MP Brijesh Chowta urges Centre to take steps to curb coastal erosion in Dakshina Kannada
Untreated sewage, water stagnation caused fish deaths near Mangaluru
Jalasiri contractors fined Rs 18 lakh for liquidity damages
What are the possibilities of Mangaluru is also losing its lakes like the monstrous city
1. Is there any concrete plan to save us from this probable disaster? Are digitized & published records of all water bodies (lakes, rivers, streams, rajakaluves) along with their boundaries available? Note that New Delhi had
sank due to depletion of ground water 1 2. And also
fresh water flowing from inland aquifers toward the coast creates a natural hydraulic barrier preventing saline water from sea entering land 1 2.
ನಗರದ ಒಡಲಲ್ಲಿವೆ ಬತ್ತದ ನೀರ ಸೆಲೆಗಳು
ಬತ್ತದ ಕೆಂಚನಕೆರೆಗೆ ಅಳಿವಿನ ಭೀತಿ: ಸಿಗಲಿ ಕಾಯಕಲ್ಪ
ಪ್ರದೇಶ ಎತ್ತರ, ಸಮಸ್ಯೆಗಳಿಂದ ತತ್ತರ!
Mangaluru: Water and sanitation challenges in spiritual hub
Samithi to hold massive protest in front of KSPCB over pollution of Phalguni River
Brijesh Chowta seeks permanent solutions to coastal erosion in Dakshina Kannada
Baikampady industries deny role in Phalguni pollution
Nammuralli News18 | ಇತಿಹಾಸ ಪ್ರಸಿದ್ಧ ಕಾವೂರು ಕೆರೆ ಅವ್ಯವಸ್ಥೆಯ ಆಗರ | Mangalore Lakes Turn Deadly
ವಿಷಕಾರಿಯಾಗುತ್ತಿವೆ ಮಂಗಳೂರು ಸುತ್ತಮುತ್ತಲಿನ ಜೀವನದಿಗಳು !
'Ensure uninterrupted water supply, utilise Gram Panchayat funds': U T Khader
ಮಂಗಳೂರು: ನದಿ ಜಾಗವೇ ಒತ್ತುವರಿ, ಒಡಲು ಸೇರುತ್ತಿದೆ ಬಿಲ್ಡಿಂಗ್ ತ್ಯಾಜ್ಯ
Garbage dumping in Kumaradhara River: Fine imposed on tourist vehicle driver in Subrahmanya
Dinesh Gundu Rao pushes fast-track drinking water projects, warns on supply gaps
Minister Orders Immediate Removal of River Encroachments in Sultan Bathery
Case booked for dumping construction debris into Phalguni river in Karnataka
Karnataka minister issues directives on water, health, environment
Treatment plant planned in industrial area to check river pollution
Quote:
|
... the proposed wastewater treatment plant will be constructed at an estimated cost of Rs 39 crore.
|
Who will bear the cost? The government or the polluters? How much fine is collected from the polluters so far?
Thumbe dam water level remains stable; sufficient drinking supply for Mangaluru
Quote:
|
"He added that VJNL has engaged consultants to conduct a pre-feasibility study to explore additional water availability at the Netravathi and Kumaradhara river junction to make up the shortfall of 6 tmcft."
|
~
dumbupole
This move of the state government seems to be more for suppressing growth of DK by looting away its resources rather than for anything useful. Abundant water is there in Tulunadu, deep tech companies & international institutes may soon start moving to Silicon Beach ditching the monstrous region once they become aware of this. The only way sadistic real estate cum political mafia of the monstrous city can stop this is by plundering or ruining Tulunadu.
Western Ghats biodiversity meet raises demands on river conservatio
Quote:
Mangaluru: A major biodiversity conservation conference held on the banks of the Kumaradhara River at Urumbi in Kadaba taluk of Dakshina Kannada district recently has put forth a series of strong demands aimed at protecting river ecosystems and halting environmentally damaging projects across the Western Ghats.
Organised jointly by the Kumaradhara Environment Protection Committee, Save Western Ghats Movement and Vruksha Laksha Movement, the event brought together environmentalists, scientists, activists and local communities. The programme, which included river puja and aarati, turned into a celebratory gathering following the state govt's decision to drop proposed private hydropower projects on the Kumaradhara after sustained opposition for over 14 years.
|
ಮರವೂರು ಅಣೆಕಟ್ಟು: ನೀರಿನ ಮಟ್ಟ ಕುಸಿತ
MCC well prepared to ensure uninterrupted water supply
Minister seeks action for pollution of Guruvayanakere lake
ತುಂಬೆ ನೀರಿನ ಮಟ್ಟ ಭಾರೀ ಇಳಿಕೆ
Thumbe dam water level drops to 4.47 metres, lowest in seven years
Cross bore drilling revives dry wells in coastal Karnataka
ಮಂಗಳೂರು: ಗ್ರಾಮಾಂತರದಲ್ಲೂ ನೀರು ರೇಷನಿಂಗ್
Water level drops at Thumbe vented dam, rationing to begin in Mangaluru from May 4
Biliyur dam has 0.2 TMC of water - Can mitigate the fear of Tumbe dam going dry
Mangaluru requires approximately 2 TMC annually (daily 160 MLD (million litres per day)).
