Quote:
Originally Posted by lezard
The logical location for any transit investment should be where it is needed, where there is sufficient demand to justify the cost, not where it fits.
Someone here once suggested streetcar should run along the seawall rather than on Broadway because there it would fit and not interfere with left turns and what not.
How about somewhere between Saskatoon and Edmonton or Inuvik. Lots of room there. It boggles the mind.
The only reason grade separated LRT makes any sense on Broadway is because there is assuredly enough demand there.
|
No, that is not the only reason, but one among other...
Since you mention Switzerland, let's talk about time.
You will have noticed that the Geneva's streetcars don't go farther than 5km out of the downtown center...
a ride to the end of the line at 20km/h will take 15mn, but most will ride it barely more than 2/3 of it, so average trip length on the Geneva streetcar is 10mn...
if it was a subway at 40km/h, trip length on the subway could be 5mn, but we will agree that trip could be longer due longer access time to the station...so time saving could be relatively marginal.
On Broadway, it is another story, B line is 14km length.
average trip is 7km, so half of the length.
so time difference between 2 transportation become pretty significant, 10 mn instead of 20mn...
and yes time matter, even in Geneva, and that is the reason why geneva streetcar lines are short, because if people want to travel further than 5km, they don't use a streetcar anymore, they use the Geneva's RER (train network)!
Geneva like any other good European city use streetcar for what they are designed for: local service. for regional service they tend to favor faster transportation mode.