Quote:
Originally Posted by mattropolis
I like the combination option. It will be cheaper in the short term and in the long term the SkyTrain can be extended to UBC. The idea of the streetcar/tram going along the false creek line will be a bonus, if it is done right. perhaps a tunnel from the granville island station to avoid 4th ave and burrard. The transfer station at Arbutus/Broadway would have to be well designed to allow easy cross-platform transfers with no stairs but not preclude eventual extension of SkyTrain westward.
I wonder if the the same people that voted for option 4 also will be signing the anti-HST petition?? The province is broke and doesn't have 3 billion for an all-tunnel SkyTrain to UBC. I doubt we'll even see any of the 6 options built in the next 15 years.
|
Once the track is laid west of Arbutus, there is probably no chance of seeing any skytrain extension. For staged approach, I think they'll have to keep the B-Line instead of any type of rail solution.
And I doubt the combination option is much cheaper especially if its tunneled at Granville Island (which is probably the only logical choice). Comparision to RRT all the way to UBC:
- 4.5km less tunnel (assume RRT UBC station is underground)
- 9.2km more at-grade (assume RRT Univ Blvd is at-grade)
- 3 less underground stations
- approx. 12 more at-grade stations
- approx. 50% more rolling stock
- 1 extra OMC
So even if there are saving, it would probably be less than 400 millions.. but add in the extra operating cost, we're actually paying more after about 30 years...