  #2601  
Old Posted Mar 10, 2010, 9:00 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Quote:
Originally Posted by Rusty Gull View Post
Sounds cool, but I don't think we'll see a link between the North Shore and Fraser Valley/Tri-Cities in our lifetimes. The Lonsdale Citizens Coalition, the Deep Cove Citizens Group, the Edgemont Good Neighbours Club, and the Mount Seymour Neighbourhood Activist Society will join forces to blockade everything from a bridge from Anmore to a three-storey high building.
All those bitchy old geezers will be dead by then
     
     
  #2602  
Old Posted Mar 10, 2010, 9:28 AM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by deasine View Post
No new rolling stock?! No way. New trains must be purchased to maintain a high frequency, unless they do choose to run the shuttle service between Lougheed and Columbia which I vehemently oppose.

I'm interested to see how the P3 is integrated for the Evergreen Line and which project partners will be involved. I'm hoping to see this P3 project include potential developers for the station lands, such as the one for Coquitlam Central.
I thought I read somewhere. That when the Evergreen line is completed. The expo line will get all of the MKII trains and the Mil-Ever-Line will get the MKI trains.

I think they want to wait and see what the ridership is like on the Mil line once the Evergreen line is running.

Of course when the UBC extension is done they they will need to order more trains.
     
     
  #2603  
Old Posted Mar 10, 2010, 9:37 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by nname View Post
No, I think they're still looking for putting a yard somewhere on Barnet between Ioco and Johnson? At least that was the original LRT plan.

They're currently running 56 trains right now, and the current Break at CO plan requires 71 trains. So they'll have to buy new train - probably around 60-68 cars.
It was probably part of the LRT plan because of using LRT equipment that wouldn't be compatible with Bombardier M-Line/E-Line cars, so the LRT trains would need their own OMC somewhere on the line.

Once the decision was made to use Bombardier ALRT on Evergreen, that equipment can be fed from Edmonds. At 4 am, how many people care that a train has to make a few out-of-service moves from Edmonds to Lougheed to Douglas College before service starts?

They may also pre-position some previously cleaned trains overnight at Douglas College and Lougheed (on the 3rd track) just like they do on the tail tracks at Waterfront, VCC and King George so they can be quickly added as needed rather than having to run an out-of-service from Edmonds to a terminal before putting it in service.

That doesn't prevent the planners from using the area they were planning for the LRT OMC site as just a storage yard for Bombardier trains. The land can be built on now or it can be held for future yard construction.

If/when the Surrey Skytrain extensions happen, a storage yard may be built out there too.
     
     
  #2604  
Old Posted Mar 10, 2010, 9:54 AM
huenthar huenthar is offline
Registered User
 
Join Date: Jan 2010
Posts: 294
Anyone know if Translink has any serious thoughts about getting the cars from the Scarborough RT and refurbishing them to save a bit of money?
     
     
  #2605  
Old Posted Mar 10, 2010, 3:44 PM
Bureaucromancer Bureaucromancer is offline
Registered User
 
Join Date: Mar 2008
Posts: 106
Quote:
Originally Posted by huenthar View Post
Anyone know if Translink has any serious thoughts about getting the cars from the Scarborough RT and refurbishing them to save a bit of money?
Not a good idea; I haven't seen the condition of the trains in Vancouver for a few years, but ours are well and truly on their last legs. It would probably be just enough trains to get Evergreen up without any fleet crunch (we've got 28 cars total, and I think they are all operational for now), but I doubt it would save any significant money in the long run once the shorter life and refurb costs are considered.

It seems to me that by the time an order for Evergreen would need to be in place you should have a realistic timeline for Surrey and/or Broadway which could all then be integrated into a single order with appropriate delivery timings.
     
     
  #2606  
Old Posted Mar 10, 2010, 4:35 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,116
Quote:
Originally Posted by red-paladin View Post
All those bitchy old geezers will be dead by then
And replaced by twice as many new ones, no doubt.


As for Scarborough's trains, it would depend on how much refurbishing is needed. Remember, too, that these trains are configured to use a driver.
     
