  #21  
Old Posted Sep 18, 2025, 1:28 AM
Doubleu1117 Doubleu1117 is offline
Registered User
 
Join Date: Aug 2015
Location: New York
Posts: 197
38 and 39 GPE on their way down. Maybe 3 floors left standing

Reply With Quote
     
     
  #22  
Old Posted Sep 18, 2025, 2:11 AM
mrnyc mrnyc is offline
cle/west village/shaolin
 
Join Date: Jul 2006
Posts: 15,125
oh wow its happening now.

this building is going to be a real interesting beauty.

i’ll have to check it out when the weather gets cooler and a stop in mollys is warranted.
Reply With Quote
     
     
  #23  
Old Posted Jan 26, 2026, 11:49 PM
Doubleu1117 Doubleu1117 is offline
Registered User
 
Join Date: Aug 2015
Location: New York
Posts: 197
https://newyorkyimby.com/2026/01/earthwo...ark-east-in-gramercy-park-manhattan.html

Quote:
Earthwork Underway At 38 Gramercy Park East in Gramercy Park, Manhattan

Excavation is underway at 38 Gramercy Park East, the site of a 20-story residential building in Gramercy, Manhattan.
The project will become the largest building of its kind constructed in a century in the area surrounding the nearly 2-acre private park. SLCE Architects as the architect of record for the property, which alternately addressed as 146 East 21st Street and bounded by Gramercy Park East, East 21st Street, and Third Avenue.

The six former occupants of the property have been razed and cleared since our last update in April 2025, when demolition preparations were just getting underway. Crews have begun to excavate the L-shaped plot and are using piling machines to prep for the forthcoming foundations. Digging should proceed over the next few months, followed by the formation of the substructure later this spring. YIMBY expects the superstructure to emerge above street level sometime during the summer.
The axonometric diagram of the building posted still looks consistent with that earlier rendering, fingers crossed we are still getting that great design.
Reply With Quote
     
     
  #24  
Old Posted Mar 5, 2026, 7:10 PM
mrnyc mrnyc is offline
cle/west village/shaolin
 
Join Date: Jul 2006
Posts: 15,125
hard at work in the pit yesterday —
very much looking forward to this one —



Reply With Quote
     
     
  #25  
Old Posted May 11, 2026, 5:45 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Great State of NJ
Posts: 49,333
Reply With Quote
     
     
  #26  
Old Posted May 11, 2026, 5:54 PM
ChiND's Avatar
ChiND ChiND is online now
Registered User
 
Join Date: Aug 2023
Location: Sheboygan
Posts: 2,496
Nice photos, Chris!
__________________
24601
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump



Forum Jump


All times are GMT. The time now is 1:41 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.