Old Posted Oct 15, 2009, 3:02 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
I agree with waterloowarrier. I have been totally baffled that a rail transit lobby group such as the Friends of the O-Train actually lobbied against the expansion of rail transit in Ottawa, which in turn costed taxpayers millions. This has set back rail transit in Ottawa by several years and discredited the whole idea of rail transit in the minds of many Ottawans.

As someone who lives not too far from Leitrim, I am happy that OC Transpo has introduced the 99 Transitway route as an alternative to light rail. I will continue to oppose extension of the O-Train as it cannot address the long-term transit needs of the community. At least a bus can get you downtown. The O-Train will never accomplish this.

I do wish that the Friends of the O-Train would make a more positive contribution instead of lobbying for something that the local community does not want.
Reply With Quote
     
     
  #2522  
Old Posted Oct 15, 2009, 12:59 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Transit committee agenda... a bunch of reports aren't up yet like the rail system selection report... Here's a few that are up right now:

Report on RFI for station locations

Removal of Browning Corridor

Coventry/Baseball Stadium to Train station pathway EA
Reply With Quote
     
     
  #2523  
Old Posted Oct 16, 2009, 3:31 AM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Quote:
Originally Posted by waterloowarrior View Post
I am referring to their lobbying that helped to kill the viable, funded plan to extend, double track, and electrify the line. LRT in the hand is worth more than sidings and Budd cars in the bush...
Oh... well that wasn't an O-Train extension, now was it? It was an O-Train replacement. But it makes no sense to replace it, especially at a cost of several hundred million dollars. It's doing what it needs to do, which is to bypass downtown Ottawa on the west side and were it to be extended to Gatineau it could replace the shuttle buses from LeBreton, freeing them up for duties elsewhere. It's the cleanest bit of transit infrastructure we have, so while electrification would clean it up a bit more, there are far bigger and filthier smoke clouds to get rid of first. Perhaps some people like David Gladstone are a bit too obsessed with the O-Train and claiming it can do things it can't, but people here seem to be equally obsessed with a curious hatred of it and a desire to get rid of it for no reason. I don't get it. LRT's Friend's apparent love of the winding #99 when I'm sure most people in south of the airport would sooner have an O-Train extension is just an example of that, as are odd statements about "Budd cars in the bush". It's also somewhat odd to have been in favour of N-S LRT and to now be opposed to surface LRT downtown. Anyway, at least we've still got $800M+ in hand to spend on something useful. That we haven't done anything with that money goes to show the same lack of thought at work that went in to coming up with the project in the first place.

