Lights finally coming to intersection of Dalewood and Ron McNeil in St Thomas.

https://www.ctvnews.ca/london/article/sa...-dangerous-intersection-in-elgin-county/
Reply With Quote
     
     
  #42  
Old Posted Oct 28, 2025, 6:32 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,442
Heavy equipment now working at Colonel Talbot Rd and to the east towards the future Ron McNeil-Wonderland intersection for Highway 3 extension. Site prep has started.
Reply With Quote
     
     
  #43  
Old Posted Nov 3, 2025, 2:37 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,442
Road and sewer reconstruction in Fingal.

https://www.youtube.com/watch?v=caD-1HGNUSk
Reply With Quote
     
     
  #44  
Old Posted Nov 27, 2025, 4:41 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,442
Reply With Quote
     
     
  #45  
Old Posted Dec 21, 2025, 8:06 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,442
They have made alot of progress with the new road base of the Highway 3 extension from Wonderland/Ron McNeil to Colonel Talbot. Should have no problem completing this phase next year if they don't waste time. Hopefully they start on new Kettle Creek bridge abuttments next year as that will likely be a two year project.
Reply With Quote
     
     
  #46  
Old Posted Mar 18, 2026, 6:38 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,442
Forestry crews have started clearing trees on the next phase of the Highway 3 widening in St. Thomas west of First Street. Lot's of earth moving will be needed to dig out the embankment along the north side. I would think they will be starting on the Kettle Creek bridge abutments this year as well in order to build the new bridge deck next year.

Last edited by jammer139; Mar 19, 2026 at 2:32 AM.
Reply With Quote
     
     
  #47  
Old Posted May 29, 2026, 6:08 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,442
Starting in a small way some utility relocates around the Wellington and Highway 3 intersection. No activity around the Kettle Creek bridge. There doesn't seem to be much urgency in making progress on the widening of the highway.
Reply With Quote
     
     
  #48  
Old Posted Jun 29, 2026, 12:19 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,442
Work on the Highway 3 and First Ave interchange thru St Thomas section to start with closure for over a month.


https://www.ctvnews.ca/london/article/se...will-close-monday-for-more-than-a-month/
Reply With Quote
     
     
  #49  
Old Posted Jul 28, 2026, 10:32 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,442
Ontario Ministers in St Thomas today to kick off twinning of Highway 3 between Ron McNeil and Centennial Ave.

Very little progress this year on the Wonderland to Colonel Talbot phase.

https://www.ctvnews.ca/london/article/hi...mas-to-support-volkswagen-battery-plant/
Reply With Quote
     
     
  #50  
Old Posted Aug 28, 2026, 11:36 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,442
The new Wonderland and Highway 3 intersection is moving slowly with alot of work to complete. They are still working on the overpass of the railway tracks to the west. They have poured the concrete curbs of the new roundabout at Colonel Talbot and the Highway 3 bypass as well as installing new light poles.
Reply With Quote
     
     
  #51  
Old Posted Aug 30, 2026, 7:42 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,302
The provincial Ministry of Transportation has started an environmental assessment on a new Highway 3 alignment between St Thomas and Aylmer.


From the article below:

The purpose of the study is to identify transportation improvements to Highway 3, including a new arterial road connecting to the St. Thomas Expressway extension, known as Technology Trail, to improve transportation connections between St. Thomas, including Yarmouth Yards, and communities to the east.

Looking at future operating conditions on Highway. 3, with additional population and employment growth in the study area:

• Highway 3 will be over capacity by 2051
• Centennial Road/Highway 3 intersection will be over capacity in both the morning and afternoon peak periods
• Traffic signals will be required to provide gaps for sideroad traffic to enter or cross Highway 3 (Yarmouth Centre Road and Springwater Road)
• Signalized intersections in Aylmer will be over capacity during peak periods
• Highway 3 traffic will likely shift to other municipal roads

A new corridor (shown in blue on the map) would be routed north of the existing Hwy. 3, with five alternate routes (show in yellow) bypassing the Town of Aylmer.

https://www.stthomastoday.ca/2026/08/12/99024/

https://www.highway3elgineast.ca/documentation.html

Reply With Quote
     
     
  #52  
Old Posted Aug 31, 2026, 1:45 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
Touching grass everyday.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 51,635
Interesting, but I think there are numerous roads in London that have hit capacity long ago (I'm looking at you, Wonderland).

Even Hyde Park Road has atrocious traffic in the evenings (and it was upgraded to four lanes only 10 years ago).
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell). Sweet Loretta fart thought she was a cleaner, but she was a frying pan. (John Lennon)
Reply With Quote
     
     
  #53  
Old Posted Sep 8, 2026, 10:07 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,324
Highway 3 from Highway 4 to Wonderland coming along. Pretty massive rail overpass structure for a rail line I don't recall the last time I saw a train actually use. Roundabout at the west end of the hwy 3 extension at hwy 4 now formed. Bridge abutments and centre pillars almost complete for new overpass at Ron McNeil and hwy 3. I can't recall how Wonderland is supposed to merge into this.







Reply With Quote
     
     
  #54  
Old Posted Sep 14, 2026, 12:41 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,324
And at the other end of St Thomas, work begins on twinning the original highway 3 bypass.

Looking west towards First Ave.



Looking west from Highbury



Looking east past Centennial (Highbury)



Roundabout at PowerCo Parkway and Technology Trail (Highway 3 extension) and also railway underpass for future extension of 3 to Yarmouth Centre Rd.



Railway spur overpass over future highway 3.

Reply With Quote
     
     
  #55  
Old Posted Sep 14, 2026, 3:03 AM
haljackey's Avatar
haljackey haljackey is online now
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,489
Cool drone shots! Thanks for sharing
__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #56  
Old Posted Sep 15, 2026, 2:44 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,442
Looks like paving contractor has started on Colonel Talbot and Highway 3.
Reply With Quote
     
     
  #57  
Old Posted Sep 22, 2026, 9:04 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,442
They have now complete a lane shift on Colonel Talbot north of the new roundabout for the highway 3 extension connection. Suspect they will start working on the other side of Colonel Talbot Rd next.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:44 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.