Quote:
Originally Posted by Greco Roman
|
Quote:
Light Rapid Transit (LRT) & the Public Transit System
Studies have been conducted on the relationship between land use and LRT usage. It was reported in the 1992 Transportation Study that in terms of operating costs per passenger, an LRT system was found to be feasible in CBDs with commercial space of 2 million square metres or greater. In 1998, Saskatoon’s CBD contained 541,451 square metres. Clearly, Saskatoon today is not large enough to support the operation of an LRT. However, there may be a need to examine the feasibility of securing abandoned railway corridors or other underutilised rights-of-way for future public transit use. The 1992 Transportation Study concluded that while the need to secure land for future transit corridors is not warranted now, it would be appropriate from a planning perspective to secure abandoned rail lines as there are other possible uses for these linear corridors (i.e., roads, bicycle/pedestrian paths, open space).
The future form of Saskatoon will have tremendous economic and operational impact on the public transit system. The following requirements are important to the future efficiency of
the Saskatoon Transit System.
|
This stuff is a bunch of ifs and maybes. The City has obviously not committed to the smart growth principles in this document anyway, as evidenced by the rampant sprawl in Saskatoon (with token "new urbanist gestures", of course). There is no indication nor requirement they adhere to the transit portion of this document either.
By extrapolating the CBD commercial space requirement of 2 million square meters to the population (from Stoon's current floorspace of 500,000 square meters, a 1:4 ratio), reveals a population baseline of 800,000. But we know cities of 500,000 – 600,000 can support light rail. How long has it taken for Stoon's population to grow from 197,000 to the current 202,000? 15 years? More? So we'll consider LRT 200 years from now...okay, but how is this relevant to Winnipeg?
Furthermore, the document mentions that this acquired rail right of way would serve "public transit" uses, not necessarily light rail. In fact, this rail ROW would make a great busway for BRT, particularly considering Saskatoon already has 4 BRT-lite routes in service.
If you want to suggest other small cities considering light rail, try Victoria. They are actually in the design phase of a light rail line from Downtown to parts west. By the way, the initial section of this project down Douglas Street will be...wait for it...a busway!