View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #2081  
Old Posted Jan 11, 2010, 12:18 AM
vansky vansky is offline
Registered User
 
Join Date: Feb 2008
Posts: 928
just a side comment, i hope they build an elevated track instead of an underground, since it looks much more interesting above ground...
     
     
  #2082  
Old Posted Jan 11, 2010, 12:32 AM
NetMapel's Avatar
NetMapel NetMapel is offline
Hello World
 
Join Date: Jul 2008
Posts: 1,580
It should be underground until the end of West Broadway, at around Point Grey. After that point, I don't really care if it's underground or elevated... maybe elevated for a nice view.
     
     
  #2083  
Old Posted Jan 11, 2010, 2:29 AM
The_Henry_Man The_Henry_Man is offline
HA
 
Join Date: Mar 2006
Location: St. Cloud, MN/Richmond, BC
Posts: 873
I took the 99 from Broadway-City Hall Station to visit a few old profs at UBC last week, packed literally like sardines (stood right beside the driver at the very front of bus, in front of the yellow line ALL THE WAY TO UBC) at 1030h, not even during rush hour, and this ride took 35 minutes, whereas only 17-18min on the Skytrain from Richmond Centre. It used to be 40-45min from UBC all the way to Commercial-Broadway. Now the 99 trip is longer thanks to the addition of stops at Arbutus and Fraser (not necessarily a bad thing) and that the driver drove like a grandma. The choice of extending Millenium Line Skytrain right to UBC is SO obvious here. There's ABSOLUTELY no need for a public discussion. There really should be over 90% support for this project. It's one of those times that a public discussion will do much worse to the region than not having one.

I tested whether the new C-Line Skytrain/99B routing will be faster than taking the 480 from Richmond Centre, and taking the former is still 5 min slower than the 480. If the M-Line Skytrain is extended to UBC, it would've only taken approximately 35min (assuming the Skytrain ride from Broadway-Ctiy Hall to UBC is halved compared to today's 99) to go to UBC all the way from Richmond Centre, almost the same time it takes to drive to UBC from the same starting point, at 30min, assuming ZERO traffic congestion!!! In comparison, it takes around 45-50min to go to UBC from Richmond Centre via the 480.

These anti-Skytrain folks and guys like Zweisystem are truly smoking crack!!

Last edited by The_Henry_Man; Jan 11, 2010 at 2:40 AM.
     
     
  #2084  
Old Posted Jan 11, 2010, 2:42 AM
The_Henry_Man The_Henry_Man is offline
HA
 
Join Date: Mar 2006
Location: St. Cloud, MN/Richmond, BC
Posts: 873
Quote:
Originally Posted by satishreddy View Post
I am in favour of "skytrain" to UBC.

Regarding surface LRT to UBC along Broadway, some questions and comments:

-My guess is that the LRT option has a capital cost of $500million to $1 billion, when one includes rails, trains, maintenance centre

- By the way, where will the LRT maintenance centre be located?

- One lane each way will be dedicated to rails. Will cars be allowed on that lane? If not, then one has reduced capacity on Broadway.

- How long will the trip take between Commercial/Broadway station and UBC? If the time is the same as the bus, then what is the point of spending a whole lot of money, without any real benefit to the rider.

- What is the operating cost of LRT compared to the current bus compared to Skytrain?

- One distinct disadvantage of LRT that mixes with regular traffic is the risk of accidents, which will shut the system down.

- What is the logic of putting of using Skytrain on the Evergreen line and LRT on Broadway? UBC and Central Broadway are the 2nd and 3rd most popular transit destinations in the region. The Evergreen line goes through a region of low density.

I have seen estimates that the Evergreen line (11 km) will have 25,000 boardings when it opens and perhaps 50,000 in 20 years. If it Skytrain in a tunnel, then the UBC line will cost about twice as much as the Evergreen line. My prediction is that it will have at least 2.5 to 3.5 times as many boarding on opening day. It will also cut travel time compared to the existing bus significantly.

Estimated station boardings (UBC skytrain - along Broadway and 10th) - based on my observations of transit connections, businesses, density of housing in the area:

UBC - 12000-15000 per day
Sasamat - 4000-6000 per day
Alma - 4000-6000 per day
MacDonald - 4000-6000 per day
Granville - 6000-8000 per day
Oak - 6000-8000 per day
Cambie 12000-15000 per day
Main 8000-10000 per day
There may be one more station between Main and Commercial/Broadway.
Broadway/Commercial 6000-8000 boarding to go west (not including people already on the train)
Don't forget the potential Finning Station and then VCC-Clark.
     
