Quote:
Originally Posted by phil235 View Post
The arenas in question are City of Ottawa facilities. Was just answering the question asked above.
At least in public buildings, there are employees paid to keep it reasonably clean including the washrooms. There is also staff milling around to minimize bad behaviour. Stand alone public washrooms are much more problematic because of the lack of supervision.

I read about the public washroom on O,Connor at Sparks. The neighbouring bank refused to build a new building until the washrooms were closed. This sort of thing was a problem even in 1929. Two pieces of street art likely cover the old entrances.
Reply With Quote
     
     
  #9042  
Old Posted Apr 20, 2026, 2:51 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,091
Quote:
Originally Posted by J.OT13 View Post
I hope RTG is dinged a few bucks every time the washrooms are closed, or even the water fountains are not functional.
Does this include the water fountain(s)? that have been permanently decommissioned?
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #9043  
Old Posted Apr 20, 2026, 5:29 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,673
OC Transpo temporarily cancels dozens of bus trips a day this spring

By Josh Pringle, CTV News
Published: April 20, 2026 at 6:35AM EDT


OC Transpo is proactively cancelling dozens of bus trips each workday this spring due to longer travel times and an “increase in fleet requirements,” as the transit service rolls out the new spring schedule this week.

The transit service proactively cancelled 255 trips each weekday between early January and April as it dealt with a shortage of buses due to an aging fleet, a backlog in maintenance work on buses and delays in the arrival of new buses.

With the new spring schedule now in effect, OC Transpo is cancelling 279 trips each weekday for the spring schedule.

“Increases in run times on some routes and an increase in fleet requirements have resulted in a temporary decrease of 279 trips each weekday for the spring schedule,” Rick Leary, new OC Transpo general manager, said in a memo to council last week.

“Work to further increase bus availability continues, and OC Transpo will increase the number of trips being delivered as it improves.”

Of the 279 bus trips proactively cancelled, 21 trips are on Route 5, 11 trips on Route 41 between Hurdman and Blair stations, 10 trips on Route 14, nine trips on Route 7, nine trips on Route 12, nine trips on Route 48, and eight trips on Route 90 between Greenboro and Hurdman stations.

OC Transpo has also cancelled 13 trips on Route E1, the express bus that runs between Blair Station and Lyon Station during morning and afternoon peak periods.

As of Friday, OC Transpo had an average of 534 buses available every weekday, with an average weekday requirement of 500 buses.

In a separate memo to council, Leary said the daily bus requirement will be increased slightly during the spring service.

The new spring schedule for OC Transpo began on Sunday, with the transit service making adjustments for seasonal service changes and adjustments for construction.

Here are some of the changes to the OC Transpo spring bus schedule:
  • Leary says weekday schedule adjustments will be made to routes 12, 15, 30, 53, 81, 82 and 168 to “better align with observed actual travel times.”
  • Routes 7, 25, 75, and 88 will run less frequently during certain weekday time periods due to lower seasonal ridership levels as the winter term ends at post-secondary institutions, according to Leary.
  • Routes 7, 10, 48 and 111 will run on detours through Carleton University due to watermain work along Campus Avenue.
  • With work underway on Richmond Road at Bayshore Drive, routes 11, 57, 81 and 691 will be detoured when exiting Bayshore Station, via Holly Acres and Richmond roads.
  • Route 87 will be detoured along Churchill Avenue and Richmond Road, between Scott Street and Woodroffe Avenue.

https://www.ctvnews.ca/ottawa/article/oc...s-dozens-of-bus-trips-a-day-this-spring/
Reply With Quote
     
     
  #9044  
Old Posted Apr 20, 2026, 5:31 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,091
How many more trips of the 12 are they going to cancel? Holy 🞵🞵🞵🞵.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #9045  
Old Posted Apr 20, 2026, 7:59 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,106
Are these all inner Greenbelt routes? Not seeing any cuts to rush hour routes.

Didn't Sutcliffe run on fixing transit? Cause it's way worse than it was 4 years ago.
Reply With Quote
     
     
  #9046  
Old Posted Apr 20, 2026, 9:54 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,665
Again, this article is not really presenting enough information on a further reduction of transit service. It appears to be a regurgitation of what the reporter was handed by OC Transpo – without much thought put into what was provided.

For the Winter Booking session, the scheduled bus requirement was 520 buses during the peak weekday periods. Since January 12, there has been a TEMPORARY removal of 255 scheduled runs to reduce the peak bus demand to 500 buses. Once the available buses consistently numbered above 520, the TEMPORARY reduction would be reversed.

And now, we read in the article that the AVERAGE daily bus availability is up to 534 buses. This is above 520, so why have the 255 runs not been restored yet?

Because that 534 is a weekly AVERAGE. Here is a chart of the actual number of buses available per day:



The values: Apr. 2 = 547; Apr. 3 = 520; Apr. 6 = 512; Apr. 7 = 544; Apr. 8 = 553; Apr. 9 = 518; Apr. 10 = 513; There are no values recorded for week-ends.

Notice that during the last week, Apr. 6-10, there are only two days when the number of available buses is over 520. Although the WEEKLY AVERAGE is over 520, for 3 of the 5 days, OC Transpo would still not have enough buses to add back the 255 cut runs. There is no point in restoring the cuts if you can’t consistently provide the service.

An interesting thing I noticed is that from March 23 through April 3, OC Transpo did have 520 or more buses available each day. So for 2 weeks, things looked good. However, on April 3, there were only 520 buses available – a drop of 27 buses overnight. To me, this looks like OC Transpo stopped putting out a group of buses. My suspicion is that OC Transpo might be trying to minimize wear on older buses by not sending them out of days that have lower passenger counts. The theory being that, Mondays and Fridays have fewer riders, so there is not as much overcrowding if additional runs are cut. The ‘bus availability hump’ outlined between Monday, Apr. 6 and Friday, Apr. 10 also follows that idea. This might be to give the over-worked mechanics a break from all of the over-time work that they have been putting in.

Something else to realize is that from the beginning of January, OC Transpo has received almost 100 e-buses. On January 4, the available buses numbered 466; while as of April 8, there were 553 buses declared as available. So, I’m guessing that some of the older buses are no longer available, or not all of the e-buses are in revenue service yet.

However, OC Transpo still hasn’t even been able to deliver all of the runs the TEMPORARILY reduced schedule.
Here is the graph of the number of undelivered trips per week:



Values: Mar. 15 = 804; Mar. 22 = 715; Mar. 29 = 736; Apr. 5 = 846.

There is a disturbing slight upward slope on that line, starting from March 22.

So, what is actually preventing OC Transpo from providing the promised service? Is it a lack of available buses?

Here is an image showing the reasons for undelivered trips:



Note that ‘No Bus Available’ (blue with white Polka Dots) is growing. The weekly change from March 29 to April 5 is an increase of 84%! This latest jump, with 57 fewer available buses, is the biggest jump of any of the reasons – all of which increased from the previous week.

Hopefully, OC Transpo can correct the lack of bus operators with the new Spring Booking session. It was, no doubt, difficult to make changes once the Winter session had been booked.

The largest component for run cancelation, however, is ‘On Street Adjustment’. This usually happens because a bus gets too far behind schedule. In the olden days, before much interlining, a single run would be affected by a slow bus. Now, that can result in a chain of cancelations. Personally, I think that OC Transpo has swung the pendulum too far with interlining, and needs to increase its fleet and reduce interlining.

All that said, this latest article claims that 279 trips will be TEMPORARILY canceled. This is an increase over the 255 previously removed trips. I assume that this is instead of the 255, and not in addition to them.

What I find odd is that so many trips still need to be canceled. OC Transpo has more buses than before. And it has moved to the Spring Schedule – which has a reduction of bus runs due to lower demand by college and university students. For example, the frequency of the # 88 has been reduced to every 15 minutes in the spring. The Spring Schedule should reduce the fleet requirements – not increase it, as the article implies. Check the list of spring adjustments listed at the bottom of the article. They mostly reduce the number of buses needed.

Of course, this further reduction in transit service will result in more people changing from the bus to their own vehicle. This will increase the congestion on the roads, which will further delay buses, which will increase the number of buses required, and run cancelations.

(All graphs from: https://www.octranspo.com/en/about-us/transparency/bus-service-delivery-action-plan)
Reply With Quote
     
     
  #9047  
Old Posted Apr 21, 2026, 1:56 AM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,115
Quote:
Originally Posted by Richard Eade View Post
What I find odd is that so many trips still need to be canceled. OC Transpo has more buses than before. And it has moved to the Spring Schedule – which has a reduction of bus runs due to lower demand by college and university students. For example, the frequency of the # 88 has been reduced to every 15 minutes in the spring. The Spring Schedule should reduce the fleet requirements – not increase it, as the article implies. Check the list of spring adjustments listed at the bottom of the article. They mostly reduce the number of buses needed.
The number of trips is lower, but the fleet requirement has still grown because many routes have seen major increases (read: improvements) to scheduled runtimes to address chronic lateness. I read that some of the highest increases were over 20 minutes added to the scheduled times on some trips.

Longer scheduled times mean buses are occupied for longer periods of time, requiring more buses to cover the other trips that those buses would have been scheduled to cover. This should hopefully also help with the number of "on-street adjustments" for those routes.
Reply With Quote
     
     
  #9048  
Old Posted Apr 21, 2026, 12:45 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,665
Thanks, OCCheetos. This is useful information, that doesn’t seem to be available in the press releases – which is the only thing that most of us have to inform our opinions. (Yes, “adjustments” is mentioned in the media, but nothing specific – so it was most likely more cuts.)

