River Intake and Pump Station
Frequently Asked Questions
1. Why is the City of Saskatoon constructing a new river intake and pump station?
The City is constructing a new intake and pump station to provide a long-term, secure river water supply for both the current Water Treatment Plant on Avenue H, and a future Water Treatment Plant.
The City's existing intake and pump station operation, currently leased from Sask Power, is approaching its maximum capacity, and a new facility is required to meet the Saskatoon's growing water demands.
2. Where will the new river intake and pump station be located?
The new intake and pump station will be located upstream of the Water Treatment Plant on the South Saskatchewan River just south of city limits. The structure will be built at the tip of an existing structure on the east side of the river directly across from the Queen Elizabeth (Q.E.) Power Station.

Map is not part of the source info just my addition.

Photo by
Ruckus (with a little color correction by me) is not part of the source info.
3. What is a river intake and how does it work?
In this case, a concrete wedge shaped structure with protruding in-river fish screens will be set in the South Saskatchewan River, which will allow river water to flow into it. A pump station then propels the water from the intake site through a series of underground pipes to the Water Treatment Plant on Avenue H. This water is carefully treated and eventually becomes drinking water.
4. Why was this site chosen?
Several sites for the new intake and pump station were considered. The location across from the Q.E. Power Station was chosen as it offers good mid river flow conditions for an intake.
5. Will the new river intake affect my drinking water quality?
No. The proposed location is upstream of all City storm water outfalls to maximize safety.
6. What environmental approvals have been required with respect to the project?
Due to the sensitivity of the intake’s "in-river" location, the project has undergone detailed review by Department of Fisheries and Oceans Canada, Environment Canada, Transport Canada (Navigable Waters Protection Branch), Saskatchewan Environment, Saskatchewan Watershed Authority, Meewasin Valley Authority, R.M. of Corman Park, Sask. Agriculture and Food, Heritage Resources Branch of the Department of Culture, Youth and Recreation, and Sask Power.
Formal applications have been made to the above agencies through a Project Proposal describing the project construction, potential impacts and mitigation measures in detail.
Construction will only proceed upon receiving all formal approvals from the above agencies.
7. How will the proposed intake affect fish and fish habitat?
The proposed intake will include in-river screens are designed to prevent fish from entering the intake, and will meet the current requirements set forth by Department of Fisheries and Oceans Canada (D.F.O.).
While the project was designed to minimize the alteration or loss of existing fish habitat, some loss and alteration of fish habitat is expected. To meet D.F.O.'s "No Net Loss" principle, compensation measures are proposed by the City to restrore an area within the river where residual waste from the Water Treatment Plant has accumulated. The removal of waste materials and stabilization of the adjacent river bank will result in improved fish habitat in this area, thus meeting D.F.O. requirements.
8. How much water will the intake withdraw from the South Saskatchewan River?
Under existing water demand conditions, it is estimated that on average the new intake will withdraw less than 1% of the river flow. Most of this water will be returned to the river after it is used by residents and then treated at the Wastewater Treatment Plant located downstream at the north edge of the city.
Water Rights within the province are regulated by Saskatchewan Watershed Authority, and the City currently holds a Water Rights License for withdrawal.
9. Will it be safe to boat or canoe around the intake?
No. Due to the unpredictable nature of the river flow patterns, and its shifting river bottom, signage will be posted to discourage people from getting too close to the facility.
A floating boom will also be installed to deter boats and canoes from floating between the structural columns and front face of the intake. The in-river screens at the intake’s entrance will also prevent accidental access.
10. Will the site be accessible to the public?
The site access road will be gated to prevent public access. Secured access to the intake site will come from the intersection of Cartwright Street and Strathcona Avenue in the R.M. of Corman Park. Closed circuit security cameras will be used to monitor the area near the facility against vandalism.
11. What is the construction schedule for the project?
The construction schedule currently projected is September 2008 – September 2010. This schedule is subject to change based on approvals timing, and tender results.
For more information:
Web Site: Visit the City of Saskatoon web site at
www.saskatoon.ca
(search under “w” for Water Treatment)
To submit questions or comments regarding this project:
Email:
[email protected]
Source