HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates


Reply

 
Thread Tools Display Modes
     
     
  #41  
Old Posted Aug 22, 2026, 7:19 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,479
Have started pouring some of the 6th floor walls on the south wing of this L shaped footprint building.
Reply With Quote
     
     
  #42  
Old Posted Sep 20, 2026, 2:35 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,479
Still working on the last sections of 6th floor walls and posts. Have started forming for the 7th floor slab on the south wing of this L shaped footprint building.
Reply With Quote
     
     
  #43  
Old Posted Sep 28, 2026, 11:03 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,479
Have poured some of the 7th floor walls and posts now on the south wing of this 11s building.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 2:11 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.