Green=High Floor
Orange=Low Floor
LRT in 2010

hosted at flickr.com
LRT in 2017. NAIT line complete, WLRT/MWLRT complete.

hosted at flickr.com
LRT in 2030. NAIT line starts to expand on redeveloping YXD and Whyte Ave/Sherwood Park line made happen. LRT to Gorman, Heritage Valley, and Evergreen.

hosted at flickr.com
LRT in 2040. LRT out to St. Albert in high floor, LRT out to YEG in high floor, MW line low floor extended down Ellerslie to Heritage Valley to connect to the YEG. LRT station added between Stadium and Churchill at 95/96 St.

hosted at flickr.com
LRT in 2050. LRT extended in Sherwood Park, South Campus splits off into two lines, one that currently exists to CP, another that goes out to Terwillegar. As well, 97 st LRT is built to service the northside communities between the NW and NE which were already served.

hosted at flickr.com
Beyond this?
-LRT to Ft Saskatchewan
-WLRT extension to Enoch
-LRT down Whitemud from MW to W Edmonton
-more stations on existing lines between existing stations
-LRT to Beaumont
-LRT down 23 Ave
-LRT down 34 ave
-LRT down 137 ave
-LRT down 118 Ave
-original 87 Ave LRT from Uni to West end
-extensions in St Alb
-LRT to Spruce Grove
-extension of Terwillegar line to Windermere
-LRT down Capilano/75 st
-LRT down 167 ave
-LRT down 17 St
-LRT down 170 St
-LRT to Devon
?