Actually scheduling in a lot more time for a run will, hopefully, make the timing more realistic. That should have at least two big benefits: First, it can relieve the pressure on the bus operators who have been trying to follow impossible timelines. Without the imposed hectic pace, drivers won’t have to take the risky chances they do when driving – like racing a very stale amber signal. Without the need to get going so fast, operators might even wait a few extra seconds for that mother and two small children who are running for their bus. Maybe, just maybe, the operators will realize that they can actually provide the humanity that is needed, and their hearts will grow three-sizes that day.

And, second, bus service might become more reliable. If the buses are able to follow the scheduled times, customers will know when to arrive at the stops. With predictability, comes more confidence in the transit system – well, the buses, anyway.

I’m heartened to hear that OC Transpo is finally trying something different. For too many years they have been pushing harder and harder to wring more out of a dry cloth, and it has created an unstable house of cards. The slightest disorder, and service disruptions cascaded.

With the additional information that you have provided, OCCheetos, I can re-evaluate my assumptions. It sounds as if the 279 trips cut replaces the previous 255 run reduction. Both would limit the number of needed buses to 500. And, as you say, the more realistic run timing should reduce the required ‘On Street Adjustments’ – helping to build additional reliability.

So it is a continuation of service cuts, but maybe it is a step in a better direction. I have some hope.
Reply With Quote
     
     
  #9049  
Old Posted Apr 21, 2026, 4:50 PM
dougvdh dougvdh is offline
Registered User
 
Join Date: Jun 2017
Posts: 373
Quote:
Originally Posted by Uhuniau View Post
How many more trips of the 12 are they going to cancel? Holy 🞵🞵🞵🞵.
The big question I have is what's the priority when they are deciding on what to cut? Are they make the decision based on passengers served or based on route coverage?

Because cutting well used routes in order to maintain driving mostly empty buses around a neighbourhood just so you can say you're providing service isn't exactly a winning approach in terms of ridership.
Reply With Quote
     
     
  #9050  
Old Posted Apr 21, 2026, 5:02 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,917
Maybe there is some app that I am missing, but I think a lot of these service disruptions would be more manageable if there was real time information available. It seems hard to get any real time info before the actual scheduled start of the route, even though they must have known earlier that that a bus would be cancelled. If a driver calls in sick in the morning, someone I must be changing the schedule.
Reply With Quote
     
     
  #9051  
Old Posted Apr 21, 2026, 5:51 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,673
Mayor says progress made on LRT, Highway 174 transfers
Mark Sutcliffe says provincial LRT takeover could eventually save Ottawa $85M a year

Arthur White-Crummey · CBC News
Posted: Apr 21, 2026 11:29 AM EDT | Last Updated: 1 hour ago


Ottawa Mayor Mark Sutcliffe says the city has reached “the next big milestone” in getting Metrolinx to take over Ottawa’s LRT, though it doesn’t come with any timeline for when that will actually happen.

He signed an agreement with Ontario Minister of Transportation Prabmeet Sarkaria on Tuesday and called it a “giant step forward” in a deal that he said could one day save the city $85 million per year.

The agreement reaffirms what Premier Doug Ford already committed to last year.

Sutcliffe said it lays out “the governance of the process” and a “framework” for the due diligence the province has to do before its agency Metrolinx actually takes control of the O-Train, including its troubled, seven-year-old Line 1.

“Nothing’s done until it’s done,” Sutcliffe said at a news conference after the signing.

“When you have a commitment like this, you go through the work … I think you’ve seen over and over again the premier has reiterated his commitment to get this done.”

He said the two sides will now have to do “the hard work to bring it across the finish line.” He called the process long and complicated and said the city’s multibillion dollar, long-term contract with Rideau Transit Maintenance is “part of the complexity.”

Ford committed to upload the LRT to Metrolinx, which currently runs transit systems in the Toronto and Hamilton areas, during the last provincial election campaign. He said it would free up significant funds for the city.

Sutcliffe noted that OC Transpo is running a budget deficit — last year it reached $52 million — and said the savings from the upload could be reinvested in the transit system to help close the gap.

The mayor said his agreement with Sarkaria also lays out the final steps for a provincial upload of Highway 174 connecting central and east Ottawa, a promise that was part of the “new deal” he and Ford signed in the spring of 2024.

That upload has also been going through due diligence, but Sutcliffe said it is more advanced. Even so, he did not give a timeline on that file either.