The O-Train replacement plan, to remind everyone, had the following great long list of flaws:
  • stopped downtown at the UoO; the consultants refused to extend it to Hurdman. This ensured it would deadhead through downtown, the most congested part of the whole transit system
  • would not address the biggest actual problem in the transit network - the downtown congestion (related to above)
  • it would get stuck in the bus jams, giving it no reliability
  • it would have replaced the 105-115 lbs/yd rail on the line (which had just been laid in 2003) with 130 lbs/yd rail. Yes, we were going to replace lighter-duty branchline heavy rail with even heavier rail used for heavily-used mainlines. Calgary Transit uses 100 lbs/yd rail.
  • called for the unnecessary shutdown of our only rail transit service for three years, even though they were ordered not to shut it down. The CPR managed to keep the line open when they built the tunnel and cutting in the first place (it used to go over the Canal by a bridge and was at grade where the current cutting is), but managing to widen what they did is apparently beyond us half a century later. No railway contractor in his right mind would tear out tracks if asked to widen a cutting, yet that's what our BRT consultants would have had us do as the first step so as to facilitate sending lots of dump trucks on Preston. The failure to regard the existing track as a construction asset is clear proof that the powers-that-be had no appreciation for how to build a railway. Of course dumping the entire project into one great big consortium bid didn't help matters either. Separate specialized contractors should have been charged with doing the different sections. Widening a railway rock cut and rebuilding downtown streets for rail are quite different activities, after all.
  • would build an unnecessary second tunnel under Dow's Lake and would have raised the floor of the existing one. That tunnel takes less than 60 seconds to pass through at the *average* speed of 40 km/h, and just less than 45 seconds at 50 km/h. I realize some people have an irrational hatred of single tracks, but that does not change the fact that they are functional, economical and that the capacity provided by a second tunnel was never going to be needed anyway. Urbandale's transportation expert said as much, but, again, given the lack of knowledge about railways here in Ottawa such expertise falls on deaf ears. That's not too surprising when we have Andy Haydon prattling on about how light rail supposedly uses a different gauge track than heavy rail.
  • unnecessary second bridge over the Rideau, combined with an unnecessary dismantling of the existing one to put in a lighter weight structure. Same as previous, the capacity provided was not required, and replacing the existing bridge was just plain bizarre.
  • roller coaster overpass (5% gradient up then down) of the VIA tracks and the SE Transitway right next to Confederation Station, and on a curve to boot (lots of brake, wheel and rail wear). What is a grade-separation required for here? The SW Transitway crosses the same line at grade, and it's got buses driving around randomly rather than signal-controlled trains. This is just another example of the grade-separate-it-for-the-hell-of-it mentality that pervades in BRT-obsessed Ottawa. Waiting a few extra seconds for a VIA train to go by is not going to matter a fig when the trains are going to get stuck in a bus jam downtown.
  • another roller coaster overpass of the freight line at Walkley Yard right next to Greenboro Station (more brake, wheel and rail wear). Right now, barely any trains use this crossing, so the chance of delay is minimal. But even supposing it was a problem, the solution is to go under like the SE Transitway does, not over. True, that would have led to a grade-crossing with the Transitway itself - but so what? They were going to do that in Barrhaven anyway as well as all the way though downtown (remember the bus jams?). But that also leads to the next point:
  • all of the works south of the VIA crossing were unnecessary anyway. The adjacent portion of the SE Transitway should have just been converted (or even widened between stations). This would have saved vast sums of money and would have avoided the need to build yet another new bridge over Hunt Club - recall that a spur track to the NRC had to be maintained and to this end a completely new combined light and heavy rail bridge would have been built over Hunt Club to the west of the current bridge, which would have carried the northbound light rail track, the southbound going onto the new bridge. This is when a perfectly usable Transitway bridge already exists next to it. The spur track would have been built to the west of the current track, filling in swamps and wetlands containing the Blandings Turtle. There is a service road to the east of the track (in line, as it happens, with the Transitway overpass of Hunt Club) but this wasn't quite wide enough to accommodate two tracks and two sideloaded platforms at Lester (a centre-loaded platform would have worked though), so naturally wetlands had to be filled-in instead. Oh yes, I know Council deleted Lester Station at the last minute - but the plans weren't about to change because of a minor detail like that. After all, we can't make it difficult to convert to or share with BRT later.
  • the maintenance facility was to be at Bowesville Road on a greenfield site miles from a heavy rail connection (unless that spur was to be extended further south still) rather than putting it somewhere sane like Walkley Yard. And the reason for not putting it at Walkley was... yes, that's right... remember that roller coaster overpass? Well there'd be no easy way to access that sucker without spending even more money! Had they planned to go under the rail line, or use the Transitway, well, that would have been different, but that's not what they decided to do for some reason. I wonder why.
  • down in Riverside South, the alignment takes a bit of a winding route while managing to miss out most of the designated employment areas.
  • then it crosses the Rideau River to go to Barrhaven where it subsidizes a road bridge and when the buses heading north will beat it to downtown anyway. This section, btw, was to be single track initially due to a last minute cost-cutting exercise. Apparently single track isn't so bad after all - the funny thing being that passing sidings would have been required due to the fact it was too much trackage for only one train to occupy there-and-back in one go at the desired frequencies. The mind boggles at the inconsistency of it all.

On top of all that, it wasn't going to do much to increase ridership (a conversion of the Transitway will easily net more) and it was all packaged in an overly secretive contract.

And that's what you get when you let BRT consultants design a railway. We're not talking about one or two minor flaws here and there - we're talking about a great long litany of significant flaws with lots of money attached to most of them, in the order of $100-200M. All public attempts, and by numerous groups, to get the most egregious faults - the downtown - fixed were met with a brick wall of being "too expensive" (which is rich considering the waste elsewhere on the line). The N-S LRT would have been a great big expensive failure and it would have been the last LRT we would get in a generation. The public at large would be decrying how stupid it was to put these trains in with buses, shaking their heads at yet another dumb Council decision. Once it was in place most people would quickly realize, if they didn't know already, that it wasn't going to benefit them (and, indeed, would have curtailed express routes even faster). People in Riverside South would be complaining that all the seats were already full once it left Barrhaven. This project would have tainted the entire concept of LRT. The Andy Haydons and John Bonsalls of the world would have been out in force telling us what a waste of money LRT was and would be really pushing their bus tunnels, with support from the BRT consultants. Instead, virtually everyone knows that the gig is up for BRT downtown while there is no great feeling against LRT at the moment. It was a project with a dubious premise to begin with which was then riddled with so many flaws that it should never have seen the light of day never mind Council chambers. So anyone who was partially responsible for stopping the N-S LRT project should get an award for averting the waste of hundreds of millions of dollars, even if doing so cost tens of millions.

With the $880M or so that was committed, imagine what we could have got instead of an overpriced replacement line. Right now we're contemplating LRT from Blair to Tunney's via a tunnel downtown. Well with $880M we could have had that but via the surface downtown and still had some money to spare. That would have been a worthwhile investment in LRT. No more bus jams, no more high-cost BRT downtown (at least $20M annual savings just there), no more particulate emissions, a reduction in noise and a real increase in capacity. We would have had an unimaginable increase in the City's image from a much-improved downtown environment compared to what would look like trams stuck in traffic. Today, with a successful transitway conversion behind us, we'd be looking to extend LRT westwards to Lincoln Fields and beyond and probably southwards to South Keys and beyond via the SE Transitway.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #2524  
Old Posted Oct 16, 2009, 12:36 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Some good points there Dado.

