The truss launcher (looking from WB Bow Trail). The sections on the far left haven't been connected to the rest yet, when completed it will be ~150m long I've been told)

And again (looking from the 14th Street to 9th Ave ramp)

Sunalta Station columns from Pumphouse Ave SW

Sunalta Station (from 10th Ave SW)

Stacks of frames at 45th Street SW

The dirt that has been excavated along the route, mostly from the Westbrook station site

The new West High School is coming along nicely.
I was also looking at who is working along the route, so far I've seen KLS doing excavation, Whissel doing utilities and sewer, Graham appears to be doing the trench (all the metal forms have their name on them) along 17th ave and North American foundations doing work on the guideway piers.