  #10641  
Old Posted Dec 7, 2009, 1:26 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by Yume-sama View Post
Just wondering, is the Canada Line station actually NEAR Aberdeen Centre? Like, kind of directly connected?

Or, do you have to find it I have never been, but I am planning to go tomorrow.
LOL, it's a 3-minute walk from the station....about the same distance as Brighouse to the nearest entrance to Richmond Centre.
     
     
  #10642  
Old Posted Dec 7, 2009, 1:33 AM
teriyaki teriyaki is offline
Registered User
 
Join Date: Nov 2008
Posts: 606
Quote:
Originally Posted by Yume-sama View Post
Just wondering, is the Canada Line station actually NEAR Aberdeen Centre? Like, kind of directly connected?

Or, do you have to find it I have never been, but I am planning to go tomorrow.
Its a shame the extension lot right beside the station is still just a pile of dirt.

Don't let that discourage you though. Aberdeen is unmistakable, its the huge looming building right beside the station. 1 minute walk, 30 seconds if you're running
     
     
  #10643  
Old Posted Dec 7, 2009, 2:57 AM
metroXpress's Avatar
metroXpress metroXpress is offline
(||||||-||||-||||||)
 
Join Date: Jan 2009
Location: Vancouver B.C.
Posts: 2,220
^ they will get it built one day

just coming back to Vancouver, Yume-sama?
     
     
  #10644  
Old Posted Dec 7, 2009, 3:23 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,127
so it seems to me that todays christmas parade was the first big downtown event and test if you will for the new Canada line and how it deals with crowds etc.

I got on at broadway and off at VCC and they had some crowd control which wasn't needed at the time i was there and some of the people looked puzzled - they made them go through long windy lines to get to the stairs

anyway they had set out barriers and stuff - so they seemed to deal with it well

was anywhere there in the thick of it?

my friend who was there earlier said the lineup was quite long on the street
     
     
  #10645  
Old Posted Dec 7, 2009, 3:44 AM
Yume-sama's Avatar
Yume-sama Yume-sama is offline
Registered User
 
Join Date: May 2007
Location: Vancouver / Calgary / Tokyo
Posts: 7,523
Quote:
Originally Posted by metroXpress View Post
^ they will get it built one day

just coming back to Vancouver, Yume-sama?
Yes, for a few days. I am off to NYC Tuesday. So my stay is short lived.

And I must have Beard Papa Though they do have *one* location in NYC on Broadway.
     
     
  #10646  
Old Posted Dec 7, 2009, 3:50 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
Take the rav line to broadway/cityhall and walk across the street to city square.
     
     
  #10647  
Old Posted Dec 7, 2009, 3:53 AM
Yume-sama's Avatar
Yume-sama Yume-sama is offline
Registered User
 
Join Date: May 2007
Location: Vancouver / Calgary / Tokyo
Posts: 7,523
Quote:
Originally Posted by jlousa View Post
Take the rav line to broadway/cityhall and walk across the street to city square.
Are you sure that one is open Denman closed temporarily
     
     
  #10648  
Old Posted Dec 7, 2009, 5:41 AM
lightrail lightrail is offline
Registered User
 
Join Date: Oct 2007
Posts: 809
I asked over at Buzzer Blog why the Canada Line shuts down at 1:15am during the Olympic, while the Expo and Millennium are shutting down at 2:15a,. I suggested it was idiotic to have two different shutdown times and that Translink should have all the Sky trains running to the same shutdown time.

The answer: the Canada Line shut down time is not up to Translink, it's up to InTransit as the operator of the line.

So much for integrated transportation. InTransit will shut it down as soon as possible (under the agreement) tosave money, because that's all they're going to care about.

I'm not impressed.

Sigh: - how long to the next election?
     
     
  #10649  
Old Posted Dec 7, 2009, 3:42 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
I blame those who wrote the agreement... it just doesn't make sense to give up control over service hours like that.
     
     
  #10650  
Old Posted Dec 7, 2009, 5:07 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,730
Quote:
Originally Posted by Zassk View Post
I blame those who wrote the agreement... it just doesn't make sense to give up control over service hours like that.
Yes. Is the contract available somewhere? I imagine a freedom of information request should be able to produce it.
     
     
  #10651  
Old Posted Dec 7, 2009, 6:01 PM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Quote:
Originally Posted by SpongeG View Post
so it seems to me that todays christmas parade was the first big downtown event and test if you will for the new Canada line and how it deals with crowds etc.