ಆಲಂಕಾರಿಗೂ ಬಂತು ಅಡ್ಡಬೋರು_ ಬತ್ತಿದ ಕೆರೆಯಲ್ಲಿ ಸಮೃದ್ಧ ನೀರು!
Reservoir levels dip sharply as drinking water crisis deepens in Dakshina Kannada
U. T. Khader asks Mescom to provide power connection to drinking water projects without delay
Biggest scam of decade should be this project of 23,000 Cr by KA govt with destroying Western Ghats
District administration slacking in removing construction debris dumped in Phalguni river in Mangaluru
AMR water to be released to Thumbe to avert summer shortage
Quote:
|
Official data as of April 21 showed the water level at Thumbe at 4.7 metres, while the AMR reservoir stood at 18.6 metres. Authorities estimated the available stock would last nearly 22 days.
|
ಎಎಂಆರ್ ಡ್ಯಾಂನಿಂದ ತುಂಬೆಗೆ ನೀರು ನಗರಕ್ಕೆ ನೀರು ರೇಷನ್ ಯಥಾಸ್ಥಿತಿ
Water released from AMR dam to Thumbe; alternate-day supply to continue
What about water at Biliyoor vented dam? Will water from Biliyoor be released to AMR damif needed?
Heavy rain forecast in coastal dists from May 13; IMD issues warning
Heavy rain exposes ill-preparedness of district administration in Mangaluru
So, this was bogus news -
Administration has taken precautionary measures after identifying disaster-prone areas in Dakshina Kannada: DC,
District administration gears up for monsoon, decentralised preparedness in place. The district administration is ill prepared to face monsoon.
AMR dam release boosts Thumbe water level in Mangaluru
Pollution in Karnataka's Nandini river hits centuries-old fish-catching ritual
As the Nandini chokes, an 800‑year‑old Kandevu Jatre ritual struggles to survive in Dakshina Kannada
Puttur_ ಮಳೆಯಿಂದ ಒಳಹರಿವು ಹೆಚ್ಚಳ
Rain Revives Netravathi River, Eases Drinking Water Concerns in Dakshina Kannada
Mangaluru: Netravati River Water Levels Improve After Heavy Rain, Drinking Water Crisis Eases
ಬಾವಿಯ ನೀರಿನಲ್ಲಿ ಡೀಸೆಲ್ ಪತ್ತೆ | Diesel Found in Kavoor Well Water | Udayavani
Diesel-like contamination in well water alarms residents of Balipaguri Road in Kavoor
Steps to be taken to ensure no artificial flooding in Phalguni river: DC
Dakshina Kannada DC assures steps to prevent artificial flooding from Phalguni coffer bund
Phalguni river encroachment at Sultan Bathery to be cleared within 10 days, says DC
Rs 100 crore sanctioned for coastal protection projects - DC
https://eedina.com/karnataka/udupi/skf-industial-training-center/2026-05-24/
ಕೂಳೂರಿನಲ್ಲಿ ದಿಕ್ಕು ಬದಲಿಸಿದ ಫಲ್ಗುಣಿ
ಕರಾವಳಿಯ _ಪಶ್ಚಿಮವಾಹಿನಿ' ಮರೆತ ಸರಕಾರ!
Dakshina Kannada records 14% deficit in pre-monsoon rainfall
ನಗರದಲ್ಲಿ ಬಾವಿ ನೀರು ಕುಡಿಯಲು ಅಯೋಗ್ಯ!
‘ಜಲಸಿರಿ‘ಗೆ ಕಾಯಬೇಕು ಇನ್ನೂ ವರ್ಷ
Quote:
... ಅಡ್ಯಾರ್ನಲ್ಲಿ 125 ಎಂಎಲ್ಡಿ ಸಂಗ್ರಹ ಸಾಮರ್ಥ್ಯದ ₹127.7 ಕೋಟಿ ವೆಚ್ಚದ ನೀರು ಶುದ್ಧೀಕರಣ ಘಟಕ ನಿರ್ಮಾಣಕ್ಕೆ 2024ರಲ್ಲಿ ಅನುಮೋದನೆ ದೊರೆತಿದ್ದು, ಯೋಜನೆ ವೆಚ್ಚ ₹617.22 ಕೋಟಿಗೆ ಹೆಚ್ಚಳವಾಗಿದೆ. ಯೋಜನೆ ಪೂರ್ಣಗೊಳಿಸಲು 2027ರ ಮಾರ್ಚ್ 31ರವರೆಗೆ ಕಾಲಾವಕಾಶ ದೊರೆತಿದೆ. ...
