Quote:
Originally Posted by deasine
There is no doubt that it will have to be deeper, so tunnel boring machines must be used. From what I know, I think the portion from Finning Stn to Main/Kingsway Stn (because of the small streets and the sharp curve) to City Hall Stn must all be bored. Since it's rather deep, I would imagine using tunnel boring machines to slowly go back up would be similar in costs, if not cheaper, than cut & cover.
|
Agree - you can't cut diagonally across under properties with cut and cover; you could with a TBM. Not sure how the Right of Ways would work, but there may be a way to shorten the length of the connector and avoid that sharp turn.
As for extending west, if they're smart they'll go past City Hall to Arbutus. This serves the entire central broadway corridor and gets the UBC buses past the mess of traffic lights between Cambie & Arbutus. I think there would also be more room for an efficient transfer.
As a matter of fact, I suspect they could revive the non-stop shuttle at that point and simply serve Arbutus - UBC with a local bus.
And if they bore the section across 10th from Cambie to west of Burrard I could see the local businesses supporting rather than opposing.