HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #4141  
Old Posted Nov 19, 2008, 10:23 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,027
Remember mr. x it is not the size that counts, but how you use it. I actually believe this line will be sufficient in capacity for a good time to come given the corridor it is servicing, especially with the addition of c-cars. People here have to remember the tricks of photography, in the photos posted above the angle makes the trains look a lot shorter than they are than if you were standing there personally. PS i also like the design of these cars.
     
     
  #4142  
Old Posted Nov 19, 2008, 10:23 PM
vango vango is offline
Registered User
 
Join Date: Sep 2008
Posts: 77
Maybe the Canada Line will be known as ToyTrain!
     
     
  #4143  
Old Posted Nov 19, 2008, 10:25 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,124
a tiny train for a tiny city

a perfect match
__________________
belowitall
     
     
  #4144  
Old Posted Nov 19, 2008, 10:25 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,027
Again people on here are so funny, these trains a lot larger than the two car Mark 2 trains, so if these seem like toys than sky-train must be micro-machines.
     
     
  #4145  
Old Posted Nov 19, 2008, 10:26 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by Metro-One View Post
Remember mr. x it is not the size that counts, but how you use it. I actually believe this line will be sufficient in capacity for a good time to come given the corridor it is servicing, especially with the addition of c-cars. People here have to remember the tricks of photography, in the photos posted above the angle makes the trains look a lot shorter than they are than if you were standing there personally. PS i also like the design of these cars.
Maybe, maybe not.....i wouldn't mind these train lengths and current platform lengths if i knew the platforms were expandable to much greater than 50-metres.
     
     
  #4146  
Old Posted Nov 19, 2008, 10:35 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,027
Well i am sure in 30 years or so if the demand is there, they will make 80 or 100+ meter platforms. In fact when that time comes these 40/50 meter platforms will give good reason in a few decades to do a complete overhaul renovation of the line, which is a good thing, because then it will be modernized with the current times. Sy-train was built with 80 meter platforms and only 2 decades later the plan is to do the same here, big extensions and a complete overhaul of the entire line. I am really excited for this to happen because it will be as if we are receiving an entire new line again.
     
     
  #4147  
Old Posted Nov 19, 2008, 10:40 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,301
That's exciting! I'm assuming just the cut and cover part is ready for testing at this time, but we're inching closer to completion!



I crammed a bunch of "passengers" into a CAD drawing of a Canada Line train and I got 47 seated + 183 crush load standees = 230 very close and personal passengers.
     
     
  #4148  
Old Posted Nov 19, 2008, 11:04 PM
vango vango is offline
Registered User
 
Join Date: Sep 2008
Posts: 77
Just wondering if InTransitBC has ever stated how much more it would have cost to excavate the additional space for expandable platforms?
     
     
  #4149  
Old Posted Nov 19, 2008, 11:17 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,124
by the time it would be needed they will have a new line to take the load of the old one
__________________
belowitall
     
     
  #4150  
Old Posted Nov 19, 2008, 11:30 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,301
Quote:
Originally Posted by vango View Post
Just wondering if InTransitBC has ever stated how much more it would have cost to excavate the additional space for expandable platforms?
Lol this is a P3 project. Think of the builders as condo developers... they build the system as cheap as possible that meets the RPF, they sell it to the province, and run with it. So like a condo stuck with electric baseboard heaters, plastic water piping, and back in the 90s subpar building envelopes that cost a fortune to fix, we are stuck with 50m platform lengths.

I remember back in 2003 when they were going to use skytrain based technology and build the stations at 105m lengths to begin with but when they brought in the P3 format all they said was carry so and so passengers per hour and get from Richmond and Airport to Waterfront in less than 30 minutes. Canada Line meets/exceeds those requirements. At least there is the provision to increase frequency a bit and add a third car.
     
