Quote:
Originally Posted by Zassk
But it would not have been integrated at all. The 3-meter MKII cars of the RAV line would have been incompatible with the other lines, and could not even have travelled through the Expo stations to reach the Edmunds OMC. So you would still have had a completely incompatible line (albeit built by the same manufacturer), with no track connections, and still a separate OMC. And you would have had an ugly trench for 25 blocks in south Vancouver instead of tunnel.
Admit it, it was a bad bid by Bombardier. Yes, in an ideal world, we would have had another line with compatible 2.5-meter MKII cars and a shared OMC, but that was never submitted as a bid. Your guess is as good as mine as to why.
|
That's incorrect. Bombardier presented an alternate plan that would have integrated our existing SkyTrain infrastructure utilizing the existing Translink SkyTrain fleet, with rail infrastructure that uses the same specifications as the Millennium and Expo Line. That means 2.5-metre wide Mark II cars. And it likely included 80-metre platforms.
The cost came at $1.8-billion.
RAVCO said no, wanting a "fair bidding process". It rejected Bombardier's integration plan, even though it would have saved you and I money, and told Bombardier to go back to the drawing board and build a new separate system with 3-metre wide trains, etc.
SNC-Lavalin won the bid with its $1.76-billion proposal, which later became $2.05-billion.
Quote:
And I still don't see how you can think of 3-meter cars and 80-meter platforms as "forward thinking". Building stations long enough for 5-car trains with wider cars than E/M Line? That's capacity for something like 1000 passengers per train. Why does Canada Line need that? That would be a dubious proposition even for the Broadway line. The RAV line will never have enough ridership for that, even if it is extended all the way to Ladner and Tsawwassen.
It was just a bad proposal and that's why it lost.
|
Who says that Bombardier's resubmitted 3-metre wide train proposal included 80-metre platforms? Besides 3-metre wide trains, nobody really knows much about the second Bombardier plan. These cars could also have theoretically been longer than the Mark II's we have - meaning at full length 3-metre, four 20-metre car, Mark II trains.
And with 3-metre wide trains and 80-metre platforms, that gives the Canada Line a capacity of about 28,000 pphpd. That's on par with the Millennium and Expo Lines.
Never say never...back in the day, those who planned and built the Expo Line could never fathom the success it has become today.
Regardless, Bombardier had the right proposal the first time. But the

we call planners rejected it.