Quote:
Originally Posted by Coldrsx
Move the airport closer to Edmonton
31.25 %
|
It will be closer as southwest Edmonton develops to it's city limits and i'm sure the county of Leduc is scheming, er i mean planning to develop, south of 41 Avenue SW.
Quote:
Originally Posted by brento79
They'll lose alot of gate during this construction process due to attaching the new terminal to the south terminal. Wonder how they will pull that off.
|
The hammerhead will be built first and then it can be attached by a simple pedway. They will lose 4 or 5 gates at the most (Gates 62-70). The hammerhead and part of the link to the main terminal, from the posted picture itself, look like they can handle at least 7 or 8 gates. I don't think it'll be that big of a problem.