My opinions on each of them:
In case anyone else might be interested, I thought I'd post the notes I took the other day at the DOTT briefing:
Quote:
Tunneys Pasture:
- There will be changes in operations to minimize the amount of lay-up space needed
- From the west, every third bus will continue along Scott to Booth and then to Gatineau – not to downtown
- The passenger bridge over the station will need to be widened by about three times to allow the passenger volumes
- Because tired support vehicles can no longer get to the station, it will be covered with a GREEN ROOF
- Although covered, the shelter will not be heated
- The side platforms and the tail tracks are 120 metres each, extending west of Holland Bridge
- Apparently the Holland Bridge is not long enough to allow the trains around a 10 metre central platform
- The underpass from the bus island comes out at track level, so people temporarily cross the tail track
- Trains will alternate between the platforms only during peak periods, otherwise, only one platform is used
- Screen platform doors will add about $1M to each station
- A Tunneys North bus station might be added along the Parkway to ‘spread the pain’
|
Side platforms are best there due to the station layout, re-using all the existing Transitway infrastructure.
Have they considered your plan to extend it to Westboro at the end of the trench in Phase 1, which would make more sense operationally with little additional cost?
Quote:
Bayview:
- A new station/bridge to be built north of the existing Transitway Bridge, prolonging bus use
- It will be a tri-level ‘⌐’ station with the O-Train on the west of the bottom level in the interim
- The upper level will be about 3-4 metres above the middle mezzanine, accessed via a bridge from Scott St.
- The upper level has side platforms so the trains are over the columns while the lower has a central platform
- The curves for a converted O-Train going east on the lower level will be protected for
- Prince of Wales Bridge might get ‘wings’ (like the Alexandra Bridge) for STO Rapibus to go to the lower level
- According to the OC Transpo 2010-19 Tactical Plan, Bayview is to be a main transfer hub
|
I like the wings idea for a temporary bridge, with the ultimate goal being a twinned or reconstructed Prince of Wales Bridge for LRT service to Gatineau.
As for bus use, I don't think Bayview should be a major transfer point, due to the lack of any lay-by area and proximity to downtown. The only bus route which would have to be relocated is the 86, which should run along Booth.
Quote:
LeBreton:
- Preston will be extended to the Ottawa River Parkway so Booth can be closed during construction
- Booth will get a new 6-lane bridge from Albert to north of the viaduct
- Albert is to be modified to have two left-turn lanes from the west
- LeBreton Station will be about a metre lower than the Transitway, and have a central platform
- Escalators and elevators will extend out from both sides of the bridge to the lower platform
|
Don't see anything wrong with that plan.
Quote:
Downtown West:
- The station is under Albert, centered on Bay Street
- There will be a mid-block, south-side access at the new Library and a north-side one at Place de Ville
- Alternately, the easterly access could also be on the south at Constitution Square
- The station platform is to be 30-35 metres below the surface (10-12 stories)
- The tunnel will be concrete lined to minimize water infiltration
- Ventilation will be provided by four shafts, one at each corner of the station
- The renderings show only two UP and two DOWN escalators, one of each at the ends of the central platform
- There will also be two elevators from the platform level plus two staircases
|
WAY too deep below the surface. I think it should be directly under Slater Street, about 5 storeys below the surface and cut-and-cover from Bay to Elgin.
I'd put it directly under the intersection of Slater and Bay.
All four of the downtown core stations should be central platforms.
Quote:
Downtown East:
- Stretches roughly between Bank and O’Connor Streets
- Central platform with accesses at Bank, O’Connor at Queen, and perhaps Sparks at O’Connor via a tunnel
|
I'd shift it to beneath Slater Street between Kent and Bank, with access from the corners.
I'd also add a third station along Slater Street, between Elgin and Metcalfe.