     
  #2085  
Old Posted Jan 11, 2010, 2:44 AM
racc racc is offline
BANNED
 
Join Date: Oct 2008
Posts: 1,241
A meeting people might want to sign up for.

TransLink UBC Line Rapid Transit Study Stakeholder Workshop
6:30 pm--9:30 pm Monday 18 January 2010:
Ballroom of the Plaza 500 Hotel, 500 W. 12th.
Registration begins 6pm.
Register to attend [email protected].

http://www.translink.ca/en/Get-Involved/Public-Consultations/UBC-Rapid-Transit.aspx
     
     
  #2086  
Old Posted Jan 11, 2010, 2:50 AM
NetMapel's Avatar
NetMapel NetMapel is offline
Hello World
 
Join Date: Jul 2008
Posts: 1,580
Quote:
Originally Posted by racc View Post
A meeting people might want to sign up for.

TransLink UBC Line Rapid Transit Study Stakeholder Workshop
6:30 pm--9:30 pm Monday 18 January 2010:
Ballroom of the Plaza 500 Hotel, 500 W. 12th.
Registration begins 6pm.
Register to attend [email protected].

http://www.translink.ca/en/Get-Involved/Public-Consultations/UBC-Rapid-Transit.aspx
I think those NIMBYs and anti-skytrain people are kind of like those crazy anti-healthcare people in the US. They get so passionate and go to all those meetings making their points. Problem is that their points aren't exactly logical and so they shout louder to dictate the discussion.
     
     
  #2087  
Old Posted Jan 11, 2010, 2:56 AM
Prometheus's Avatar
Prometheus Prometheus is offline
Reason and Freedom
 
Join Date: Jul 2009
Location: Vancouver/Toronto
Posts: 4,016
Quote:
Originally Posted by satishreddy View Post

Estimated station boardings (UBC skytrain - along Broadway and 10th) - based on my observations of transit connections, businesses, density of housing in the area:

UBC - 12000-15000 per day
Sasamat - 4000-6000 per day
Alma - 4000-6000 per day
MacDonald - 4000-6000 per day
Granville - 6000-8000 per day
Oak - 6000-8000 per day
Cambie 12000-15000 per day
Main 8000-10000 per day
There may be one more station between Main and Commercial/Broadway.
Broadway/Commercial 6000-8000 boarding to go west (not including people already on the train)
You missed two other obvious places for stations:

1) Halfway between Alma and McDonald (e.g. Trutch). This is a vibrant commercial corridor with great potential.

2) Arbutus.

Last edited by Prometheus; Jan 11, 2010 at 3:13 AM.
     
     
  #2088  
Old Posted Jan 11, 2010, 3:09 AM
Prometheus's Avatar
Prometheus Prometheus is offline
Reason and Freedom
 
Join Date: Jul 2009
Location: Vancouver/Toronto
Posts: 4,016
Quote:
Originally Posted by NetMapel View Post
It should be underground until the end of West Broadway, at around Point Grey. After that point, I don't really care if it's underground or elevated... maybe elevated for a nice view.
The affluent and well-connected residents of that part of town will care.

Moreover, your indefference makes no sense from an engineering perspective. A very steep, upward hill begins at that point. The geography virtually necessitates a subterranean route to the next station.
     
     
  #2089  
Old Posted Jan 11, 2010, 3:14 AM
NetMapel's Avatar
NetMapel NetMapel is offline
Hello World
 
Join Date: Jul 2008
Posts: 1,580
Quote:
Originally Posted by Prometheus View Post
The affluent and well-connected residents of that part of town will care.

Moreover, your indefference makes no sense from an engineering perspective. A very steep, upward hill begins at that point. The geography virtually necessitates a subterranean route to the next station.
I am not an engineer so I will trust the engineers' decision as to whether the line should be underground or elevated when they build the line. That is what I meant by "I don't care."
     
     
  #2090  
Old Posted Jan 11, 2010, 3:24 AM
Prometheus's Avatar
Prometheus Prometheus is offline
Reason and Freedom
 
Join Date: Jul 2009
Location: Vancouver/Toronto
Posts: 4,016
Quote:
Originally Posted by NetMapel View Post
I think those NIMBYs and anti-skytrain people are kind of like those crazy anti-healthcare people in the US. They get so passionate and go to all those meetings making their points. Problem is that their points aren't exactly logical and so they shout louder to dictate the discussion.
On the contrary. Those who oppose state-run healthcare as a violation of individual freedom have a monopoly on logic (and morality) on this issue.
     
