Quote:
Originally Posted by TransitJack
Trouble is, do we really want more 25+ year old cars added to our fleet, that would require a fair bit of modifications included in any retrofit (removing driver cab)?
Unless they gave them to us (because they really would only have scrap value at this point -- as there are so few systems in the world that could use them), I think it would be more productive to just purchase new MkII's. I can't see Translink buying old cars for nostalgia's sake.
The talk of reconstructing the RT line in Scarborough in favour of a LRT always seems weird to me... I mean the technology has been so successful here in Vancouver, yet seems to be shamed out of every other city worldwide (even a city who has it already - Scarborough).
|
there are 2 points in yours post:
-purchase the Scarborough RT to refurbish it:
it is probably a good idea: they are at mid life, and Translink is screaming for adding capacity. sure Mk1 have less capacity than MkII, but probably they could come at a fractional cost...so people have to compare cost of added added capacity by reburbished MKI vs brand new MKII.
Second point is why Toronto want get rid of its SRT
First:
SRT is popular and it is at capacity, but they can't expand the fleet because the SRT track profile can't accommodate MkII.
Secondly:
It snows a bit more in TO than in Vancouver, and the SRT is pretty sensible to the snow so the technology is less reliable in Toronto than in Vancouver
Thirdly
People in Scarborough are essentially frustrated by the transfer at Kennedy to the Bloor subway: that is the main drawback of the SRT...
A more classical LRT will not suppress the last point and for long time it was plan to expand the Bloor subway to Scarborough, but political animals don't try to resolve a problem, just to replace an existing one with a new one (that is the Darwinism theory justifying the survival of the specy).