Quote:
Rideau:
- The station is positioned south of Wellington/Rideau, between Confederation Square and Sussex
- Platform depth near the Rideau Centre is about 27-28 metres – THIS NEEDS TO BE CONFIRMED
- Accesses are planned at the west and east ends, and on the north-east side of the Government Conference Centre
|
I'd shift it to beneath the Mackenzie King Bridge, either directly below or just to the east of the current bus station (depending on the gradient required below the Rideau Canal). It would require a bored tunnel from just west of Elgin/Slater below the Rideau Canal and on to Campus and Lees Stations.
Accesses should be from the Ottawa Congress Centre, the southeast part of the Rideau Centre and (restricted access) from the DND HQ.
Quote:
Campus:
- Positioned under the green embankment and Colonel By west of Nicholas
- Probable north access at the Corktown Bridge
|
I'd keep that plan as is.
Quote:
Lees:
- Not much changed, it remains as a side-platform station
- Only partially covered and likely only 120 metre platforms at this time
- Sidewalks extend north on both sides of the tracks and cross once the tracks enter the tunnel
|
I'd continue the tunnel under Highway 417 to Lees Station, building it just east of the current bus station and just beneath the surface, emerging to cross the Rideau River above ground.
I'd add an access directly into the station from the uOttawa campus (former Algonquin Rideau).
Quote:
Hurdman:
- A side-platform station sitting atop a 4 metre high embankment north of the existing bus station
- There will be two pedestrian passes through the embankment to reach the station escalators/elevators
- HURDMAN STATION DETAILS NEED TO BE CONFIRMED
- Similar to all surface stations, only 120 metre platforms will be built, with 60 expansion space to the east
- The existing bus facilities are to be trashed
- The Nicholas Connector Bridge was not indicated to be a sure thing
- The station is designed to never have the S-E Transitway converted to rail
|
I'd make drastic changes to Hurdman:
First of all, PROTECT FOR THE SOUTHEAST!!! That is the most important thing IMO, even though it isn't in the best position for train-bus transfers. I'd build it slightly elevated with a central platform (would require a tunnel or an at-grade crossing of the bus loop to connect to the bus platform)
To do so, I'd skew the rail line about 40 degrees, to allow for a reasonable curve in the ultimate stage. The main exit would be at the southeast side to reach the bus platform (which is unchanged), while a second exit at the northwest would reach the bike paths (closed late at night for safety reasons).
Quote:
Train:
- Much of the central lawn is excavated
- The station extends south-west from the bridge under the east driveway through the bridge on the west driveway
- This is a side-platform station with a bridging walkway along an embankment to the VIA Station entrance
- The $15M Coventry Pedestrian Bridge could be extended to the north-east end of the station
|
I agree with the proposed plan, it makes the best use of the land and prevents undesirable curves.
Quote:
St. Laurent:
- The existing upper level is generally unchanged
- The lower level remains side-platform, with the trains separated slightly to avoid a storm sewer in the middle
|
Best plan IMO, makes costs quite low as the infrastructure is already there.
Quote:
Cyrville:
- Station stays the same
- Minor track re-alignments stay within the existing property envelope
|
Don't see any other workable plan. Go with the proposed plan.
Quote:
Blair:
- Buses will be above the trains
- The lower level will be excavated two metres deeper for the central-platform train station
- Since this will be a terminus for a LONG time, the mall will likely be extended to better integrate with it
- Buses from both the Eastern Transitway and the Cumberland Transitway will transfer passengers here
|
Bad idea IMO due to the high costs. I would leave the local bus platform alone, and put the trains in the Transitway platform.
In the ultimate stage, the extension to Orleans should go directly under the Blair Road interchange, using underpasses of each ramp (total 4 new bridges) to connect to the existing Transitway.
Quote:
Rail Yard and Maintenance Facility:
- St. Laurent (between VIA and Belfast) is the recommended location
- The rail cars will be stored indoors
|
Excellent place, since it is directly adjacent to the St. Laurent Garage and makes good operational sense.