So, do we need a transit authority or what would fix the problem? Clearly a new set of councillors won't do it. Or is it the developers that fund the councillors' campaigns that stack the deck?
__________________
Francois
Reply With Quote
     
     
  #2525  
Old Posted Oct 16, 2009, 1:06 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by Dado View Post
Oh... well that wasn't an O-Train extension, now was it? It was an O-Train replacement. But it makes no sense to replace it, especially at a cost of several hundred million dollars. It's doing what it needs to do, which is to bypass downtown Ottawa on the west side and were it to be extended to Gatineau it could replace the shuttle buses from LeBreton, freeing them up for duties elsewhere. It's the cleanest bit of transit infrastructure we have, so while electrification would clean it up a bit more, there are far bigger and filthier smoke clouds to get rid of first. Perhaps some people like David Gladstone are a bit too obsessed with the O-Train and claiming it can do things it can't, but people here seem to be equally obsessed with a curious hatred of it and a desire to get rid of it for no reason. I don't get it. LRT's Friend's apparent love of the winding #99 when I'm sure most people in south of the airport would sooner have an O-Train extension is just an example of that, as are odd statements about "Budd cars in the bush". It's also somewhat odd to have been in favour of N-S LRT and to now be opposed to surface LRT downtown. Anyway, at least we've still got $800M+ in hand to spend on something useful. That we haven't done anything with that money goes to show the same lack of thought at work that went in to coming up with the project in the first place.

The O-Train replacement plan, to remind everyone, had the following great long list of flaws:
  • stopped downtown at the UoO; the consultants refused to extend it to Hurdman. This ensured it would deadhead through downtown, the most congested part of the whole transit system
  • would not address the biggest actual problem in the transit network - the downtown congestion (related to above)
  • it would get stuck in the bus jams, giving it no reliability
  • it would have replaced the 105-115 lbs/yd rail on the line (which had just been laid in 2003) with 130 lbs/yd rail. Yes, we were going to replace lighter-duty branchline heavy rail with even heavier rail used for heavily-used mainlines. Calgary Transit uses 100 lbs/yd rail.
  • called for the unnecessary shutdown of our only rail transit service for three years, even though they were ordered not to shut it down. The CPR managed to keep the line open when they built the tunnel and cutting in the first place (it used to go over the Canal by a bridge and was at grade where the current cutting is), but managing to widen what they did is apparently beyond us half a century later. No railway contractor in his right mind would tear out tracks if asked to widen a cutting, yet that's what our BRT consultants would have had us do as the first step so as to facilitate sending lots of dump trucks on Preston. The failure to regard the existing track as a construction asset is clear proof that the powers-that-be had no appreciation for how to build a railway. Of course dumping the entire project into one great big consortium bid didn't help matters either. Separate specialized contractors should have been charged with doing the different sections. Widening a railway rock cut and rebuilding downtown streets for rail are quite different activities, after all.
  • would build an unnecessary second tunnel under Dow's Lake and would have raised the floor of the existing one. That tunnel takes less than 60 seconds to pass through at the *average* speed of 40 km/h, and just less than 45 seconds at 50 km/h. I realize some people have an irrational hatred of single tracks, but that does not change the fact that they are functional, economical and that the capacity provided by a second tunnel was never going to be needed anyway. Urbandale's transportation expert said as much, but, again, given the lack of knowledge about railways here in Ottawa such expertise falls on deaf ears. That's not too surprising when we have Andy Haydon prattling on about how light rail supposedly uses a different gauge track than heavy rail.
  • unnecessary second bridge over the Rideau, combined with an unnecessary dismantling of the existing one to put in a lighter weight structure. Same as previous, the capacity provided was not required, and replacing the existing bridge was just plain bizarre.
  • roller coaster overpass (5% gradient up then down) of the VIA tracks and the SE Transitway right next to Confederation Station, and on a curve to boot (lots of brake, wheel and rail wear). What is a grade-separation required for here? The SW Transitway crosses the same line at grade, and it's got buses driving around randomly rather than signal-controlled trains. This is just another example of the grade-separate-it-for-the-hell-of-it mentality that pervades in BRT-obsessed Ottawa. Waiting a few extra seconds for a VIA train to go by is not going to matter a fig when the trains are going to get stuck in a bus jam downtown.
  • another roller coaster overpass of the freight line at Walkley Yard right next to Greenboro Station (more brake, wheel and rail wear). Right now, barely any trains use this crossing, so the chance of delay is minimal. But even supposing it was a problem, the solution is to go under like the SE Transitway does, not over. True, that would have led to a grade-crossing with the Transitway itself - but so what? They were going to do that in Barrhaven anyway as well as all the way though downtown (remember the bus jams?). But that also leads to the next point:
  • all of the works south of the VIA crossing were unnecessary anyway. The adjacent portion of the SE Transitway should have just been converted (or even widened between stations). This would have saved vast sums of money and would have avoided the need to build yet another new bridge over Hunt Club - recall that a spur track to the NRC had to be maintained and to this end a completely new combined light and heavy rail bridge would have been built over Hunt Club to the west of the current bridge, which would have carried the northbound light rail track, the southbound going onto the new bridge. This is when a perfectly usable Transitway bridge already exists next to it. The spur track would have been built to the west of the current track, filling in swamps and wetlands containing the Blandings Turtle. There is a service road to the east of the track (in line, as it happens, with the Transitway overpass of Hunt Club) but this wasn't quite wide enough to accommodate two tracks and two sideloaded platforms at Lester (a centre-loaded platform would have worked though), so naturally wetlands had to be filled-in instead. Oh yes, I know Council deleted Lester Station at the last minute - but the plans weren't about to change because of a minor detail like that. After all, we can't make it difficult to convert to or share with BRT later.
  • the maintenance facility was to be at Bowesville Road on a greenfield site miles from a heavy rail connection (unless that spur was to be extended further south still) rather than putting it somewhere sane like Walkley Yard. And the reason for not putting it at Walkley was... yes, that's right... remember that roller coaster overpass? Well there'd be no easy way to access that sucker without spending even more money! Had they planned to go under the rail line, or use the Transitway, well, that would have been different, but that's not what they decided to do for some reason. I wonder why.
  • down in Riverside South, the alignment takes a bit of a winding route while managing to miss out most of the designated employment areas.
  • then it crosses the Rideau River to go to Barrhaven where it subsidizes a road bridge and when the buses heading north will beat it to downtown anyway. This section, btw, was to be single track initially due to a last minute cost-cutting exercise. Apparently single track isn't so bad after all - the funny thing being that passing sidings would have been required due to the fact it was too much trackage for only one train to occupy there-and-back in one go at the desired frequencies. The mind boggles at the inconsistency of it all.

