HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #3201  
Old Posted Apr 24, 2010, 6:33 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
LOL. Fine.
     
     
  #3202  
Old Posted Apr 24, 2010, 6:39 AM
CBeats CBeats is offline
Registered User
 
Join Date: Mar 2009
Posts: 422
Quote:
Originally Posted by idunno View Post
TransLink looks at rapid transit options for Broadway corridor

Dobo said it takes about three weeks to build the rails for a tram and four years for an underground SkyTrain. “A light, modern European style tram is the way to go,” she said.

http://www.vancouversun.com/sports/Trans...ons+Broadway+corridor/2940318/story.html

3 weeks? Ha!

That's all I have to say.
     
     
  #3203  
Old Posted Apr 24, 2010, 7:10 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
This one is a classic:


The current diesel bus rapid transit is a disgrace and needs to be shutdown immediately. Only about 20% of the current 30,000 B-Line riders are "choice" riders and might drive if the B-Lines were not available. The other 80% are "captive" riders and are stuck on transit. They would take a horse and buggy if that is all that TransLink provided. Toxic and GHG emissions would drop dramatically, if we shutdown the B-Lines and simply allowed the 6,000 students who might drive, drive, because the B-Lines have a very low overall utilization rate and many B-Lines return empty to Commercial Drive during morning peak hours and conversely empty in late evening hours to UBC.

Any attempt to extend rapid transit to UBC is filled with a host of environmental and social issues (remember Cambie Street?) and is unaffordable. TransLink must tax non-transit users to spend billions of dollars to essentially remove, maybe 6,000 cars from the roads, if that, considering that some students car pool. Stupid. I cannot believe that the people behind it all have the nerve to even attempt to do it.

A much more obvious alternative to ripping up Broadway and diverting the stinking B-Lines to W 16th Avenue and W 4th Avenue for the next three to five years, causing much heart ache, is to use the Pacific Ocean which connects False Creek and UBC to run a ferry service with all the amenities for a comfortable 20 minute cruise to and from UBC. Duh?

Did anyone at TransLink think of that? How much would it cost? What do you do all day at TransLink, dick around in meetings without thinking? We could only save a few billion of dollars and operate the ferry service in less than one year instead of studying the rapid transit line for another 10 years. TransLink you are idiots who don’t deserve to be running transit in this city and are only in it to build a self-serving transit system to pay your extravagant salaries. Get lost and don’t bother saying goodbye.


http://www.straight.com/poll/what-kind-rapid-transit-do-you-want-see-along-broadway




This is so entertaining...and it's good to see that the masses (from what I can see in blogs and news article comment sections) are finally coming out and supporting SkyTrain.

Last edited by mr.x; Apr 24, 2010 at 7:55 PM.
     
     
  #3204  
Old Posted Apr 24, 2010, 7:22 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
I'm taking a break from studying here, I think people are a little too ahead of themselves on this. Keep in mind this is the first discussion and the different options being considered on the table are just ideas. Some of them good, some of them not so much, but whatever is the case, all and potentially more of these options will be under further review for the second consultation phase, and until then, there will be recommendations made.

And getting mad on TransLink on this one isn't right. This is the first time TransLink has made consultations available in such a great way, reaching out via TransLink forums, social media, Buzzer Blog, and allowing group discussions are free flowing ideas to be made and presented at workshops. I believe it's a great start because it allows different stakeholders to feel as if they are connected. Yes, each group has their own personal belief on what should be done to improve the situation on Broadway (or doesn't believe the situation needs to be improved at all... figures), but these idea workshops and public consultations can also be used as a form of better educating the public on the different options.

And if this keeps up, we can avoid many of the miscommunications that were present for the Canada Line (i.e. Cut-and-cover vs. bored tunnel) and hopefully keep the community and business owners excited for rapid transit development on the Broadway corridor.
     