     
  #2607  
Old Posted Mar 10, 2010, 4:43 PM
Canadian Mind's Avatar
Canadian Mind Canadian Mind is offline
Registered User
 
Join Date: Aug 2006
Posts: 3,907
Quote:
Originally Posted by deasine View Post
No new rolling stock?! No way. New trains must be purchased to maintain a high frequency, unless they do choose to run the shuttle service between Lougheed and Columbia which I vehemently oppose.
Why do you oppose such an idea?
__________________
"you're eating chicken periods" - Vid
"I love eggs, especially the ones with runny yolks" - Me
"EWWWWWWWWWWWWWWWWWWWWWW, you're disgusting!" - Vid
     
     
  #2608  
Old Posted Mar 10, 2010, 4:50 PM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
It'd take away capacity from elsewhere, which would cause overcrowding and slow things down.
     
     
  #2609  
Old Posted Mar 10, 2010, 5:02 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
I agree. New additional cars need to be purchased for Evergreen. The recent new 48 car additions are quite needed to serve the ridership demand on the Expo Line.
     
     
  #2610  
Old Posted Mar 10, 2010, 5:09 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by cabotp View Post
I thought I read somewhere. That when the Evergreen line is completed. The expo line will get all of the MKII trains and the Mil-Ever-Line will get the MKI trains.

I think they want to wait and see what the ridership is like on the Mil line once the Evergreen line is running.

Of course when the UBC extension is done they they will need to order more trains.
No that's right, but you still need to purchase new trains so that the Expo Line can move all its MK Is onto the Evergreen Line.

Quote:
Originally Posted by Canadian Mind View Post
Why do you oppose such an idea?
Stations there were originally transferless are now having to have to transfer at either Lougheed or Columbia. At Lougheed it's fine, but Colubmia isn't or was not designed to be a transfer station.

It does save on a lot more trains and makes timing much easier, but I at least want to see the Evergreen and Millennium Lines or Expo and Millennium Lines run interlined with each other.
     
     
  #2611  
Old Posted Mar 10, 2010, 5:53 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,679
Quote:
Originally Posted by allan_kuan View Post
Not to play the devil's advocate but inflation will probably increase that cost to what it is now.
According to the Bank of Canada, $700m in 2002 is only $825m in 2010.

http://www.bankofcanada.ca/en/rates/inflation_calc.html

Now, if that was a real number, or an "NDP Budget" number is the question. I have no doubt the Evergreen line, if built with the Millennium Line, would still be over $1B.
     
     
  #2612  
Old Posted Mar 10, 2010, 6:00 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,679
Quote:
Originally Posted by allan_kuan View Post
It'd take away capacity from elsewhere, which would cause overcrowding and slow things down.
Quote:
I agree. New additional cars need to be purchased for Evergreen. The recent new 48 car additions are quite needed to serve the ridership demand on the Expo Line.
Guys, you can't say the system is at capacity based on the events of the Olympics. Given a limitless pot of money, I'd love to have everything, but with the strain that Translink is under, lets assume that they could reduce their funding commitment to $200m for this line if they eliminate the new cars and required OMC. Take it. You can always build an OMC later.
     
     
  #2613  
Old Posted Mar 10, 2010, 6:03 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
It is much cheaper to not interline. This is established by Translink's studies, and I don't think we're in the right financial situation to be extravagant with rolling stock. One of the two lines can service Columbia-to-Lougheed as a spur. You'll never have to transfer more than one time, but the most direct route might require 2 transfers.

It makes sense to put all of the MKII trains on Expo (capacity almost 600 per train), and put all of the MKI trains on Mill/Evergreen (capacity almost 500 per train). I bet Mill/Evergreen will only need 4-car MKI's for most of the day.

As far as the capacity of Expo Line's busiest segment (Comm-Broadway to Waterfront), I bet they could reduce the load on that segment by 30% just by extending Millennium up to Canada Line. It would probably be cheaper than lengthening every Expo station.
     
     
  #2614  
Old Posted Mar 10, 2010, 6:10 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Quote:
Originally Posted by WarrenC12 View Post
According to the Bank of Canada, $700m in 2002 is only $825m in 2010.
Millennium Line budget came from 1999, so inflation brings us to $880m. Also, labour/material costs went up during the last building boom, and today's building code is more expensive, both of which drove Canada Line from $1.4B to $2.1B.
     
     
  #2615  
Old Posted Mar 10, 2010, 6:10 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,116
Excellent posts by everyone.

If I may add... back of napkin calculations here:

Evergreen Line has 4 stations.
That's 25% of the Canada Line amount.
Canada Line uses 16 trains.
Approximately the same service on EG would be 4 trains.