On top of all that, it wasn't going to do much to increase ridership (a conversion of the Transitway will easily net more) and it was all packaged in an overly secretive contract.

And that's what you get when you let BRT consultants design a railway. We're not talking about one or two minor flaws here and there - we're talking about a great long litany of significant flaws with lots of money attached to most of them, in the order of $100-200M. All public attempts, and by numerous groups, to get the most egregious faults - the downtown - fixed were met with a brick wall of being "too expensive" (which is rich considering the waste elsewhere on the line). The N-S LRT would have been a great big expensive failure and it would have been the last LRT we would get in a generation. The public at large would be decrying how stupid it was to put these trains in with buses, shaking their heads at yet another dumb Council decision. Once it was in place most people would quickly realize, if they didn't know already, that it wasn't going to benefit them (and, indeed, would have curtailed express routes even faster). People in Riverside South would be complaining that all the seats were already full once it left Barrhaven. This project would have tainted the entire concept of LRT. The Andy Haydons and John Bonsalls of the world would have been out in force telling us what a waste of money LRT was and would be really pushing their bus tunnels, with support from the BRT consultants. Instead, virtually everyone knows that the gig is up for BRT downtown while there is no great feeling against LRT at the moment. It was a project with a dubious premise to begin with which was then riddled with so many flaws that it should never have seen the light of day never mind Council chambers. So anyone who was partially responsible for stopping the N-S LRT project should get an award for averting the waste of hundreds of millions of dollars, even if doing so cost tens of millions.

With the $880M or so that was committed, imagine what we could have got instead of an overpriced replacement line. Right now we're contemplating LRT from Blair to Tunney's via a tunnel downtown. Well with $880M we could have had that but via the surface downtown and still had some money to spare. That would have been a worthwhile investment in LRT. No more bus jams, no more high-cost BRT downtown (at least $20M annual savings just there), no more particulate emissions, a reduction in noise and a real increase in capacity. We would have had an unimaginable increase in the City's image from a much-improved downtown environment compared to what would look like trams stuck in traffic. Today, with a successful transitway conversion behind us, we'd be looking to extend LRT westwards to Lincoln Fields and beyond and probably southwards to South Keys and beyond via the SE Transitway.
These are same old tiresome arguments. My point is that if you have $880 M, you better invest in real new service, otherwise, you have little hope of attracting new ridership. All this business of putting trains down the transitway is simply moving existing ridership from buses onto trains at big expense. Where is the new ridership going to come from? Perhaps, from population growth. The whole point of investing tons of money into rapid transit, is to try to attract new markets to transit. This kind of approach will fail.

Furthermore, the 99 bus route goes directly from Riverside South to downtown. An O-Train extension terminates miles from Riverside South and then bypasses downtown. Although the current O-Train serves a niche transit rider market of mostly Carleton University students and staff, the point of extending rapid transit to Riverside South is to address the main need of providing service to downtown. The extra points along the way are a bonus.