     
  #3205  
Old Posted Apr 24, 2010, 4:14 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by mr.x View Post
This one is a classic:


The current diesel bus rapid transit is a disgrace and needs to be shutdown immediately. Only about 20% of the current 30,000 B-Line riders are "choice" riders and might drive if the B-Lines were not available. The other 80% are "captive" riders and are stuck on transit. They would take a horse and buggy if that is all that TransLink provided. Toxic and GHG emissions would drop dramatically, if we shutdown the B-Lines and simply allowed the 6,000 students who might drive, drive, because the B-Lines have a very low overall utilization rate and many B-Lines return empty to Commercial Drive during morning peak hours and conversely empty in late evening hours to UBC.

Any attempt to extend rapid transit to UBC is filled with a host of environmental and social issues (remember Cambie Street?) and is unaffordable. TransLink must tax non-transit users to spend billions of dollars to essentially remove, maybe 6,000 cars from the roads, if that, considering that some students car pool. Stupid. I cannot believe that the people behind it all have the nerve to even attempt to do it.

A much more obvious alternative to ripping up Broadway and diverting the stinking B-Lines to W 16th Avenue and W 4th Avenue for the next three to five years, causing much heart ache, is to use the Pacific Ocean which connects False Creek and UBC to run a ferry service with all the amenities for a comfortable 20 minute cruise to and from UBC. Duh?

Did anyone at TransLink think of that? How much would it cost? What do you do all day at TransLink, dick around in meetings without thinking? We could only save a few billion of dollars and operate the ferry service in less than one year instead of studying the rapid transit line for another 10 years. TransLink you are idiots who don’t deserve to be running transit in this city and are only in it to build a self-serving transit system to pay your extravagant salaries. Get lost and don’t bother saying goodbye.


http://www.straight.com/poll/what-kind-rapid-transit-do-you-want-see-along-broadway




This is so entertaining...and it's good to see that the masses (from what I can see in blogs and news article comment sections) are finally coming out and supporting SkyTrain.
Another example of why Nancy Regan was right when she said "Just Say No".
Too late for this person, sadly.
     
     
  #3206  
Old Posted Apr 24, 2010, 4:42 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,047
Quote:
Originally Posted by CBeats View Post
3 weeks? Ha!

That's all I have to say.
She said it would take about three weeks to build a tram line !! ?? !! ??
What has she been smoking, anyway?
Where can I get some??
     
     
  #3207  
Old Posted Apr 24, 2010, 4:49 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by trofirhen View Post
She said it would take about three weeks to build a tram line !! ?? !! ??
What has she been smoking, anyway?
Where can I get some??

Video Link
     
     
  #3208  
Old Posted Apr 24, 2010, 4:54 PM
Smooth's Avatar
Smooth Smooth is offline
Registered User
 
Join Date: Jan 2004
Location: Vancouver
Posts: 906
^ I think we only need to look at the Granville Street rehabilitation to see how long street car installation might take.
     
     
  #3209  
Old Posted Apr 24, 2010, 5:01 PM
Bureaucromancer Bureaucromancer is offline
Registered User
 
Join Date: Mar 2008
Posts: 106
I HAVE seen streetcar work done that fast in Toronto, and in the US it has apparently been done as quickly with new installations, but it just doesn't apply for actual LRT. To do the work that fast, the two basic requirements seem to be that the road itself is not being reconfigured and you are only talking about a reconstruction of the two lanes involved, and that only the track depth itself needs digging. No utility relocation, no trackbed work (in Toronto it already exists where needed, and for the most part streetcars don't need much, while light rail TRAINS do).
     
     
  #3210  
Old Posted Apr 24, 2010, 5:54 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,047
Quote:
Originally Posted by Smooth View Post
^ I think we only need to look at the Granville Street rehabilitation to see how long street car installation might take.
Quote:
Originally Posted by Bureaucromancer View Post
I HAVE seen streetcar work done that fast in Toronto, and in the US it has apparently been done as quickly with new installations, but it just doesn't apply for actual LRT. To do the work that fast, the two basic requirements seem to be that the road itself is not being reconfigured and you are only talking about a reconstruction of the two lanes involved, and that only the track depth itself needs digging. No utility relocation, no trackbed work (in Toronto it already exists where needed, and for the most part streetcars don't need much, while light rail TRAINS do).
All of this points up to why the best option, not only for the present, but for the long term is, Skytrain underground (RRT) !
     