     
  #2091  
Old Posted Jan 11, 2010, 3:30 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
It's clear that LRT would take the same time to get to UBC as a B-Line.

I'm really sure that if LRT wasn't fast enough or high enough capacity for the Evergreen line, it won't be for this one either. I don't think Campbell would let an LRT get built through that when Canada Line was chosen to go underground so that it wouldn't be visible. I'm sure that they would want it to be invisible through the Broadway corridor as well.
     
     
  #2092  
Old Posted Jan 11, 2010, 3:34 AM
usog usog is online now
Registered User
 
Join Date: Dec 2008
Posts: 580
Honestly I doubt Translink will ever put in LRT on Broadway anyways. It's always been their intention to keep with Skytrain. I assume they'll just humor the LRT group for a while and then announce their predetermined choice. Of course, they'll need to have the balls to force it through but judging by past history it'll go through. The only question is how far they will water down the design ala-Canada Line.
     
     
  #2093  
Old Posted Jan 11, 2010, 4:20 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by red-paladin View Post
It's clear that LRT would take the same time to get to UBC as a B-Line.
That is not true, unless there is some accident that is blocking the tracks. That being said, LRT wouldn't be substantially faster than the current B-Line and would never match the speed of the SkyTrain unless it was built fully segregated from traffic.
     
     
  #2094  
Old Posted Jan 11, 2010, 4:44 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,052
Quote:
Originally Posted by The_Henry_Man View Post
I took the 99 from Broadway-City Hall Station to visit a few old profs at UBC last week, packed literally like sardines (stood right beside the driver at the very front of bus, in front of the yellow line ALL THE WAY TO UBC) at 1030h, not even during rush hour, and this ride took 35 minutes, whereas only 17-18min on the Skytrain from Richmond Centre. It used to be 40-45min from UBC all the way to Commercial-Broadway. Now the 99 trip is longer thanks to the addition of stops at Arbutus and Fraser (not necessarily a bad thing) and that the driver drove like a grandma. The choice of extending Millenium Line Skytrain right to UBC is SO obvious here. There's ABSOLUTELY no need for a public discussion. There really should be over 90% support for this project. It's one of those times that a public discussion will do much worse to the region than not having one.

I tested whether the new C-Line Skytrain/99B routing will be faster than taking the 480 from Richmond Centre, and taking the former is still 5 min slower than the 480. If the M-Line Skytrain is extended to UBC, it would've only taken approximately 35min (assuming the Skytrain ride from Broadway-Ctiy Hall to UBC is halved compared to today's 99) to go to UBC all the way from Richmond Centre, almost the same time it takes to drive to UBC from the same starting point, at 30min, assuming ZERO traffic congestion!!! In comparison, it takes around 45-50min to go to UBC from Richmond Centre via the 480.

These anti-Skytrain folks and guys like Zweisystem are truly smoking crack!!
The trouble is, they often WIN !! §§ ........... ............ BUT ......... ...... THIS TIME I HOPE THEY LOSE.... BIG TIME....... THEY'D REGRET IT IN THE LONG RUN WHEN THE POPULATION GETS BIGGER AND THE TRAFFIC EAVER HEAVIER ..............
yes........
SYYTRAIN- AND THAT MEANS UNDER GROUND RAIL ALL/MOST OF THE WAY IS THE ONLY WAY. .................
here comes the train_here comes the train_ here comes the train
     
     
  #2095  
Old Posted Jan 11, 2010, 4:50 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,996
Hehe, you definitely get the spirit award!

The furthest west I would take it underground in Blanca Street, after that it should be elevated (or at grade akin to the C-line along Sea Island).
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #2096  
Old Posted Jan 11, 2010, 5:22 AM
dreambrother808 dreambrother808 is offline
Registered User
 
Join Date: Jan 2008
Location: Vancouver
Posts: 4,428
Quote:
Originally Posted by Prometheus View Post
On the contrary. Those who oppose state-run healthcare as a violation of individual freedom have a monopoly on logic (and morality) on this issue.
     