I got on at broadway and off at VCC and they had some crowd control which wasn't needed at the time i was there and some of the people looked puzzled - they made them go through long windy lines to get to the stairs

anyway they had set out barriers and stuff - so they seemed to deal with it well

was anywhere there in the thick of it?

my friend who was there earlier said the lineup was quite long on the street
I saw the picture of VCC station taken by someone else yesterday, it's exactly like the opening day. Not looking good for the coming Olympics
     
     
  #10652  
Old Posted Dec 7, 2009, 6:16 PM
Yume-sama's Avatar
Yume-sama Yume-sama is offline
Registered User
 
Join Date: May 2007
Location: Vancouver / Calgary / Tokyo
Posts: 7,523
No, it is not looking good for the Olympics if the Santa Claus parade causes mass overload.

But, I would think a lot of people will be sticking around the downtown area, and those going to events not in downtown, may stick to the bus network.
     
     
  #10653  
Old Posted Dec 7, 2009, 6:35 PM
Canadian Mind's Avatar
Canadian Mind Canadian Mind is offline
Registered User
 
Join Date: Aug 2006
Posts: 3,907
As for the Canada Line shutdown times, will Translink be operating a bus-route to cover for the one hour that Canada Line is down but Expo/Millennium are not?

Also, what is the Canada Lines normal operating hours?

Last edited by deasine; Dec 7, 2009 at 8:46 PM.
     
     
  #10654  
Old Posted Dec 7, 2009, 6:37 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,730
Quote:
Originally Posted by Yume-sama View Post
No, it is not looking good for the Olympics if the Santa Claus parade causes mass overload.

But, I would think a lot of people will be sticking around the downtown area, and those going to events not in downtown, may stick to the bus network.
Well you're always going to get a crush for large events that start and end abruptly. The Olympics will be more like constant activity from morning until night.

How was the Canada Line for something like U2? That would be on par with the biggest events that happen during the Olympics, the opening/closing ceremonies.

They do need to provide peak level service all day for those 2 weeks though, on as many forms as possible (Skytrain, bus, Seabus, etc).
     
     
  #10655  
Old Posted Dec 7, 2009, 6:41 PM
Yume-sama's Avatar
Yume-sama Yume-sama is offline
Registered User
 
Join Date: May 2007
Location: Vancouver / Calgary / Tokyo
Posts: 7,523
Well, if they are expecting another 250,000 - 300,000 people during the Olympics, that is a bit larger than a U2 concert. BUT, where will these people be going is the big key. If it is true the Santa Claus parade had over 600,000 people this year, that is roughly what will be expected during the Olympics, and most of them probably won't be going home to Richmond... but will they go visit, shop, etc. ?

Either way, YVR - Downtown will probably be a complete zoo. It's already pretty busy.
     
     
  #10656  
Old Posted Dec 7, 2009, 7:35 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
The Canada Line will take the brunt of traffic to/from:

- the airport
- the oval (7600 people x 1-2 events/day x 12 days)
- curling (5600 people x 3 events/day x 10 days)
- UBC (6800 x 1-2 events/day x 10 days)

Plus a minority portion of the traffic to the daily victory ceremonies and GM Place events.

Canada Line will be more heavily stressed than the E/M lines... even before the capacity issues. I really hope that ProTrans will have all 20 trains available.

Thanks to the oval, and the airport traffic, both branches of the line will be busy.

Quote:
Originally Posted by Canadian Mind View Post
Also, what is the Canada Lines normal operating hours?
Canada Line starts 45 minutes earlier than E/M lines, and ends about 15 minutes earlier, on weekdays. Canada Line runs the same hours 7 days a week, so it has better hours than E/M lines on the weekends.

See here
     
     
  #10657  
Old Posted Dec 7, 2009, 8:09 PM
Pinion Pinion is offline
See ya down under, mates
 
Join Date: Jul 2007
Posts: 5,167
I finally rode the length of the line to catch a flight a few weeks ago. It was perfect but pitch black outside so I didn't see much.

Paying a cab driver $50 to get back to the North Shore when I got back after the Canada line shut down (2:00am) sucked though.
     
     
  #10658  
Old Posted Dec 7, 2009, 8:52 PM
mrjauk mrjauk is offline
Registered User
 
Join Date: Oct 2008
Posts: 555
Does anybody know if the Canada Line service schedule will be increased during the Olympics. I know that the service hours won't be extended but will they be using all 20 trains?
     
     
  #10659  
Old Posted Dec 7, 2009, 8:52 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,127
Quote:
Originally Posted by Canadian Mind View Post
As for the Canada Line shutdown times, will Translink be operating a bus-route to cover for the one hour that Canada Line is down but Expo/Millennium are not?

Also, what is the Canada Lines normal operating hours?
there are the nightowl busses which are really good and run every 30 minutes fromd owntown to the outlying suburbs
     
     
  #10660  
Old Posted Dec 7, 2009, 8:54 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by mrjauk View Post
Does anybody know if the Canada Line service schedule will be increased during the Olympics. I know that the service hours won't be extended but will they be using all 20 trains?
Probably not likely, unless they have to deal with a lot of lineups at stations.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:01 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.