The waits for Intl gates and clearing customs doesn't sound like a good situation. And yes, the delay has cost the Airport. However, this could have been just the opposite of what it is today. When DL went into bankruptcy, there was no clear indication of exactly how ATL's international traffic/route network was going to fare afterwards. Talk is one thing and action is quite another, and thankfully DL talked the talk and walked the walk with building its international presence there. FWIW, I don't think this situation is going to have any bearing on the China route authority. DL is all but a lock for the next award for its proposed service to Shanghai.
Whatever deals and handouts there may or may not have been is beside the point. And who can prove it? The East Terminal will be built. The Consolidated Rent-A-Car Center will be built. And sometime next decade, the South Terminal will be built. It's typical for ATL's projects to come online late, but they happen.
ATL is too much of an economic engine to stop growing! If it does, it's going to begin rippling through potential growth of the metro area. It is one of the primary reasons so many businesses have located there. Virtually no other airport on the planet has service to as many nonstop destinations worldwide. So, speaking on the East Terminal, even if there are delays, that does not constitute cancellation. Working in the field of Airport Management for the last 12-years, including a spell @ ATL, I know that these sorts of situations are not uncommon around the country, and the world.
The terminal at Detroit Metro was delayed due to 9/11. As a result, along with soaring construction costs, it's not as large nor does it have as many gates as originally proposed. If ATL had moved forward with this building, and DL had de-emphasized International traffic there, people would be crying about how much money was wasted building a white elephant of a terminal that wasn't needed and pointing fingers at the same group of people. Basically, the airport can't f-ing win for losing with the crowd of armchair experts and critics down there.
Also, keep in mind that DL, with its position as having the majority of service @ ATL, in essence gets its say as to whether these projects go forward. Most airports have a process in place whereby before issuing debt to finance construction, they must first get MII (majority-in-interest) approval from the airlines. Without DL's support, the projects won't happen. And DL very well may have had a part to play in why it didn't go forward earlier in the decade. Who are we to think we know, without inside info? Regardless, it will be built, just not when most had hoped.
Hiccups are one thing for the airport to experience, and that's what is happening on occasion this summer. A complete meltdown, however, is quite another situation. That is NOT going to happen before action is taken and the situation is eased with expanded space. DL wants and needs the expansion to happen, so that it can continue to grow. And the same goes for AirTran.
Last edited by ATLonthebrain; Aug 2, 2007 at 3:04 AM.
|