They have now done a traffic shift to the south side over the new culvert while heavy equipment works on the culvert north end east of White Oaks Rd.
Reply With Quote
     
     
  #122  
Old Posted Mar 5, 2026, 12:43 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,293
Bradley Ave east of White Oaks will be closing for a short while as they continue to work on the new culvert. Crews are back at work on the new section of Bradley with utility installations underway.
Reply With Quote
     
     
  #123  
Old Posted Jun 2, 2026, 10:47 AM
Djeffery's Avatar
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,289
May 30







Reply With Quote
     
     
  #124  
Old Posted Jun 2, 2026, 3:37 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,181
Great shots, they are moving along pretty well.
Reply With Quote
     
     
  #125  
Old Posted Aug 2, 2026, 8:04 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,293
They have started pouring the concrete curbs and sidewalks on the west side of White Oaks Rd as well as grading the road base. For some reason they haven't poured the west bound side curbs or sidewalk on the east of White Oaks Rd yet.
Reply With Quote
     
     
  #126  
Old Posted Aug 12, 2026, 11:28 AM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,293
Extension of Bradley Ave to Pack Rd could be 2035 based on current PEC discussion.

https://www.cbc.ca/news/canada/london/co...ubdivision-in-southwest-london-9.7091546
Reply With Quote
     
     
  #127  
Old Posted Aug 12, 2026, 1:03 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,480
Quote:
Originally Posted by jammer139 View Post
Extension of Bradley Ave to Pack Rd could be 2035 based on current PEC discussion.
Any sane person would assume that work on extending Bradley further west to connect with Pack Road would start as soon as the current extension is done. That would make this extension far more useful, provide an alternate to Southdale, providing relief for that road.

Hopefully this turns into an election issue and it's fast tracked. Unlike other construction projects, this wouldn't really cause a disruption since it's a new build. It would also allow Southdale to be widened without too much disruption.
__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #128  
Old Posted Aug 12, 2026, 1:41 PM
MolsonExport's Avatar
MolsonExport MolsonExport is online now
Touching grass everyday.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 51,400
Why has Bradley been built in a piecemeal fashion?

Why are there two Huron streets, when they will never be connected? Likewise for Adelaide Street? It is weird when street names up and die, only to be reborn again "down the road". A great many cities do this...I suppose at one point in time, the plan was to link the disparate parts together.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell). Sweet Loretta fart thought she was a cleaner, but she was a frying pan. (John Lennon)
Reply With Quote
     
     
  #129  
Old Posted Aug 12, 2026, 8:57 PM
haljackey's Avatar
haljackey haljackey is offline
User Registered
 
Join Date: Apr 2010
Location: London, Ontario
Posts: 3,480
Quote:
Originally Posted by MolsonExport View Post
Why has Bradley been built in a piecemeal fashion?

Why are there two Huron streets, when they will never be connected? Likewise for Adelaide Street? It is weird when street names up and die, only to be reborn again "down the road". A great many cities do this...I suppose at one point in time, the plan was to link the disparate parts together.
Those two streets have environmentally sensitive areas between them and will likely never be connected.

A Bradley to Pack connection does not have such restrictions.
__________________
My Twitter

My Simcity Stuff
Reply With Quote
     
     
  #130  
Old Posted Aug 25, 2026, 4:28 PM
TechnicianJ TechnicianJ is offline
Registered User
 
Join Date: Aug 2026
Posts: 1
Paving of the base coat of asphalt began yesterday between White Oak Road and Paulpeel Avenue. Curbs are also nearing completion up to Wharncliffe Road.

Closure of White Oak Road expected next week for two weeks for watermain tie in.

Still expecting end of September for extension opening.
Reply With Quote
     
     
  #131  
Old Posted Aug 26, 2026, 2:00 AM
Pimpmasterdac's Avatar
Pimpmasterdac Pimpmasterdac is offline
Registered User
 
Join Date: Jul 2010
Location: London
Posts: 701
This thread is 10 years old, remember commenting on this in 2016. Glad the end of this very long tunnel is within sight and will be a significant addition to help east-west traffic in the south end. Unfortunately that separate right turn lanes weren't put at White Oak or Wharncliffe Rd as this will cause congestion and bottlenecks at the intersections
Reply With Quote
     
     
  #132  
Old Posted Aug 26, 2026, 11:34 AM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,293
They still have heavy equipment working the banks of the drain on the north side of the culvert east of White Oaks Rd. Still no sidewalk along that section of Bradley has been poured.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:43 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.