Quote:
Originally Posted by jsbertram
I see you've missed a part of my message:
"Imagine if there was a C-Line station at Dunsmuir (instead of Georgia)"
In other words - VCC station would NOT have been built south of Georgia, but a different C-Line station "Dunsmuir Station" could have been built at Dunsmuir instead.
Or VCC Station could have been shifted north one block to sit between Pacific Centre and The Hudson and between the Pacific Centre Food Fare and the Dunsmuir Tunnel.
In either case, the two Skytrain stations (Granville for M-Line and E-Line; the imaginary "Dunsmuir Station" for the C-Line) could have been connected together in a common mezzanine that is open during SkyTrain's operations, rather than relying on the business hours of The Station and Pacific Centre / The Bay / Vancouver Centre to provide convenient interline transfers.
|
If the City Centre (CC) was moved closer to Granville (GV), that means the CC platforms would be just under Pacific Centre Food Court, meaning that the ticket concourse must exist below the platforms. It would be rather unusual to have this kind of setup. Access to Pacific Centre would go through the Food Court or Jacob. Of course, the ticket concourse can be where Jacob exists currently, with access to street level via H&M, but Pacific Centre won't let you do that. Moreover, accessing the platforms (centre platform) would require one to use two flights of stairs/escalators/elevators to the ticket concourse/connection corridor to the Expo Line (think Oakridge-41st). This type of configuration won't work well in a busy downtown station. I don't think such a configuration would work because currently, the C-Line goes over top of the Dunsmuir Tunnel, then dips down slightly (I'm pressuming under Pacific Centre), and then goes back up to CC platform. This means that the platforms would be rather slanted.
The alternate method is to have the C-Line go under the Dunsmuir Tunnel, but that would exponentially increase the cost of the station. There will be even longer escalators and elevators, all for the matter of a closer connection with GV.
Here's a good reference video:
http://www.youtube.com/watch?v=ebodV3UCHpc
Really, I don't see any benefits of having CC north of Georgia so it's closer to GV aside from the direct transfer. Having CC south of Georgia allows greater coverage when more entrances are built, given that the existing structures permit this (i.e. Robson Square fantasy, Robson St. Entrance, Sears Entrance, etc.).
I know your point is to have a direct connection from CC to GV, but there are conceptual plans by the CoV to have a more direct transfer between the two stations. Also keep in mind that there really aren't that many people transferring from the Expo Line/Millennium Line to the Canada Line, at least not yet. Until there is direct connection, CC and GV won't be indicated as an official transfer station. When there is a direction connection, CC and GV will probably be branded as the same station (renamed CC?), similar to Commercial-Broadway. And like I said before, you can transfer from CC to GV via street level, which I really don't find an issue, except when there is snow.