It's all come together pretty good. Apparently there is a a slight issue with the wire guardrail setup they have though. Behind the mesh they have three cables strung between each column to act as a guardrail and the top one is aprroximately 2-3 feet off the ground. Just before it was opened, one of the contractors backed his truck into a spot along the outer wall and becasue it was a friday he was in a rush to leave. So he pulled out of the spot, but unknown to him he backed up far enough so his trailer hitch got snagged under one of the cables. Apparently they had some give but once he let off the gas it pulled him right back. I'm not sure if they've put up signs for this yet.
Also, while I was working there I had herd rumors that the final design called for a new return road to be built that would connect up to the area by the Petro Canada. Yesterday I was looking at the website for the company that did the design work and came across this:
Source