Quote:
Originally Posted by frinkprof
I don't have a problem with how long WLRT will take. I'd really like to see the smaller extensions like Crowfoot or McKnight-Westwinds go a lot quicker. Crowfoot was ridiculous, labour shortage or not.
|
I was really perplexed by the time these extensions took, especially in comparison to the general haste that seems to characterize construction generally in Calgary (a big shock to my Ottawa eyes, though even to them the Crowfoot extension seemed unusually long).
How is the NE extension going compared to these other two? It strikes me as a pretty straight forward at-grade extension along a reserved right-of-way with a minimum of relocation work - pretty close to ideal, I would think.