HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #1621  
Old Posted May 28, 2026, 8:29 PM
dougvdh dougvdh is offline
Registered User
 
Join Date: Jun 2017
Posts: 352
Quote:
Originally Posted by zzptichka View Post
What's stopping them from connecting the bridge to the dog park?
Is that even a dog park?

But, yeah, great question. They should be connected.

BTW, there's a big tent set up there right now - obviously some event is happening on the island.
Reply With Quote
     
     
  #1622  
Old Posted May 28, 2026, 10:07 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367
Quote:
Originally Posted by dougvdh View Post

BTW, there's a big tent set up there right now - obviously some event is happening on the island.


https://www.riverkeepergala.com/
__________________
My aerial Ottawa photos on Flickr 📷
Reply With Quote
     
     
  #1623  
Old Posted May 29, 2026, 2:02 AM
Ottawacurious Ottawacurious is online now
Registered User
 
Join Date: Mar 2022
Location: Ottawa
Posts: 560
Quote:
Originally Posted by dougvdh View Post
Is that even a dog park?

But, yeah, great question. They should be connected.
.
The purification plant tried to close down the unofficial dog park a couple years ago. I think it was due to security (safety?) concerns or something.

It wasnt an official park and I dont know if that's changed.
Reply With Quote
     
     
  #1624  
Old Posted May 29, 2026, 1:23 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by Uhuniau View Post
There is some serious under-tapped potential with the bridge and Lemieux Island.
Absolutely. Big resting area with benches and a water fountain. Could even be a good spot for an NCC bistro. Can we just give full control of the City to the NCC?
Reply With Quote
     
     
  #1625  
Old Posted May 29, 2026, 2:38 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,046
Quote:
Originally Posted by zzptichka View Post
What's stopping them from connecting the bridge to the dog park?
I'm baffled by this as well. When there were construction interruptions during the bridge conversion, they even used the route through Lemieux Island as an alternative to the south span when it had to be shut down for concrete pours. Once that detour was no longer needed, the gate was shut again, and shut it has remained.

I don't get it.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #1626  
Old Posted May 29, 2026, 2:42 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,046
Quote:
Originally Posted by Ottawacurious View Post
The purification plant tried to close down the unofficial dog park a couple years ago. I think it was due to security (safety?) concerns or something.

It wasnt an official park and I dont know if that's changed.
It wasn't official, and it was shut down during the construction disruption a few years ago, but part of the reason for the shutdown was to create an official dog park AND a link to the bridge, which is that switchbacked trail mid-island that is still, years later, gated off without explanation.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #1627  
Old Posted May 29, 2026, 2:42 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367
Quote:
Originally Posted by J.OT13 View Post
Absolutely. Big resting area with benches and a water fountain. Could even be a good spot for an NCC bistro. Can we just give full control of the City to the NCC?
Yep, uploading to NCC is the only way to get this done. And it's not because the city won't have the budget. They will take the budget and spend it on new fences, gates and 100 "Do Not Jump" signs.



__________________
My aerial Ottawa photos on Flickr 📷
Reply With Quote
     
     
  #1628  
Old Posted May 29, 2026, 4:08 PM
dougvdh dougvdh is offline
Registered User
 
Join Date: Jun 2017
Posts: 352
Quote:
Originally Posted by Ottawacurious View Post
The purification plant tried to close down the unofficial dog park a couple years ago. I think it was due to security (safety?) concerns or something.

It wasnt an official park and I dont know if that's changed.
It's not listed as a dog park on the official City of Ottawa dog park maps. (https://ottawa.ca/en/recreation-and-park...ecreation/parks/dog-parks/map-dogs-parks)

I think the city ended up doing an official off-leash area at Laroche during that park's reconstruction instead.
Reply With Quote
     
     
  #1629  
Old Posted Jun 17, 2026, 1:26 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Reply With Quote
     
     
  #1630  
Old Posted Aug 13, 2026, 6:48 PM
Horus's Avatar
Horus Horus is offline
I ask because I Gatineau
 
Join Date: Jul 2013
Location: Aylmer (by way of GTA)
Posts: 1,214
This is why we can't have nice things....


https://www.ctvnews.ca/ottawa/article/va...-commanda-bridge-to-cost-230k-city-says/
Quote:
Vandalism on Chief William Commanda Bridge to cost $230K, city says

By William Eltherington

Published: August 12, 2026 at 6:21p.m. EDT


The City of Ottawa says it will cost hundreds of thousands of dollars to fix lighting infrastructure along the Chief William Commanda Bridge after the popular pedestrian path over the Ottawa River was subject to vandalism this week.