     
  #2097  
Old Posted Jan 11, 2010, 5:34 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,052
Quote:
Originally Posted by The_Henry_Man View Post
I took the 99 from Broadway-City Hall Station to visit a few old profs at UBC last week, packed literally like sardines (stood right beside the driver at the very front of bus, in front of the yellow line ALL THE WAY TO UBC) at 1030h, not even during rush hour, and this ride took 35 minutes, whereas only 17-18min on the Skytrain from Richmond Centre. It used to be 40-45min from UBC all the way to Commercial-Broadway. Now the 99 trip is longer thanks to the addition of stops at Arbutus and Fraser (not necessarily a bad thing) and that the driver drove like a grandma. The choice of extending Millenium Line Skytrain right to UBC is SO obvious here. There's ABSOLUTELY no need for a public discussion. There really should be over 90% support for this project. It's one of those times that a public discussion will do much worse to the region than not having one.

I tested whether the new C-Line Skytrain/99B routing will be faster than taking the 480 from Richmond Centre, and taking the former is still 5 min slower than the 480. If the M-Line Skytrain is extended to UBC, it would've only taken approximately 35min (assuming the Skytrain ride from Broadway-Ctiy Hall to UBC is halved compared to today's 99) to go to UBC all the way from Richmond Centre, almost the same time it takes to drive to UBC from the same starting point, at 30min, assuming ZERO traffic congestion!!! In comparison, it takes around 45-50min to go to UBC from Richmond Centre via the 480.

These anti-Skytrain folks and guys like Zweisystem are truly smoking crack!!
I also am a strong supporter of skytrain format transport to UBC
     
     
  #2098  
Old Posted Jan 11, 2010, 5:38 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,052
Question great idea, but I don't quite get all of it

Quote:
Originally Posted by Metro-One View Post
Hehe, you definitely get the spirit award!

The furthest west I would take it underground in Blanca Street, after that it should be elevated (or at grade akin to the C-line along Sea Island).
I'm sure about at-Grade, but I don't quite understand the role of Sea Island, or the reference to the c-line. Could you elaborate just a bit. thanks.
     
     
  #2099  
Old Posted Jan 11, 2010, 5:51 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,095
Quote:
Originally Posted by satishreddy View Post
UBC - 12000-15000 per day
Sasamat - 4000-6000 per day
Alma - 4000-6000 per day
MacDonald - 4000-6000 per day
Granville - 6000-8000 per day
Oak - 6000-8000 per day
Cambie 12000-15000 per day
Main 8000-10000 per day
There may be one more station between Main and Commercial/Broadway.
Broadway/Commercial 6000-8000 boarding to go west (not including people already on the train)
I think this number is a bit low, as your number only gives a ridership of 62000-83000 riders a day.

UBC - Using the 2008 data, if the SkyTrain take all of #44, #84, and #99 riders, and half of the riders on #4, #9, #17, #25, #480, this gives daily boarding of 15,500. If the ridership in UBC keeps with the pace of annual 3% growth in ridership, that gives a ridership of 22,100 by 2020, without taking into effect of the new rail system.

Sasmat, Alma, Macdonald - Using the 99 B-Line 2007 boarding and load data, assuming everyone who disembark at the station will board the train again in the return trip, annual transit ridership increase of 3%, and the increase of ridership of 80%, include conversion from local bus routes (as experienced from Canada Line):
Sasmat - 6800
Alma - 5800
Macdonald - 10,600

Granville - Assume 1/3 of the boarding of 99 B-Line come from 98 B-Line transfer, then the boarding would be 10,800

Oak - Using the data for Willow - 12,900

Cambie - Move the 1/3 transfer here, then add 50% for additional ridership from Canada Line and 25% of the ridership of #44 and #480 - 17,000

Main - Using the same method, 11,600

Commerical-Broadway - Assume the boarding on UBC line equals to the half of the rider alight the Expo Line who did not transfer to Millennium Line east, multiple by the same factor used above - 22,700

Total: 120,300, plus an increase of 3000 riders for VCC/Clark, plus some new riders from Finning and Arbutus.
     
     
  #2100  
Old Posted Jan 11, 2010, 6:19 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Quote:
Originally Posted by deasine View Post
That is not true, unless there is some accident that is blocking the tracks. That being said, LRT wouldn't be substantially faster than the current B-Line and would never match the speed of the SkyTrain unless it was built fully segregated from traffic.
Sorry for exaggerating.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure