Old Posted Oct 22, 2025, 9:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,891
Framers appear to be done with the roof sheathing on both townhouse blocks now done. Building wrap is now installed and should see the window and door units installed very soon and also see the roofing contractor installing shingles.
Reply With Quote
     
     
  #22  
Old Posted Nov 5, 2025, 4:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,891
The roofing shingles are now installed and they have nearly finished installing the window unit modules. Lots of work along the street by London Hydro installing new lines.
Reply With Quote
     
     
  #23  
Old Posted Dec 7, 2025, 2:22 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,891
Foundation footings for the west side 5s building are progressing with about 50% now poured.
Reply With Quote
     
     
  #24  
Old Posted Dec 18, 2025, 4:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,891
Looks like they have finished pouring the foundation footings for the west side building and have started forming and pouring the foundation footings for the east side building.
Reply With Quote
     
     
  #25  
Old Posted Feb 4, 2026, 3:45 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,891
Almost done installing the exterior siding on the two townhouse blocks and they have started finishing of the interiors as well. Still working on the foundation footings and walls for the low rise buildings.
Reply With Quote
     
     
  #26  
Old Posted Apr 1, 2026, 7:10 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,891
Wrapping up pouring the ground floor slab on the east side building. Have started installing precast concrete walls on the ground floor of the west building. Old Oaks may be planning to use precast concrete walls and posts for these two 5s buildings instead of form and pour concrete construction. They used precast on the two 8s buildings up on Richmond St.
Reply With Quote
     
     
  #27  
Old Posted Apr 14, 2026, 3:16 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,891
They have started installing modular steel wall panels on the ground floor of the west building. Looks like they plan to use a mix of poured concrete walls and posts, structural steel posts and modular steel wall panels. Suspect they will also use precast concrete floor slabs.
Reply With Quote
     
     
  #28  
Old Posted Apr 21, 2026, 3:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,891
Have started installing precast concrete 2nd floor slabs for the west side building using a mobile crane. Another mobile crane has started installing the modular steel wall panels for the east side building.
Reply With Quote
     
     
  #29  
Old Posted Apr 29, 2026, 8:14 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,891
Have started installing precast concrete walls on the second floor of the west building. Still working on installing the ground floor modular steel wall panels for east side building.
Reply With Quote
     
     
  #30  
Old Posted May 12, 2026, 3:47 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,891
Have wrapped up the 2nd floor steel modular wall panel installs on the west building and the ground floor walls on the east building. Should see 3rd floor precast concrete floor slabs being installed soon on the west building and 2nd floor precast floor slabs on the east building.
Reply With Quote
     
     
  #31  
Old Posted May 20, 2026, 7:26 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,891
Have now installed the 3rd floor precast floor slabs on the west building and 2nd floor precast floor slabs on the east building. Have started installing the 2nd floor precast walls slabs on the east building.
Reply With Quote
     
     
  #32  
Old Posted May 27, 2026, 8:55 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,891
Have started installing the 3rd floor steel modular wall panels on the west building.
Reply With Quote
     
     
  #33  
Old Posted Jun 13, 2026, 11:33 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,891
The 4th floor precast concrete floor slabs have been installed on the west 5s building and some of the 4th floor walls are now installed. The 3rd floor precast concrete floor slabs are nearly finished on the 5s east building.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 3:39 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.