Regarding the so called fiasco in Barrhaven, this extension was at minimal cost and was designed for expansion to double track service when needed in the future. The fact that you could take a bus from Barrhaven Town Centre, the very end of the line, faster to downtown by a few minutes, really is overemphasized, when it was the very end of the line and there are other destinations along the route where significantly faster service would be provided. Furthermore, many Barrhaven residents would have had walk-on rail service. Of course, by your logic, it is more desireable to make everybody drive to the rail station at some remote location. The only alternative under serious discussion will not provide rail service to Barrhaven or Orleans or Kanata probably in my lifetime.
Reply With Quote
     
     
  #2526  
Old Posted Oct 16, 2009, 2:20 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,801
Quote:
Originally Posted by Dado View Post
The O-Train replacement plan, to remind everyone, had the following great long list of flaws:
  • it would have replaced the 105-115 lbs/yd rail on the line (which had just been laid in 2003) with 130 lbs/yd rail. Yes, we were going to replace lighter-duty branchline heavy rail with even heavier rail used for heavily-used mainlines. Calgary Transit uses 100 lbs/yd rail.
  • called for the unnecessary shutdown of our only rail transit service for three years, even though they were ordered not to shut it down. The CPR managed to keep the line open when they built the tunnel and cutting in the first place (it used to go over the Canal by a bridge and was at grade where the current cutting is), but managing to widen what they did is apparently beyond us half a century later. No railway contractor in his right mind would tear out tracks if asked to widen a cutting, yet that's what our BRT consultants would have had us do as the first step so as to facilitate sending lots of dump trucks on Preston. The failure to regard the existing track as a construction asset is clear proof that the powers-that-be had no appreciation for how to build a railway. Of course dumping the entire project into one great big consortium bid didn't help matters either. Separate specialized contractors should have been charged with doing the different sections. Widening a railway rock cut and rebuilding downtown streets for rail are quite different activities, after all.
  • would build an unnecessary second tunnel under Dow's Lake and would have raised the floor of the existing one. That tunnel takes less than 60 seconds to pass through at the *average* speed of 40 km/h, and just less than 45 seconds at 50 km/h. I realize some people have an irrational hatred of single tracks, but that does not change the fact that they are functional, economical and that the capacity provided by a second tunnel was never going to be needed anyway. Urbandale's transportation expert said as much, but, again, given the lack of knowledge about railways here in Ottawa such expertise falls on deaf ears. That's not too surprising when we have Andy Haydon prattling on about how light rail supposedly uses a different gauge track than heavy rail.
  • unnecessary second bridge over the Rideau, combined with an unnecessary dismantling of the existing one to put in a lighter weight structure. Same as previous, the capacity provided was not required, and replacing the existing bridge was just plain bizarre.
  • roller coaster overpass (5% gradient up then down) of the VIA tracks and the SE Transitway right next to Confederation Station, and on a curve to boot (lots of brake, wheel and rail wear). What is a grade-separation required for here? The SW Transitway crosses the same line at grade, and it's got buses driving around randomly rather than signal-controlled trains. This is just another example of the grade-separate-it-for-the-hell-of-it mentality that pervades in BRT-obsessed Ottawa. Waiting a few extra seconds for a VIA train to go by is not going to matter a fig when the trains are going to get stuck in a bus jam downtown.
  • another roller coaster overpass of the freight line at Walkley Yard right next to Greenboro Station (more brake, wheel and rail wear). Right now, barely any trains use this crossing, so the chance of delay is minimal. But even supposing it was a problem, the solution is to go under like the SE Transitway does, not over. True, that would have led to a grade-crossing with the Transitway itself - but so what? They were going to do that in Barrhaven anyway as well as all the way though downtown (remember the bus jams?). But that also leads to the next point:
  • all of the works south of the VIA crossing were unnecessary anyway. The adjacent portion of the SE Transitway should have just been converted (or even widened between stations). This would have saved vast sums of money and would have avoided the need to build yet another new bridge over Hunt Club - recall that a spur track to the NRC had to be maintained and to this end a completely new combined light and heavy rail bridge would have been built over Hunt Club to the west of the current bridge, which would have carried the northbound light rail track, the southbound going onto the new bridge. This is when a perfectly usable Transitway bridge already exists next to it. The spur track would have been built to the west of the current track, filling in swamps and wetlands containing the Blandings Turtle. There is a service road to the east of the track (in line, as it happens, with the Transitway overpass of Hunt Club) but this wasn't quite wide enough to accommodate two tracks and two sideloaded platforms at Lester (a centre-loaded platform would have worked though), so naturally wetlands had to be filled-in instead. Oh yes, I know Council deleted Lester Station at the last minute - but the plans weren't about to change because of a minor detail like that. After all, we can't make it difficult to convert to or share with BRT later.
  • the maintenance facility was to be at Bowesville Road on a greenfield site miles from a heavy rail connection (unless that spur was to be extended further south still) rather than putting it somewhere sane like Walkley Yard. And the reason for not putting it at Walkley was... yes, that's right... remember that roller coaster overpass? Well there'd be no easy way to access that sucker without spending even more money! Had they planned to go under the rail line, or use the Transitway, well, that would have been different, but that's not what they decided to do for some reason. I wonder why.
  • down in Riverside South, the alignment takes a bit of a winding route while managing to miss out most of the designated employment areas.
  • then it crosses the Rideau River to go to Barrhaven where it subsidizes a road bridge and when the buses heading north will beat it to downtown anyway. This section, btw, was to be single track initially due to a last minute cost-cutting exercise. Apparently single track isn't so bad after all - the funny thing being that passing sidings would have been required due to the fact it was too much trackage for only one train to occupy there-and-back in one go at the desired frequencies. The mind boggles at the inconsistency of it all.
Do we really want to get into all of this again? This is exactly what lrt's friend and waterloo were referring to when they said that FOTO had hijacked transit expansion in Ottawa.

