Quote:
Originally Posted by 65MAX
Unfortunately, it's not that easy. First, you can't close Park between Morrison and Yamhill because all of the loading docks for Nordstrom and PAW are there. Also, even if you could, that's not enough to accommodate 4-car trains. You'd have to also close Ninth, but that would cut off ALL vehicular access to PAW. On top of that, with all other stops on Morrison and Yamhill closed, this stop suddenly becomes the most crowded stop in the entire system. There is simply not enough sidewalk capacity to handle the masses of people that would have to use that stop.
|
Exactly. Although if you really wanted to do it, you could just make some of those streets ped-only, like in Europe. However, since the MAX is very similar to the S-Bahns of Germany, they usually run them in elevated or subway lines downtown (and the trains are 2-3x longer as well).
I didn't say it was the best way, just the cheapest.
I personally think that Trimet will just let the MAX get super crowded, as nobody here in Portland wants to spend serious bucks on big-ticket items. We really don't have that bad of traffic, in my opinion, to justify a Seattle or SF like transport project... YET. The suburbs, on the other hand, have some really gnarly traffic on the freeways.
Quote:
Originally Posted by JordanL
Portland's subterranian areas downtown are VERY old...
Building the new Transit mall disrupted sewer lines... what do you think tunnelling a subway would do?
It would be VERY expensive...
|
Bored tunnels downtown would have to be deep enough to go under the river and I-405, so they would likely be deeper than the sewer lines. Unfortunately, the Big Pipe project, which is ~130' deep, would likely pose a serious issue.