     
  #4151  
Old Posted Nov 20, 2008, 7:58 PM
vango vango is offline
Registered User
 
Join Date: Sep 2008
Posts: 77
The P3 specs could have included expandable platforms (to 100 metres or more). Guess we'll never know how much this would have added to the total cost.
     
     
  #4152  
Old Posted Nov 20, 2008, 8:30 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by vango View Post
The P3 specs could have included expandable platforms (to 100 metres or more). Guess we'll never know how much this would have added to the total cost.
50-metre platforms expandable to 80-metres would have been enough for decades and decades and decades.

I believe platforms longer than 50-metres would require tunnel boring along the entire route rather than the shallow tunnels of cut and cover.
     
     
  #4153  
Old Posted Nov 20, 2008, 9:07 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,027
Ok, people are getting annoyed with my comments about the credit crisis, well i am getting annoyed with the pessimism about this project. Personally i think it will be large enough to handle the people traffic along this corridor for the next few decades. I think they are good looking trains, and decent looking stations. This is a fantastic addition to the Vancouver transportation network. In 30 years or so, when a major upgrade is needed, so be it, we will probably then lengthen the stations to a 100 meters or so. I think this is good because instead of just having punch out walls and having a 30 year stations with longer platforms we will have entirely new renovated stations.

I am very happy with the Canada line, and i am going to be the first one to ride it on inauguration day. If you guys are so upset with it, then don't ride it. It meets/ exceeds the requirements the government asked for. Train lengths are only one piece of the puzzle. We can have 2 car trains arriving every 1.5 minutes, or 6 car long trains on 120m platforms that arrive every 4.5 minutes, which is very common in other cities, which equals the exact same ridership!
     
     
  #4154  
Old Posted Nov 20, 2008, 9:14 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,798
Quote:
Originally Posted by mr.x2 View Post
I believe platforms longer than 50-metres would require tunnel boring along the entire route rather than the shallow tunnels of cut and cover.
That's my guess too - at the existing depth and locations lengthening platforms would have steepened the grade between stations, especially in Cambie Village. So to avoid those steep grades, the stations would have had to be deeper than they are (i.e. necessitating a bored tunnel) - meaning not only more excavation costs at station sites, but additional concrete, escalators, etc. for the stations themselves to get down to those depths. In addition, 33rd Ave. future station would be too deep to be economically built in future.

SNC Lavalin came up with some innovative thinking on this project to meet the specs at relatively low cost (i.e. short platforms and tunnel under roadway, not under median).
     
     
  #4155  
Old Posted Nov 20, 2008, 9:31 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,165
Quote:
Originally Posted by Metro-One View Post
Ok, people are getting annoyed with my comments about the credit crisis, well i am getting annoyed with the pessimism about this project. Personally i think it will be large enough to handle the people traffic along this corridor for the next few decades. I think they are good looking trains, and decent looking stations. This is a fantastic addition to the Vancouver transportation network. In 30 years or so, when a major upgrade is needed, so be it, we will probably then lengthen the stations to a 100 meters or so. I think this is good because instead of just having punch out walls and having a 30 year stations with longer platforms we will have entirely new renovated stations.
     
     
  #4156  
Old Posted Nov 20, 2008, 10:03 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by Metro-One View Post
Ok, people are getting annoyed with my comments about the credit crisis, well i am getting annoyed with the pessimism about this project. Personally i think it will be large enough to handle the people traffic along this corridor for the next few decades. I think they are good looking trains, and decent looking stations. This is a fantastic addition to the Vancouver transportation network. In 30 years or so, when a major upgrade is needed, so be it, we will probably then lengthen the stations to a 100 meters or so. I think this is good because instead of just having punch out walls and having a 30 year stations with longer platforms we will have entirely new renovated stations.