Dado, are you an engineer? Do you not think that some of the things you mentioned above (i.e. grade separations, bridge replacement, rail guage, etc.) were considered by people with expertise and were in the plan for a reason?

It's ridiculous to list things like the weight of the rail among the "major flaws" of the plan.... it seems like the overall benefits of increased transit ridership were ignored by FOTO on account of some disagreements regarding specific technical details.

The phrase "not seesing the forest for the trees" comes to mind.
Reply With Quote
     
     
  #2527  
Old Posted Oct 16, 2009, 6:24 PM
matty14 matty14 is offline
Registered User
 
Join Date: Mar 2009
Posts: 139
Quote:
Originally Posted by Dado View Post
If we're going to contemplate a metro then frankly it should be done around routes quite different than those of the Transitway. There should be a north-south route coming from Hull, under the river and down the Bank Street alignment to about Billings Bridge. An East-West alignment should follow Carling Avenue - downtown - Rideau/Montreal Rd. A metro should have lots more walk-on opportunities than any of the Transitway corridors currently do.
Interesting you should bring up metro lines such as that, a while back (2004-2005) when Ottawa was contemplating our light rail future, I stumbled upon an outlandish proposal for a full-fledged subway system:

http://www.mediafire.com/?entmtzjnktm

Of course, one thing to remember that this is a very pie-in-the-sky, no consideration for money idea, as I doubt Ottawa ridership would warrant such a system. But it's still cool to think of the possibilities. As well, this is not my work and I cannot take credit for it, but it was posted by some anonymous author so I don't know who to give credit to.

You didn't have any part in this did you?
Reply With Quote
     
     
  #2528  
Old Posted Oct 16, 2009, 7:06 PM
blackjagger's Avatar
blackjagger blackjagger is offline
Registered User
 
Join Date: Jun 2009
Location: Ottawa, Ontario
Posts: 287
If only eh. It would be interesting if such a thought process existed. A plan like this is not only easier to implement because it supplements existing before developing the transitways , its enables multi technologies, say metro for east-west and north-south routes, heavy train for commuter trains, and lrt for the O-train loop and even the transitway conversion (though metro would be great I just see the section to Barrhaven not happening).

Though I think we need to get commuters on rapid transit, our current LRT plan doesn't help with some of our existing built up corridors such as Carling, Montreal rd, Bank St, or even the south-east transitway. I also really like the street cars for baseline/heron, there is another corridor that has the potential to be built up and already has quite the population density along it in some spots.

Though at this point we just need to get going, its too bad more thought was put into moving people around Ottawa instead of just commuters doing a 9 to 5.

Cheers,
Josh
Reply With Quote
     
     
  #2529  
Old Posted Oct 16, 2009, 10:13 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,632
It would be interesting to do a full EA on the metro plan, using automated trains as the base case and costing difference plans based on where it transitions from at grade/elevated/ and tunneled.

The first phase of this might cost around the same as first phase of the LRT plan in the end ($2 billion-$2.5) in a spitball estimate. I wonder if it would relieve the transit way enough to provide some breathing room for at least ten years.
Reply With Quote
     
     
  #2530  
Old Posted Oct 17, 2009, 1:38 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by bradnixon View Post
Do we really want to get into all of this again? This is exactly what lrt's friend and waterloo were referring to when they said that FOTO had hijacked transit expansion in Ottawa.

Dado, are you an engineer? Do you not think that some of the things you mentioned above (i.e. grade separations, bridge replacement, rail guage, etc.) were considered by people with expertise and were in the plan for a reason?

It's ridiculous to list things like the weight of the rail among the "major flaws" of the plan.... it seems like the overall benefits of increased transit ridership were ignored by FOTO on account of some disagreements regarding specific technical details.

The phrase "not seesing the forest for the trees" comes to mind.
Thanks for your support.

It never ceases to amaze me how conversion of the Transitway to rail is trivialized and the disruption for so many more thousands of passengers is hardly mentioned by those same people who harp on about the shut down of the O-Train for 3 years when it was always regarded as a 'temporary' demonstration line. It was as if all the affected passengers were going to left high and dry, when a temporary bus service was going to fill in the gap.

