Drone footage around a few construction sites in Ottawa. It starts with Odenak, our twin red ombre towers at 31 floor and the new second tallest in Ottawa-Gatineau at 36 floors. 00:00 to 2:34
Drone then goes to Adisoke, the new Otatwa Central Library + National Archives. 2:35 to 4:02
Then it goes to the West Memorial Building that's near the completion of the years long reno. Once those renos are complete, the Supreme Court will move in while it gets its own rehab. 4:35
Goes back to Adisoke, and then the new district heating and cooling plant and park. 6:08 to 7:50
There a return to the West Memorial Building, and then Relevé, our new curvy towers from Main+Main. 10:35 to 11:00
The last building is the Renaissance Marriott, which will house the hotel from floors 1 to 16, and residential apartments on floors 18 to 35, with a shared amenity floor on level 17 that features a pool and hot tub (I think we can see them being formed on this drone footage). A 36th floor with have mechanical and residential amenities. This tower will be the tallest in the traditional Downtown.
Drone flies around everything again during the rest of the video.
• Video Link