ಪ್ರಸ್ತುತ ತುಂಬೆ ಘಟಕದಿಂದ 160 ಎಂಎಲ್ಡಿ ನೀರು ದೊರೆಯುತ್ತಿದ್ದರೆ, ಹರೇಕಳ ಅಣೆಕಟ್ಟೆ ಮೂಲಕ ಅಡ್ಯಾರ್ ಘಟಕದಿಂದ 125 ಎಂಎಲ್ಡಿ ನೀರು ಲಭ್ಯವಾಗಿ, ಭವಿಷ್ಯದ ಬೇಡಿಕೆ ಪೂರೈಸಲಿದೆ. ಅಡ್ಯಾರ್ನಲ್ಲಿ ನಿರ್ಮಾಣವಾಗುತ್ತಿರುವ ನೀರು ಶುದ್ಧೀಕರಣ ಘಟಕವು (ಡಬ್ಲುಟಿಪಿ) ಕ್ಲಾರಿಫಿಕೇಷನ್ ಮತ್ತು ಫಿಲ್ಟರ್ ವ್ಯವಸ್ಥೆಯನ್ನು ಒಂದೇ ಕಡೆ ಹೊಂದಿರುವ ದೇಶದ ಮೊದಲ ಘಟಕವಾಗಿದೆ. ಹೈ ರೇಟೆಡ್ ಪ್ರೆಷರ್ಗಳನ್ನು ಬಳಸಲಾಗಿದ್ದು, ಮಾರ್ಗ ಮಧ್ಯೆ ನೀರು ಪೋಲಾಗುವುದನ್ನು ಗಣನೀಯವಾಗಿ ತಗ್ಗಿಸಬಹುದು ಎಂದು ಹೇಳಿದರು.
ಪಾಲಿಕೆ ವ್ಯಾಪ್ತಿಯಲ್ಲಿ ಪ್ರಸ್ತುತ ಇರುವ 700 ಕಿ.ಮೀ ಪೈಪ್ಲೈನ್ ಜಾಲವನ್ನು ಉಳಿಸಿಕೊಂಡಿದ್ದು, 1,100 ಕಿ.ಮೀ ಹೊಸ ಪೈಪ್ಲೈನ್ ಅಳವಡಿಸಲಾಗುತ್ತಿದೆ. 19 ಓವರ್ಹೆಡ್ ಟ್ಯಾಂಕ್ಗಳ ನಿರ್ಮಾಣ, 6 ಜಿಎಲ್ಎಸ್ಆರ್ ಹಾಗೂ 7 ಪಂಪಿಂಗ್ ಹೌಸ್ಗಳ ನಿರ್ಮಾಣದ ಜತೆಗೆ ಮಲ್ಟಿ ಜೆಟ್ ವಾಟರ್ ಮೀಟರ್ನೊಂದಿಗೆ ಗೃಹ ಬಳಕೆಯ ಸಂಪರ್ಕ ನೀಡಲಾಗುತ್ತದೆ. ...
|
76% of Jalasiri 24x7 water supply project completed in Mangaluru City Corporation limits
Quote:
Officials briefed media people during a visit to various project sites across the city, including the innovative double-storage water tank at Kodikal, which has a storage capacity of 40 lakh litres.
They said the deadline for completing key components of the project—including pipeline installation, construction of storage tanks, and the water treatment plant (WTP) at Adyar—has been extended until March 2027.
|
Jalasiri project deadline set for August 2027: 71 per cent of work completed
Fish kill along Phalguni: Locals, greens point fingers at pollution, coffer bund
ಮೀನಕಳಿಯದಲ್ಲಿ ಕಡಲ್ಕೊರೆತ ತಡೆಗೆ ಸ್ಯಾಂಡ್ಬ್ಯಾಗ್; ಮರವಂತೆ ಮಾದರಿ ಬ್ರೇಕ್ ವಾಟರ್ಗೆ ಒತ್ತಾಯ
Mangaluru: 2027ರ ಆಗಸ್ಟ್ ಜಲಸಿರಿ ಡೆಡ್ಲೈನ್, ಶೇ. 71 ಪೂರ್ಣ
ನೀರಿನ ಬಿಲ್ ಕೇಳೋ ಅಧಿಕಾರಿಗಳು ಈಗ ಎಲ್ಲಿದ್ದಾರೆ?; ಮಂಗಳೂರಿನಲ್ಲಿ ಕಲುಷಿತ ನೀರು ಕುಡಿದು 100ಕ್ಕೂ ಹೆಚ್ಚು ಜನರಿಗೆ ವಾಂತಿ-ಭೇದಿ
कर्नाटक: किसी को उल्टी-किसी को दस्त…मंगलुरु में दूषित पानी पीने से 100 से अधिक बीमार, निगम की कार्यशैली से आक्रोश
Sewage Leak Suspected Behind Mangaluru's Contaminated Water, 30+ Wells Found Unsafe
Is this the result of not having a democratically elected government at the city corporation?