Still working on the 2nd floor slab and walls and posts for the west side 9s building. Have been also working on forming and steel rebar for another section of ground floor slab. Little progress on the L1 walls and posts on the east side of the pit where building two is too be built. They still have not removed the mini tower crane that has been packed up.