Quote:
Originally Posted by CanadianCentaur
Yes, especially to NAIT.
We don't need BRT until we can get LRT. Like you said, an express route system with limited stops and articulated buses like Vancouver's B-Line would be better until LRT comes along.
The city needs more articulated buses, as some routes are incredibly packed these days, particularly during peak periods.
|
Thats what we call BRT in Calgary, helps to build traffic patterns before the line opens. Pretty basic, along one section shares the curb lane with car pools in rush hour, and they can hold green lights or speed the cycle to a new green light. Mondo cheap - I think it was 6 million for the current 'line' including new shelters, bigger bus bays, and the longer buses.
I am glad Edmonton finally decided to give up on BRT as conceived. Especially when so much more money is flowing in, why not build a serviceable system now!
So whats the next line after the Nait line to go in? Is there a line that would exit in the east of downtown as to allow the Nait line to not dead end in downtown?
A line in the general direction of Millwoods would balance out the system without requiring another line running through the downtown tunnel from the west.
Is there a chance the WLRT will not connect into the current SLRT extension and instead have a new line along (probably under) Stoney Plain Road? (with transfers at Grant Mac and Churchill to the other lines)