     
  #3211  
Old Posted Apr 24, 2010, 6:17 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
One thing I don't understand is how there's an alternate RRT option that starts at Commercial and Broadway...that makes zero sense.
     
     
  #3212  
Old Posted Apr 24, 2010, 7:34 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,624
Quote:
Originally Posted by mr.x View Post
One thing I don't understand is how there's an alternate RRT option that starts at Commercial and Broadway...that makes zero sense.
I think that's an attempt to fork the M-Line at that point and turn the VCC area into a wasteland. Not sure why though..

Zwei is losing his mind on his blog, more than usual. Fun to see.

Regarding your earlier comment quote, B-Line not being utilized.. CLASSIC.
     
     
  #3213  
Old Posted Apr 24, 2010, 8:37 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by trofirhen View Post
She said it would take about three weeks to build a tram line !! ?? !! ??
What has she been smoking, anyway?
Where can I get some??
You missed the 420 party this year?

http://www.vancouversun.com/news/Thousan...te+Vancouver/2930770/story.html?tab=PHOT
     
     
  #3214  
Old Posted Apr 24, 2010, 8:40 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by mr.x View Post
One thing I don't understand is how there's an alternate RRT option that starts at Commercial and Broadway...that makes zero sense.
From what I know, they are considering a separate technology, but that really defeats one of the advantages of RRT in the first place, which was to eliminate the transfer. Remember though, these are just random ideas on the table.
     
     
  #3215  
Old Posted Apr 24, 2010, 9:19 PM
Bureaucromancer Bureaucromancer is offline
Registered User
 
Join Date: Mar 2008
Posts: 106
Quote:
Originally Posted by deasine View Post
From what I know, they are considering a separate technology, but that really defeats one of the advantages of RRT in the first place, which was to eliminate the transfer. Remember though, these are just random ideas on the table.
To the point that I would probably support the combo plan with M-Line extension over a grade separated but isolated line on Broadway.
     
     
  #3216  
Old Posted Apr 24, 2010, 10:04 PM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Seattle Komo news: Girl using cell phone hit by Link train at Othello station

http://rainiervalley.komonews.com/content/girl-using-cell-phone-hit-link-train-othello-station

I thought Zwei has said people will get out of the way with a 'ding-ding' of tram bell?
     
     
  #3217  
Old Posted Apr 24, 2010, 10:25 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Interesting to note that this was located at the station platform and not the street. Really makes me wonder why was she on the tracks anyway. One thing's for sure, no one's going to be an idiot and not pay attention and walk into the SkyTrain guideway tracks =P
     
     
  #3218  
Old Posted Apr 24, 2010, 10:39 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by deasine View Post
From what I know, they are considering a separate technology, but that really defeats one of the advantages of RRT in the first place, which was to eliminate the transfer. Remember though, these are just random ideas on the table.
haha, a bit too random.
     
     
  #3219  
Old Posted Apr 24, 2010, 11:12 PM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by deasine View Post
Interesting to note that this was located at the station platform and not the street. Really makes me wonder why was she on the tracks anyway. One thing's for sure, no one's going to be an idiot and not pay attention and walk into the SkyTrain guideway tracks =P
Well at least not unless they want to get hit
     
     
  #3220  
Old Posted Apr 24, 2010, 11:15 PM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by mr.x View Post
One thing I don't understand is how there's an alternate RRT option that starts at Commercial and Broadway...that makes zero sense.
It doesn't make sense now because VCC-Clark is already built.

They might be thinking of having a Branch just after Commercial. One line goes right under Broadway to go to UBC. The other would go to VCC-Clark and then possibly to Finning and just end there. Not that I support this
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:40 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.