According to Beltliner a blog on the C Train extensions costs break down as follows:
http://beltliner.blogspot.com/2008/07/expanding-from-new-model-line-203-phase_16.html
$25 million per KM for surface right of way construction (x3.6km =$90million)
$10 million per Station (x 3 or 4 stations = $30 - $40million)
Total= $130 million
I don't think there is an argument that could convince me that constuction costs are higher in Winnipeg then in Calgary. So we should be able to use $25 mil per km
Now there is still lots missing from this such as the underpass at the fort Rouge rail yards and the bridge closer to downtown. Also there were no train car costs, which are $4mil each compared to approx $1 mil each for regular busses but vehicle costs weren't included in the BRT plan so it's hard to say how many are needed etc.
Also a maintenance yard would need to be constructed. No estimates on that other then $200 million which is what the Aurora yard in Calgary will be but that is suppose to be a huge facility that will service their much larger LRT system for like the next 30 years so I don't know if that's a good comparison to add onto this project.
The point I'm trying to make is that the BRT plan is $138 million and basic costs for LRT are $130 plus bridges vehicles and maintenance yard. So its in the ball park. I understand that those unknows in my equation will put the cost above the BRT but I think it shows that its not some super inflated number that should push LRT out of our consideration set of options for this city.
Any comments or help on trying to pin down a more accurate LRT number would be appreciated. I a simply tired of people putting down LRT because of some unknown mythical super expensive cost. Lets try to get some real numbers and make a decision where we know the costs of both options.