Quote:
Originally Posted by NucksFanInVan
And the more important question (to me): if it's not the 18 proposed by InTransit for peak period service, why not??? It's stupid to hold back more than the required stand-by capacity when we've got packed trains and pass-ups.
|
I have a feeling that adding more trains isn't as flexible as SkyTrain, as we've got a private operator. InTransitBC also requires week in advance warning for additional trains for special events; for Translink's SkyTrain, they could probably do this within a day. Service levels are determined by the contract or contract amendments.
There's also the issue of cost and profits. For instance, it doesn't hurt them if the same amount of passengers riding the train get on even after waiting 1 or 2 trains before being able to get on. Put in more trains so that passengers can get on the first train that arrives might be declared as "excessive capacity". Basically, they'll try to cram on as many people they can into one train, and with less trains it reduces power and maintenance costs. That's basically why frequency is so low for late-night service.
That's just what I think that is happening.