I have heard so many silly arguments from this so-called group of rail experts making outrageous claims of where trains can run and how easy it is to implement. We can double the number of O-Trains crossing active rail lines. No problem, eventhough it was difficult to get permission to run the current number of trains. Sure, it will be easy to double the number of trains. I bet!

The Barrhaven Bullit would be such a great improvement. How frequent could these heavy rail trains run when we have to accomodate Via Rail schedules, and if the trains are running late (??), and how is a bus transfer at both ends such a big improvement over existing Transitway service or the N-S LRT line that this same group panned so much?

Conversion of the Transitways to rail is a breeze. Even buses, could continue to run on the Transitway while rail is being laid. Come on! The Transitway will be realligned, stations redesigned, the roadbed dug up and electrical service added. Once conversion begins, there will be no buses on the Transitway.

Then there was the long list of problems with the N-S LRT route, yet we had detailed engineering designs and a fixed price construction contract. It doesn't sound like those problems are so serious, otherwise why would multinational companies sign a contract to build it. There always seems to be a double standard. A sharp turn going into Hull from the Prince of Wales bridge is just fine, thank you very much, yet much more gentle curves running through Riverside South are considered unacceptable. This is supposed to be modern light rail, not trudging 19th century steam trains.

FOTO arguments all sound like a bunch of engineering mumble jumble designed to confuse the public to justify their own pet plan, regardless of whether it will provide the service that the public is expecting and deserves.
Reply With Quote
     
     
  #2531  
Old Posted Oct 17, 2009, 2:56 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,673
Has anyone heard a good justification for running a parallel Bus/Train link from Baseline to Lincoln Fields?

The only thing I have heard is that it removes one transfer for people going between Barrhaven and Kanata. That is, they do not have to transfer from their bus at Baseline onto a train to transfer again at Lincoln Fields back onto a bus. They would stay on their bus through to Lincoln Fields and transfer directly to the Kanata bus there.

Since there is a plan to build a BASELINE BRT, why are we not using it for those folks too?



The red line is the path riders would need to follow if Staff's plan is followed, while the green line is the Baseline route. The blue option might not be feasible due to grade differences, but if it were, it would shave an additional 150m and one signal light from the Baseline route.

Already, the Baseline route is much shorter than the Lincoln Fields route; 6,200m vrs 6,900m (assuming the alignment shown - add 800m if Roman is used), but the big thing is cost. The Baseline BRT from Baseline Station to Bayshore Station is estimated at $36M while connecting Pinecrest to the S-W Transitway alone is estimated at $171M: Plus there are such things as an extra $20M for another 417 underpass. That underpass alone is over half of the cost of the BRT route.

Personaly, I would suggest moving the Baseline BRT up to Phase 1, Increment 1 (currently it is in Phase 2) and ditching the idea of keeping buses between Baseline Station and Lincon Fields. Then, in Phase 1, Increment 2 (sooner if possible), I would get upper level funding for a 'new LRT line' from Lincoln Fields to Bayshore as well as converting the existing S-W Transitway between Lincon Fields and Baseline Stations to rail. (The hard part will be dealing with the normal S-W Transitway traffic during the conversion.)
Reply With Quote
     
     
  #2532  
Old Posted Oct 17, 2009, 4:43 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Where is the plan for the baseline BRT? It's not in the TMP is it?
__________________
Francois

Last edited by Franky; Oct 17, 2009 at 5:03 PM.
Reply With Quote
     
     
  #2533  
Old Posted Oct 18, 2009, 7:19 AM
m0nkyman m0nkyman is offline
Registered User
 
Join Date: Oct 2006
Location: Ottawa
Posts: 2,032
Yes it is. http://www.ottawa.ca/residents/public_co...plan/images/pres_technical_review_en.pdf
Page 6 has the recommended 2031 transit network with a Baseline BRT line.

For someone who seems to be posting a lot, and arguing a lot, you sure seem to know very little about what is actually going on.
Reply With Quote
     
     
  #2534  
Old Posted Oct 18, 2009, 10:44 AM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by m0nkyman View Post
Yes it is. http://www.ottawa.ca/residents/public_co...plan/images/pres_technical_review_en.pdf
Page 6 has the recommended 2031 transit network with a Baseline BRT line.

For someone who seems to be posting a lot, and arguing a lot, you sure seem to know very little about what is actually going on.
Thanks for the link, but it shows "intensive transit" on the draft map. BRT is a different animal.
__________________
Francois

Last edited by Franky; Oct 18, 2009 at 11:25 AM.
Reply With Quote
     
     
  #2535  
Old Posted Oct 19, 2009, 12:49 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Councillors Worried Tunnel Route Could Disturb Memorial Ground
http://www.cfra.com/?cat=1&nid=68721

???
__________________
Francois
Reply With Quote
     
     
  #2536  
Old Posted Oct 20, 2009, 10:27 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Latest transit recommendation for Ottawa: LRT with overhead wires




By Patrick Dare , The Ottawa CitizenOctober 20, 2009 6:02 PMBe the first to post a comment

OTTAWA — Light-rail electric trains powered by overhead wires are being recommended as the best technology for Ottawa’s new public transit system.

