Quote:
Originally Posted by tybuilding
Some parts the rail line is hardly used like the interurban line that BC Hydro still has passenger service rights to the line that runs from 232 st and HWY 1 to Abbotsford. Trains come on this stretch only 2x per day. Other stretches are busy as it joins up on the busier frieght routes such as through Langley.
I still can't see service to Chilliwack being fairly fast as it is a fairly windy route.
Personally I would rather see a rapid bus service East from King George Skytrain out to Langley, Aldergrove, Abbotsford, Chilliwack. Seems like it would be faster and hit up major population centres more like Aldergrove following Fraser Highway. The existing train route goes through more farm land and stays on the outside of areas. But I digress, better off in another discussion. http://i200.photobucket.com/albums/aa199/pgieselman/ReallyBigMap.jpg
|
The primary problem are any of the river crossings. When is the last time CP or CN invested in constructing a new bridge? Honestly.
For us to ever have reliable commuter rail south of the Fraser we need to construct some new heavy rail bridges.
Also, for the record, I would rather see WCE or JR style heavy rail commuter lines accessing the Valley than LRT. Of course I would like these heavy rail lines have all day 2 way train schedules. At least once every hour each direction would be nice. And 1 late night train would also be nice.
Also for the record, much of the money spent on highways over the last 10 years also helps transit greatly as well, for many bus routes are using the upgrades.
For example, I see there are now buses using the Coast Meridian Overpass, now avoiding congestion.
The 701 and other bus routes that use the new Pitt River Bridge are no longer jammed up for 20+ minutes at a time as in the old counter flow. These buses are now much more reliable on their schedules.
Surrey, Langley, Maple Ridge and Pitt meadows are now connected by bus via the new Golden Ears Bridge.
Also, it will be nice when the #1 upgrades are finished when bus service will resume over the Port Mann and the bus only exits / on ramps are a nice touch as well.
So there is a silver lining in every cloud, unfortunately it is the nature of the beast, since transit projects only directly service commuters while road projects directly service transit commuters (buses), vehicle commuters, commercial vehicles, shipping, etc...
Of course the same could be said for building some new heavy rail bridges, but in all honesty, I really want any new heavy commuter trains to be built with their own lines, no more sharing with freight.
I live in Maple Ridge, and would love the WCE to run all day and to have its own dedicated rails, but I am also realistic and understand the nature of Greater Vancouver, and the fact is skytrain to the Tri-Cities and to UBC is currently our most important transit projects.
In fact the North Shore, with its close proximity to downtown, lower population / growth potential, harsh NIMBYism and access to Sea Bus, is one of the last areas I believe deserves a rail mega project.