Quote:
Originally Posted by ThatGuy
Maybe that is why West Virginia is still so poor... hahaha
To me, the problem with the southern bypass being a toll road is that the road isn't NEEDED, it would be nice to have but no real NEED.
Now, the city or state may think that putting in a new road to south Hville will spur new growth down there or across the river. If that is their desire then they city or state should pay for the road since they will recoup the cost in increased tax revenue from that growth.
|
Wow, 1950's thinking still exists
From Senator Shelby's office
Patriot Parkway (Southern Bypass) – $4.7 million
The Patriot Parkway will run 15 miles through Redstone Arsenal from I-565 to Memorial Parkway. The Parkway will provide a bypass for through travel around downtown Huntsville and improve overall access to Redstone Arsenal.
“As Redstone prepares for the nearly 10,000 jobs expected from the BRAC decisions, it is essential for the City of Huntsville to expand their infrastructure to meet the demands of their growing population,” said Senator Shelby. “An influx of daily commuters this large will greatly change the traffic patterns in the Huntsville area, and it is important that we make every effort in preparation to ease potential traffic issues in the area.”
and more from toll roads news from 2007
Alabama is moving to accelerate construction of a Southern Bypass around the Redstone Arsenal in Huntsville with tolls. URS has been selected to do a traffic and revenue study to assess the feasibility of the proposed tollroad.
Steve Dinges, director of long range planning at the Huntsville plan organization says the HSB Bypass is fully permitted and no longer faces significant opposition. The major environmental challenge was getting acceptance of the highway's handling of wetlands.
Nearly a third of its length or 7km (4 miles) go through swamps of the Tennessee River. They will be built on bridge structure to protect the wetland.
Traffic modeling suggests point-flows of up to 80k, so the road will all be at least 3+3 lanes with some segments 4+4 lanes.
The road serves:
- general east-west connectivity across the south of the region
- some north-south movement relieving US231 Memorial parkway
- improved access to Redstone Arsenal
- as a portion of future I-22 in planning Atlanta GA-Huntsvillle & Decatur AL- Memphis TN
Construction cost was estimated about two years back at $600m but may now be closer to $700m due to inflation. Land costs are small because so much is within Redstone Arsenal and is being donated. Overall project however seems likely to be in the $750m to $800m range, Dinges agrees.
The HSB bypass is about 90 lane-miles (146 lane-km) or $8.9m/lane-mile, $5.3m/lane-km based on $800m all-up cost.
Other priorities in the area are upgrade of US231 to full expressway standard by completing grade separations and frontage roads, and a northern bypass or belt route.
Population of the Madison Co AL (90% of the Huntsville area) is approximately 300k and projected to be 345k in 2015 and 372k in 2030. The Decatur area to the west is almost a twin city and in 2000 the Census MSAs of Huntsville and Decatur combined was 488k
The route of the future Memphis/Huntsville/Atlanta Expressway which will use the Southern Bypass