I am very happy with the Canada line, and i am going to be the first one to ride it on inauguration day. If you guys are so upset with it, then don't ride it. It meets/ exceeds the requirements the government asked for. Train lengths are only one piece of the puzzle. We can have 2 car trains arriving every 1.5 minutes, or 6 car long trains on 120m platforms that arrive every 4.5 minutes, which is very common in other cities, which equals the exact same ridership!
It's literally impossible to extend the platforms beyond 50-metres, as reasoned by officedweller above. 100-metre platforms would require the entire tunnel be dugged up to have deeper tunnel depths in order to adjust grades necessary for longer platforms.

I'm definitely excited about the new line, but I do believe in building it right the first time and in this case allowing future expansion. The majority of the platforms in 2009 will be 40-metres long, marginally longer than the length of two articulated buses put together (add in a SUV). Those platforms that are 40-metres will be expandable to and only 50-metres.

You mention how we'll get a "new line" with major renovations and platform extensions in 30 years. That's the case with the Expo Line, which will cost more than $3-billion to complete (and that's for a mainly elevated line). But the difference with the Expo Line is that the planned platform extensions and station renovations were part of the original design for the line - able to be expanded from 80-metres to ~110-metres. Nothing stands in the way of this platform extension: the grades allow it, the track is straight enough, and for the underground stations nothing stands in the way (i.e. tunnel fans).

With the Canada Line, you've got electrical rooms and tunnel fans on the ends of each station. That's on top of all the grading problems with the tunnel, curved tunnel sections, etc.



If the Canada Line was built with 50-metre platforms today and was expandable to 80-metres, that would be a much different story. It would be like the Expo Line in that case. I don't think any of us is calling for super long platforms from the get-go, we just want a much greater future allowance for lengthening.



Quote:
It meets/ exceeds the requirements the government asked for.
InTransitBC has met the requirements barely, hardly exceeding them. The line doesn't even have a capacity of 15,000 pphpd as agreed upon in the contract.....it needs the 10-metre platform extension (and more trains/cars) for that to happen. With the 20 trains we have right now, the max. capacity is something like 8,000-9,000 pphpd......and which begs the questions: who will be responsible for paying the 10-metre platform extension? or the purchase of additional vehicles???




And about the Arbutus corridor, a parallel line would help reduce some of the congestion on the future Canada Line congestion - but it's not going to be the solution.

Frankly, the Liberal government has digged us into a hole on this one.....a very deep hole with no ledges for climbing out of.
     
     
  #4157  
Old Posted Nov 20, 2008, 10:15 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,027
First of all, nothing is impossible, I hate it when people say impossible, and second of all lots of subways have curved stations so that would not be a problem. Also the same people will be buying the new cars and extensions in the future as they would be right now So stop your bitching because it ain't going to change anything!
     
     
  #4158  
Old Posted Nov 21, 2008, 3:12 AM
zivan56 zivan56 is offline
Registered User
 
Join Date: Oct 2005
Location: Vancouver
Posts: 1,207
Just an FYI...the crane has come down at Broadway/City Hall station. Let's get some fresh asphalt now...
     
     
  #4159  
Old Posted Nov 21, 2008, 5:13 AM
ravman ravman is offline
BANNED
 
Join Date: Mar 2008
Posts: 560
Quote:
Originally Posted by mr.x2 View Post

Frankly, the Liberal government has digged us into a hole on this one.....a very deep hole with no ledges for climbing out of.
My reponse:

as for the comment by Metro-One, there will NOT be trains on the CANADA LINE every 1.5 minutes or 90 seconds as they are on the SKYTRAIN! one reason is single-tracking in Richmond and YVR... they will be every few minutes and like several minutes during non-peak time... obviously past bridgeport, the times double as the trains split...
     
     
  #4160  
Old Posted Nov 21, 2008, 5:29 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,027
i am pretty sure they very well can be ever 90 seconds on the main line (especially before the branch). Do you see what you guys are doing? You are encouraging ravman! When this thing opens, it will be a success, and ravman, i wish i could bare you from riding the line forever, but unfortunatly i do not have that power
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:30 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.