Quote:
Originally Posted by Zassk
To me there are only two real possibilities, and both involve tunneling.
1) Bombardier wins contract, builds line as an extension of Millennium Line, and probably subcontracts the tunnel construction to SNC-Lavalin (as was done for M-Line guideway).
2) SNC-Lavalin wins contract, builds the tunnel itself, and ties the track to Canada Line (maybe 4-car Rotems). Bombardier is subcontracted for a 2.5 km extension of M-Line from VCC to Cambie.
Before you scoff at #2, consider that SNC-Lavalin can offer a no-transfer ride between downtown and Broadway/UBC, which Bombardier is unable to offer. Obviously this would require some changes like downtown station expansions.
SNC-Lavalin will probably be involved in this project no matter what (either as prime or subcontractor), so I would expect them to submit some kind of proposal that leverages their Canada Line.
To me, this is the only conceivable proposal that could cause things to turn out differently than we expect.
|
1) Yes.
2) No. The main issue with the Broadway West extension is cost. Attempting to tie it with the Canada Line would only increase costs even more.
And it's not worth the 9-figure plus cost to make it an extension of the Canada Line, not to mention that SkyTrain and the Canada Line Rotem's are not compatible at all...different propulsion systems, track size, etc.
Having an interchange between Broadway West SkyTrain and the Canada Line at Broadway/Cambie/City Hall would be enough leverage for SNC-Lavalin as is...there's going to be a huge wave in new ridership on the Canada Line with the future interchange/transfer (which I think could push the Canada Line to max. capacity very quickly), and going beyond that would mean the Canada Line would take in far more than it can chew.
In some cases, like Lougheed Station, the benefits outweigh the costs of having a seamless transferless train ride. But this is not a case.
By the time the Broadway West extension is built, expect to see 200,000 passengers per day within a year of opening.
And on the topic of the future interchange at Broadway/Cambie, the underground passageways between both stations need to be big and wide.