Barrie Forrester, section manager of street and community lighting for the City of Ottawa, says the damage requires replacement of electrical wire, ductwork, junction boxes and hand hole covers.

Forrester says the damage “appears to be the result of vandalism and theft” and estimates the cost to replace the stolen infrastructure to be approximately $230,000.

The city didn’t say how long it would take for the repairs to be made.

It follows a similar incident on a pedestrian pathway between the Pimisi and Bayview O-Train stations in LeBreton Flats, where wires were removed from the trail lights last week.

CTV News Ottawa found tape covering the wires along the pathway on Wednesday.

“While the incidents are similar in nature, we cannot confirm whether they are connected or involved the same individuals,” Forrester said.
Reply With Quote
     
     
  #1631  
Old Posted Aug 13, 2026, 7:21 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367
Quote:
The City of Ottawa says it will cost hundreds of thousands of dollars to fix lighting infrastructure along the Chief William Commanda Bridge after the popular pedestrian path over the Ottawa River was subject to vandalism this week.
No it wasn't.

It was reported to the 311 and cops multiple times in the winter. Maybe if the city actually paid attention to these reports and acted on them we wouldn't be in this situation.

The thief was cutting it slowly chunk by chunk over several weeks. I personally reported it once, there were others on Reddit. And they are just finding it out now?
__________________
My aerial Ottawa photos on Flickr 📷
Reply With Quote
     
     
  #1632  
Old Posted Yesterday, 1:21 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
I don't understand how we don't have systems in place to prevent this.
Reply With Quote
     
     
  #1633  
Old Posted Yesterday, 2:15 PM
dougvdh dougvdh is offline
Registered User
 
Join Date: Jun 2017
Posts: 352
Quote:
Originally Posted by J.OT13 View Post
I don't understand how we don't have systems in place to prevent this.
The least expensive deterrent would probably be just keeping the lights on 24-7 there's always 120v (or maybe 347V in this case?) of risk running through the wires. But I think the bridge was particularly vulnerable since it was closed all winter - little traffic and no lights on.
Reply With Quote
     
     
  #1634  
Old Posted Yesterday, 2:26 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by dougvdh View Post
The least expensive deterrent would probably be just keeping the lights on 24-7 there's always 120v (or maybe 347V in this case?) of risk running through the wires. But I think the bridge was particularly vulnerable since it was closed all winter - little traffic and no lights on.
There you go. Make the bridge accessible 24/7/365 as a deterrent to copper thieves. Win-Win.
Reply With Quote
     
     
  #1635  
Old Posted Yesterday, 3:01 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367
Quote:
Originally Posted by dougvdh View Post
The least expensive deterrent would probably be just keeping the lights on 24-7 there's always 120v (or maybe 347V in this case?) of risk running through the wires. But I think the bridge was particularly vulnerable since it was closed all winter - little traffic and no lights on.
I've noticed they have lights 24/7 East of Portage bridge on the Gatineau side. I was surprised lights are still working there, maybe it's helping.

There were (still are?) cameras on the Commanda bridge. Wonder what happened to them.
__________________
My aerial Ottawa photos on Flickr 📷
Reply With Quote
     
     
  #1636  
Old Posted Yesterday, 8:45 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,046
Quote:
Originally Posted by zzptichka View Post
I've noticed they have lights 24/7 East of Portage bridge on the Gatineau side. I was surprised lights are still working there, maybe it's helping.

There were (still are?) cameras on the Commanda bridge. Wonder what happened to them.
I also wonder what happened to the traffic counter.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #1637  
Old Posted Today, 3:00 AM
dougvdh dougvdh is offline
Registered User
 
Join Date: Jun 2017
Posts: 352
Quote:
Originally Posted by Uhuniau View Post
I also wonder what happened to the traffic counter.
Speaking of counters (that one might be battery powered), I've noticed there's a compression line counter installed on Voyageurs Pathway between the William Commanda and the Leamy Creek inlet. It's installed close to the inductive loop counter, so I'm winder if the NCC is finally starting to realize that the inductive loop counters may be significantly undercounting modern carbon bikes and groups of riders.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 3:44 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.