,493
Is there a map of the proposed NC and SE LRT lines (perhaps including the current/under construction NW/S/W/NE lines)? The only routes I've seen were from at latest 2005. I'm just not sure these maps are the most up-to-date and maybe routings have changed since then.

Sorry for all the questions of late.
     
     
  #915  
Old Posted Jul 15, 2010, 10:53 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,592
Quote:
Originally Posted by edmontonenthusiast View Post
Is there a map of the proposed NC and SE LRT lines (perhaps including the current/under construction NW/S/W/NE lines)? The only routes I've seen were from at latest 2005. I'm just not sure these maps are the most up-to-date and maybe routings have changed since then.

Sorry for all the questions of late.
Unlike most cities Calgary's routes for the most part haven't changed much in a very long time - the only real question these days is which route and which line the NCLRT will take & join. Everything else has been set for at least 5 years, with the outer parts of the lines for at least 15.
     
     
  #916  
Old Posted Jul 15, 2010, 10:54 PM
fusili's Avatar
fusili fusili is offline
Retrofit Urbanist
 
Join Date: Sep 2007
Posts: 6,692
Quote:
Originally Posted by DarkKeyo View Post
I would rather see a SE to N route too, but I'll gladly settle for a SE route.... But they would save a lot of money on buses and gain a lot of ridership if it went just a bit further to mckenzie towne. And also if they dont build the tunnel downtown it needs to end at calgary tower and not 4th st. I wonder which of them I should email to tell them that...
The route will stop at 4th Street SE, because after that it will go underground. At the Calgary tower, it might already be a tunnel (Tunnel with either start at 1st SE or 2nd Street SW). An underground station is planned at Centre street and 10th Avenue SW, after which it turns north up 2nd street and goes into downtown with stops at 6th avenue and Eau Claire. I have the functional study for the SE LRT Glenmore to Downtown section and the Downtown LRT feasibility study on my computer. If you want it, PM me so I can email it to you.
     
     
  #917  
Old Posted Jul 15, 2010, 11:03 PM
ue ue is offline
BANNED
 
Join Date: Apr 2009
Location: WPG
Posts: 9,493
Quote:
Originally Posted by Sir.Humphrey.Appleby View Post
Unlike most cities Calgary's routes for the most part haven't changed much in a very long time - the only real question these days is which route and which line the NCLRT will take & join. Everything else has been set for at least 5 years, with the outer parts of the lines for at least 15.
Thanks. There is more than one route choice for the NCLRT? The only one I've seen is along Deerfoot going past YYC. What are the other ones?

Also, what will these routes look like Downtown? The only maps I've seen of are city-wide. When mooky said that the SELRT could end at 11th Ave, does that mean the SELRT will be going through the Beltline?
     
     
  #918  
Old Posted Jul 15, 2010, 11:13 PM
Wooster's Avatar
Wooster Wooster is offline
Round Head
 
Join Date: Nov 2003
Posts: 12,689
Quote:
Originally Posted by edmontonenthusiast View Post
Thanks. There is more than one route choice for the NCLRT? The only one I've seen is along Deerfoot going past YYC. What are the other ones?

Also, what will these routes look like Downtown? The only maps I've seen of are city-wide. When mooky said that the SELRT could end at 11th Ave, does that mean the SELRT will be going through the Beltline?
See the downtown section of this map by srperry. Basically long term it is planned to go like this. At first, the SE will likely terminate at what he's called "olympic way". As the downtown tunnels on 8th ave and 2nd street or built, theoretically the SE line will terminate at Eau Claire. Ultimately, most people hope that the SE line will then run north below centre street and form the North-Central line - instead of the route up Nose Creek along Deerfoot trail.

http://www.members.shaw.ca/lrtincalgary/FutureMap.html
     
     
  #919  
Old Posted Jul 15, 2010, 11:19 PM
ue ue is offline
BANNED
 
Join Date: Apr 2009
Location: WPG
Posts: 9,493
Thanks Wooster. Looks quite ambitious and promising. After all this is done...seems like only areas left really are SW areas around Mount Royal University, Beltline/Mission (which could be served by a potential "C-Tram" versus C-Train), the airport, and maybe Airdrie.
     
     
  #920  
Old Posted Jul 15, 2010, 11:27 PM
Jack Doe's Avatar
Jack Doe Jack Doe is offline
Ack Thptf
 
Join Date: Jun 2010
Location: Land of Kings
Posts: 140
The Downtown LRT Report is here:

http://www.calgarytransit.com///html/reports_surveys.html

click on "Downtown LRT Feasiblity Study" - March 13, 2006 (17.8 MB)
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:36 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.