↑ Even is the rail cars were reconfigured to allow movement between cars, etc. the train, itself, cannot block a downtown intersection.....fire and police codes. With the short blocks the only way you will be able to have longer trains downtown is to go underground.
some of these corridors don't make a lot of sense to me. the ones that do are the ones we nerds always bring up. Some seem to duplicate current service - maybe they would make sense in the distant future, but not yet: 32 (tv hwy), 17a (sunset). others - 54 (columbia blvd), 43 (us 30), 16b (gresham-damascus), 28b (205 from o.c. to tualitin) are very far away from the urban core or don't really go anywhere near current/planned population centers as to make me wonder about their viability also.
note also 11T - a tunnel from burlingame to downtown.
↑ Even is the rail cars were reconfigured to allow movement between cars, etc. the train, itself, cannot block a downtown intersection.....fire and police codes. With the short blocks the only way you will be able to have longer trains downtown is to go underground.
Exactly, and really the cheapest option the city would have over tunneling downtown or trying to reconfigure the streets to handle longer trains, it would be better just to run more trains.
Which, if I remember correctly, the only issue with that would be the Washington tunnel. Isnt there something about having only one train in each half of the tunnel at a time?
Before someone starts spending billions, let's consider what can be done with what we got.
However, according to Trimet's own studies, they are almost at the maximum frequency for trains downtown and once the Green line opens, there really won't be anymore expansion possible. At peak they already have trains backed up all through downtown and the bigger problem is that all it takes is something to block the tracks (traffic, accident, etc) and the entire system could grind to a halt.
The cheapest option would be just to close Park ave and move the downtown stop between Broadway and 9th. That way they could accommodate 4-car trains.
Portland's subterranian areas downtown are VERY old...
Building the new Transit mall disrupted sewer lines... what do you think tunnelling a subway would do?
It would be VERY expensive...
Building the new Transit mall disrupted sewer lines... what do you think tunnelling a subway would do?
↑ Even is the rail cars were reconfigured to allow movement between cars, etc. the train, itself, cannot block a downtown intersection.....fire and police codes. With the short blocks the only way you will be able to have longer trains downtown is to go underground.
Unfortunately, it's not that easy. First, you can't close Park between Morrison and Yamhill because all of the loading docks for Nordstrom and PAW are there. Also, even if you could, that's not enough to accommodate 4-car trains. You'd have to also close Ninth, but that would cut off ALL vehicular access to PAW. On top of that, with all other stops on Morrison and Yamhill closed, this stop suddenly becomes the most crowded stop in the entire system. There is simply not enough sidewalk capacity to handle the masses of people that would have to use that stop.
Portland's subterranian areas downtown are VERY old...
Building the new Transit mall disrupted sewer lines... what do you think tunnelling a subway would do?
It would be VERY expensive...