Quote:
Originally Posted by officedweller
It's not just a political decision (i.e. to score voters) - it's a planning decision at the regional level to encourage and shape growth. It only became a political issue because of years and years of delay and failure to build out the LRSP network. Arguably, the UBC Line could be a move to score beleagured transit riders who complain of overcrowding.
The Evergreen Line is intended to be the counterpoint to the Expo Line
so that population growth develops evenly on both the north and the south sides of the Fraser River.
If you look at the LRSP map you'll see the "T-Line" which allows commuting from Coquitlam to Surrey (it looks like a sideways "T") - that is intended to shape growth by providing suburb to suburb rapid transit access to the Surrey core (Central City) and reducing commuting distances. As built, that route would be Evergreen Line -> M-Line -> Expo Line to Surrey.
Originally, there was to be fewer transfers with a through routing from Coquitlam to Columbia, but the M-Line as-built re-oriented the Lougheed station to an east-west station rather than a north-south station.
|
I totally understand what you are saying. It is important to shape growth by using transit.
The problem is doing it only at one end doesn't help. If you want to build transit at one end to encourage people to take it, it
needs to go somewhere.
It's like saying we want to encourage growth in Penticton and Vernon so we will build some rail transit between the two cities... on the West side of the lake.
Would anyone ride the WCE if the terminus was in Northern Burnaby or Hastings Park or even Main&Powell? Would Skytrain have influenced the growth and density in New Westminster and Surrey if the terminus was Stadium and didn't go through to the business district?
Central Broadway, South Granville, Kits, and UBC are huge destinations. 49% of commuters drive into downtown, 49% take transit. Central Broadway is at over 70% drivers, and the B-Line is full. We can build all the transit we want in the burbs, more people aren't going to ride it because there isn't room on the B-line for them.
The best way to increase ridership on Skytrain in places where Evergreen will go and on the Millennium line would be to offer more places they want to go.
I could understand leaving Broadway the way it is if it was all people coming from CoV into downtown, but Broadway itself is a major destination, second largest in the region, and it's on the same corridor as the number 3 destination at UBC. It's where people in the burbs, who want LRT or Skytrain in their neck of the woods, want to go once they get on the trains.
They won't ride it at their end if it doesn't go to the established areas they want to go to.
UBC might not be in the LRSP, but Central Broadway is. It's a major destination for regional travelers, and having it on the network will encourage growth and density in other areas along existing and planned Skytrain.
If you work on Broadway or go to/work at UBC, it doesn't mater where in the boonies they build Skytrain, it still doesn't go where you want it to go, so it won't influence your move (in fact you will live as far away from it as possible because it drives up home prices, why pay for it if you don't need it).
But you are right that at the end of the day, Evergreen line is already well ahead of Broadway. Even if Broadway were fast tracked to the extreme, by the time shovels hit the ground, Evergreen would be almost complete if it goes ahead as planned. And it's not like we are going to put this money set aside for Evergreen (except the $200 million we are short) into a savings account, it's mostly there and needs to be spent on something ready to build, like Evergreen Line. And even though a lot of it will be borrowed, it's cheaper to borrow it now than in the future.