I'm sure that if all the MKIs came to M-Line they could make another 4 trains by just taking apart the 6-car trains and running them all as 4s. That was we have the capacity and I doubt frequency would be affected much at all.

I'll let someone else do the real calculations.
     
     
  #2616  
Old Posted Mar 10, 2010, 6:21 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
They could start out with 4-car trains every 10.8 minutes, and decrease Columbia-Lougheed frequency to 10.8 minutes = 12 cars required in total = $36 million.

To further save money, with these frequencies we really don't need to build out the third platform at Lougheed yet, although build the flyover to that track and commission to provide storage space.

Ultimately we'll see M-Line and Evergreen Line interlined, with combined 2.7 minute frequency and a built out 3rd platform. Evergreen Line will see 4-car trains every 5.4 minutes. It's taken 6+ years to see M-Line reach capacity (2-car trains @ 5.4 minutes) so 2-car trains @ 5.4 minutes for Evergreen Line until 2020 will be just fine.
     
     
  #2617  
Old Posted Mar 10, 2010, 6:31 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Bridgeport Station works without a third platform with only a little confusion (which could be solved by better signage). I don't really see the need for expensive flyovers or third platforms at Lougheed.

Assuming the end of interlining, I don't expect Lougheed will ever see greater train frequency than Bridgeport, given that Lougheed will be blessed with longer trains.
     
     
  #2618  
Old Posted Mar 10, 2010, 6:45 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,679
Quote:
Originally Posted by DKaz View Post
Ultimately we'll see M-Line and Evergreen Line interlined, with combined 2.7 minute frequency and a built out 3rd platform. Evergreen Line will see 4-car trains every 5.4 minutes. It's taken 6+ years to see M-Line reach capacity (2-car trains @ 5.4 minutes) so 2-car trains @ 5.4 minutes for Evergreen Line until 2020 will be just fine.
Yes... just run the lines with a few major 80m stations. More trains, and even more stations can be bought/built later if necessary.

How much would it cost to build a line from VCC to UBC, with only 2 stations? 1 at UBC and 1 at Cambie? Leave a bunch of giant holes or whatever for future stations. No rolling stock, no OMC, etc. It may sound crazy, but if you can have that line 10 years earlier, I think it's worth considering.
     
     
  #2619  
Old Posted Mar 10, 2010, 6:48 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,743
Comments:

I have read that additional trainsets will be required to operate the Evergreen Line. HOWEVER, they were included in the general fleet expansion purchases of SkyTrain cars. If I recall correctly, the next few options to purchase cars have been delayed (or cancelled) due to the budget crunch. A train storage yard will be required to accommodate additional trainsets since Edmonds is at capacity (unless they go to extraordinary measures like storing trains on the guideway).

Why aren't vehicles part of the Evergreen Line project?

My guess would be that the P3 entity will NOT operate the line. BC Rapid Transit Co. (TransLink subsidiary) will operate the line as part of the overall SkyTrain network. The P3 entity will likely design, build, finance and maintain the Evergreen Line - but not operate it. Therefore, the trainsets would not fall within the scope of the contract with P3 entity.

As I had previously mentioned before - my guess is that the P3 structure will be similar to those seen for the Docklands Light Railway in London, UK - the P3 entity will receive payments based on track availability (building and maintaining the track and providing BCRTC with access to it for operation of the SkyTrain on it).
     
     
  #2620  
Old Posted Mar 10, 2010, 8:34 PM
tybuilding tybuilding is offline
Registered User
 
Join Date: Sep 2009
Posts: 898
Quote:
Originally Posted by Zassk View Post
Millennium Line budget came from 1999, so inflation brings us to $880m. Also, labour/material costs went up during the last building boom, and today's building code is more expensive, both of which drove Canada Line from $1.4B to $2.1B.
There is the Non Residential Construction Index which we use at my work and would be used in this case.

The index for 2009 = 154, 1999 = 90.1

Budget in 1999 of 700 million x 154/90.1 = 1.2 billion in 2009 $.

But it is better to do a bottoms-up estimate (if you have the information) and re-estimate the project instead of using the cost index. A parametric estimate using the Canada line cost and the Millennium line can also be done if new information is lacking. There would be now new information as some more engineering has been done and the building codes have changed.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:54 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.