The recommendation, to be contained in a report to council’s transit committee Wednesday, is one of several important pieces of information to be released over the next few days on the ambitious transit plan.
Council and its planners have for years wanted to use light-rail technology and this is to be confirmed Wednesday, a senior city official said. Light rail with overhead wires — as opposed to a heavier rail system such as Toronto’s subway — means Ottawa would not have to ensure that the whole system is grade separated. Therefore future extensions of the rail corridor into outlying communities would allow the rail cars to run at road level, if necessary.

The technology choice, to be confirmed by councillors Nov. 18, sets the stage for more detailed planning and negotiations for the transit project, which sees: a downtown tunnel; the bus transitway converted to rail from Blair Station to Tunney’s Pasture; rail extended eventually to Baseline Station, as well as to the south; and expansions of the bus system in suburban areas.

With a preferred rail technology chosen, the city then would be able to set its costs and try to start negotiations with the federal and provincial governments to get the money to start building.

A critically important document is released Friday in deputy city manager Nancy Schepers’ memorandum on the affordability of the transit system.

The first phase of the project has been estimated at $1.8 billion, including a $600-million tunnel. But that number is a high-level planning estimate. The detailed numbers coming from environmental assessment studies are what officials need before commitments are made.

In total, the city’s plan is to spend about $5 billion on transit until the system is built in 2031. City officials have acknowledged that one of the major risks of their transit plan is the possibility that other governments won’t contribute as much as is needed.

City officials are this week to discuss various related matters as well, such as: a 10-year plan for managing the new system, which feeds suburban bus service into the central rail corridor; a 2010 marketing plan for OC Transpo; what the city’s transit budget for the next year will be; and how high transit fares should be set for the coming year.

© Copyright (c) The Ottawa Citizen
Reply With Quote
     
     
  #2537  
Old Posted Oct 20, 2009, 11:00 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
another bad decision.
__________________
Francois
Reply With Quote
     
     
  #2538  
Old Posted Oct 21, 2009, 12:40 AM
RTWAP's Avatar
RTWAP RTWAP is offline
Registered User
 
Join Date: Oct 2009
Posts: 528
I'm disappointed, but I'm going to try and keep an open mind until I've had a chance to read the report and review their rationale.
Reply With Quote
     
     
  #2539  
Old Posted Oct 21, 2009, 1:51 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,632
Quote:
Therefore future extensions of the rail corridor into outlying communities would allow the rail cars to run at road level, if necessary.
Finally a moment of logic from city hall.
Reply With Quote
     
     
  #2540  
Old Posted Oct 21, 2009, 4:57 AM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Quote:
Originally Posted by bradnixon View Post
Do we really want to get into all of this again? This is exactly what lrt's friend and waterloo were referring to when they said that FOTO had hijacked transit expansion in Ottawa.
People keep raising how the demise of N-S LRT was some sort of great disaster. It wasn't, for the multitude of reasons I mentioned. Hundreds of millions could have been saved. Downtown could have been fixed with these savings. At any rate, we still have $800M+ available that we otherwise wouldn't have to put towards making real improvements to transit of the kind that N-S LRT couldn't hope to achieve.

Quote:
Dado, are you an engineer? Do you not think that some of the things you mentioned above (i.e. grade separations, bridge replacement, rail guage, etc.) were considered by people with expertise and were in the plan for a reason?
Not an engineer, no. Unfortunately we have a tendency here to regard what engineers say as some sort of gospel. Andy Haydon says that light rail uses a different gauge (width between rails) than mainline railways. Is that true? Of course not. But will people believe that? Yep, because Andy Haydon is an engineer. I've seen engineers do "planning". They don't apply their engineering expertise to most of it. They take decisions based on their own view of things, not because of some objective or considered analysis. The engineering is limited to making sure things are possible, not whether they're desirable. The worst part is that they then go and pretend (perhaps even believe) that it was objective. In short, their education hasn't prepared them to do planning because they've never been taught to question their own assumptions.

Anyway, all these things were in because of this. It's clear from reading the EA that not doing many of these things wasn't even considered. They can barely conceive of doing it any other way.

Quote:
It's ridiculous to list things like the weight of the rail among the "major flaws" of the plan.... it seems like the overall benefits of increased transit ridership were ignored by FOTO on account of some disagreements regarding specific technical details.
Some are less major than others, granted, but the rail weight is just plain bizarre. It's 30% higher than what is used in other light rail systems, or even heavy rail metros for that matter. That's 30% more steel, or more than 2.8 million lbs (1.3M kg) - yes, million - of extra steel over the entire line. That's wasteful, whichever way you want to look at it. And that doesn't even factor in the fact that there's usable track in place anyway, which means that an entire track for about 1/2 of the project length was unneeded.

Quote:
The phrase "not seesing the forest for the trees" comes to mind.
The reasons for not supporting N-S LRT constituted an entire forest.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:46 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.