Quote:
Originally Posted by CanadianTalk View Post
Here is a higher-quality version of the updated renderings for the first building currently under construction.

And just a reminder that this will be right at the corner of Highbury and Oxford, and it will be 32 stories.

Very Waterlooian.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell). Sweet Loretta fart thought she was a cleaner, but she was a frying pan. (John Lennon)
Reply With Quote
     
     
  #82  
Old Posted Dec 20, 2025, 4:21 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,894
Looks like the large mobile crane was used to move materials for the tower crane base forming.
Reply With Quote
     
     
  #83  
Old Posted Jan 8, 2026, 4:54 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,894
Working in the pit still for the first tower with excavator working along the north caisson wall and a concrete pump truck being used to pour cement in the bottom of the pit center. Wonder if they intend to move the tower crane from the Centro north tower when they disassemble it here?
Reply With Quote
     
     
  #84  
Old Posted Jan 12, 2026, 4:12 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,894
Old Oaks takes the honour of assembling the first tower crane of 2026 here. At the same time they are still working on removing the tower portion of the crane on the north Centro building.
Reply With Quote
     
     
  #85  
Old Posted Feb 26, 2026, 9:48 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,894
Work on the foundation forming and steel rebar continues on the bottom of the pit for this first 32s tower on the corner.
Reply With Quote
     
     
  #86  
Old Posted Mar 22, 2026, 6:54 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,894
Interesting to see BlackWall Forming sign up on construction fencing for this building.

https://www.blackwallforming.com/
Reply With Quote
     
     
  #87  
Old Posted Apr 26, 2026, 3:04 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,894
It looks like the first 32s building on the corner will only have one level of underground parking. They poured footings and L2 level walls and posts but they have backfilled the spaces with dirt. Suspect they will pour an L1 floor slab on top of that to create an underground level. Interesting engineering design to bury the L2 walls and posts instead of using that level for parking.
Reply With Quote
     
     
  #88  
Old Posted May 16, 2026, 6:08 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,894
Have now poured some of the ground floor slab on the SE corner. Still working on the L1 slab on other sections.
Reply With Quote
     
     
  #89  
Old Posted May 27, 2026, 11:46 AM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,894
Have started forming for some of the ground floor walls and posts on the SE corner. Parking ramp down to the L1 level is now poured and work continues on the L1 walls and posts on the west and NW side.
Reply With Quote
     
     
  #90  
Old Posted Jun 2, 2026, 10:36 AM
Djeffery's Avatar
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,202
May 30

Reply With Quote
     
     
  #91  
Old Posted Jun 2, 2026, 11:57 AM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,894
Nice photo. The NE corner will likely see the ground floor concrete slab poured this week.
Reply With Quote
     
     
  #92  
Old Posted Jun 10, 2026, 3:37 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,894
They have now poured the ground floor slab in the NE corner. Forming starting for ground floor walls and posts in the NE corner. Forming for the ground floor slab has started on the west side. Should see steel rebar going in over the next week and a concrete pour in the next two weeks.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 8:53 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.