Quote:
Originally Posted by Lighthouse
^ I believe that was the original plan for the line back around 1999. I'm not sure why they didn't go through with it (funding?). I'm actually for that alignment, you get a good mix of everything: speed, capacity, and street presence of transit plus i would assume that it won't cost as much as having it underground all the way to ubc
|
That's some nice dreaming there....fact is, the region needs a high-speed, high-capacity rail backbone and that's SkyTrain.
The Millennium Line takes something like 30 mins to travel from end to end, I'm quite positive if it were LRT it would take something like 50 minutes.
As for Central Broadway to UBC, underground SkyTrain from VCC to UBC would take about 15-20 mins. With LRT, it would be a
marginal improvement over the existing 99 B-Line at 35-45 mins. And I can assure you, reliability and speed (not the number of stations or the whole street presence thing) is the key factor in attaining ridership.
And about "street presence", I could care less about that. What matters is the transportation infrastructure iteslf: getting you from point A to point B. Fools like you would sacrifice the transit infrastructure itself for "street presence"....while the end product would be a trolley with steel wheels or an electrified B-Line.
You may save a bit now by building LRT, but I can assure you everyone will regret it when there's a marginal difference between it and the 99....and we'd definitely regret it long into the future when the thing is at capacity.
Consider that ridership estimates in 2002 for SkyTrain from VCC to Arbutus and Rapid Bus from Arbutus to UBC were a combined total of 150,000/day. This study was made before the U-Pass era, before all the other transit improvements, before the Millennium Line's ridership started to kick off, and it didn't consider the ridership from the Canada Line. I wouldn't be surprised if a study on SkyTrain from VCC to UBC estimated ridership levels to be 200,000/day (consider that at the very, very earliest, the project would be completed in 2014).
An LRT from Commercial to UBC would be at capacity on the day it opens.
And just for comparisons sake, the Expo and M-Lines together bring in 250,000 riders a day today.
LRT belongs elsewhere in the region in less dense/busy corridors, not along the UBC corridor and certainly not with the Millennium Line - they went with the right technology.