I agree that the Richmond corridor is not the same as the Surrey corridor and won't ever have the same capacity demands - it lies on a flood plain, is bounded by the ALR, and isn't a core centre on the LRSP.
Quote:
Originally Posted by ravman
... i am worried about NOT meeting those targets....
|
But even if the line were not a P3 - we'd still be paying for it - it would be called an operating loss, not a payment.
WRT frequency of trains -
I guess the question is whether they can turn around a train on the YVR branch and on the Richmond branch so that
when they return to Bridgeport they are spaced 3 minutes apart at Bridgeport to achieve the 90 second combined service north of Bridgeport. i.e. can they make up the delay (caused by the single tracking) on the remainder of the YVR or Richmond branch to achieve the 3 minute separation at Bridgeport.
Remember that every second train at Bridgeport in the a.m. rush will be practically empty, because it'll be coming from the airport - that is probably a significant passenger load difference than the combined M-Line / Expo Line passenger loadings.