Quote:
Originally Posted by bomberjet
I'll try to fix some of the formatting. That text is all copied form the RFP using AI as the RFP is locked and unable to copy directly from the PDF.. Note the RFP is 314 pages long lol
In general. Either on existing alignment, or a couplet with WB lanes going north of Barren Lake.
All interchanges seem to be compact diamonds. Possibly move the Falcon interchange location to Freedom Road.
Throughpass for Lyon's Lake access. Not sure yet about the south end of Barren Lake cottages.
|
Do you have the link? I went to M.T.I.’s website and I couldn’t find the PDF there.