“I think we're a lot closer to the finish line with the 174 than we are with LRT,” Sutcliffe said.

https://www.cbc.ca/news/canada/ottawa/ottawa-ontario-upload-lrt-otrain-highway-174-9.7171667
Reply With Quote
     
     
  #9052  
Old Posted Apr 21, 2026, 8:58 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,115
Quote:
Originally Posted by dougvdh View Post
The big question I have is what's the priority when they are deciding on what to cut? Are they make the decision based on passengers served or based on route coverage?

Because cutting well used routes in order to maintain driving mostly empty buses around a neighbourhood just so you can say you're providing service isn't exactly a winning approach in terms of ridership.
But the low-usage routes are also the ones with very little service to begin with. There may only be a handful of users for those trips, but when the service already runs half-hourly or hourly, a cancellation can have a big impact for the users... nevermind the fact that those trips often have fewer transit alternatives.

Preserving high ridership trips has a lot of popular appeal for obvious reasons, but it isn't more equitable just because more people are using the trip.

9 (out of 140+) daily trips on the 12 are cancelled. But the vast majority of trips are preserved and many users will still have some alternative routes that they can use. And to be very clear: I'm not saying this makes the cancellations okay, but it shouldn't be a mystery why the low-usage infrequent routes aren't being cancelled first.
Reply With Quote
     
     
  #9053  
Old Posted Apr 21, 2026, 11:26 PM
skyscraperaccount skyscraperaccount is offline
Registered User
 
Join Date: Jun 2023
Posts: 302
Quote:
Originally Posted by rocketphish View Post
Mayor says progress made on LRT, Highway 174 transfers
Mark Sutcliffe says provincial LRT takeover could eventually save Ottawa $85M a year

Arthur White-Crummey · CBC News
Posted: Apr 21, 2026 11:29 AM EDT | Last Updated: 1 hour ago


Ottawa Mayor Mark Sutcliffe says the city has reached “the next big milestone” in getting Metrolinx to take over Ottawa’s LRT, though it doesn’t come with any timeline for when that will actually happen.

He signed an agreement with Ontario Minister of Transportation Prabmeet Sarkaria on Tuesday and called it a “giant step forward” in a deal that he said could one day save the city $85 million per year.

The agreement reaffirms what Premier Doug Ford already committed to last year.

Sutcliffe said it lays out “the governance of the process” and a “framework” for the due diligence the province has to do before its agency Metrolinx actually takes control of the O-Train, including its troubled, seven-year-old Line 1.

“Nothing’s done until it’s done,” Sutcliffe said at a news conference after the signing.

“When you have a commitment like this, you go through the work … I think you’ve seen over and over again the premier has reiterated his commitment to get this done.”

He said the two sides will now have to do “the hard work to bring it across the finish line.” He called the process long and complicated and said the city’s multibillion dollar, long-term contract with Rideau Transit Maintenance is “part of the complexity.”

Ford committed to upload the LRT to Metrolinx, which currently runs transit systems in the Toronto and Hamilton areas, during the last provincial election campaign. He said it would free up significant funds for the city.

Sutcliffe noted that OC Transpo is running a budget deficit — last year it reached $52 million — and said the savings from the upload could be reinvested in the transit system to help close the gap.

The mayor said his agreement with Sarkaria also lays out the final steps for a provincial upload of Highway 174 connecting central and east Ottawa, a promise that was part of the “new deal” he and Ford signed in the spring of 2024.

That upload has also been going through due diligence, but Sutcliffe said it is more advanced. Even so, he did not give a timeline on that file either.

“I think we're a lot closer to the finish line with the 174 than we are with LRT,” Sutcliffe said.

https://www.cbc.ca/news/canada/ottawa/ottawa-ontario-upload-lrt-otrain-highway-174-9.7171667
I don't trust either side to do what is right for transportation in this city or province.
Reply With Quote
     
     
  #9054  
Old Posted Apr 22, 2026, 3:53 AM
YOWetal YOWetal is offline
Registered User
 
Join Date: Oct 2006
Posts: 7,742
Quote:
Originally Posted by OCCheetos View Post
But the low-usage routes are also the ones with very little service to begin with. There may only be a handful of users for those trips, but when the service already runs half-hourly or hourly, a cancellation can have a big impact for the users... nevermind the fact that those trips often have fewer transit alternatives.

Preserving high ridership trips has a lot of popular appeal for obvious reasons, but it isn't more equitable just because more people are using the trip.

9 (out of 140+) daily trips on the 12 are cancelled. But the vast majority of trips are preserved and many users will still have some alternative routes that they can use. And to be very clear: I'm not saying this makes the cancellations okay, but it shouldn't be a mystery why the low-usage infrequent routes aren't being cancelled first.
Yeah there is some logic to what you say but there is also a lot of regional politics. Soem poorly used routes are in wards with not too much transit. Is there a level below which the taxes are also reduced?
Reply With Quote
     
     
  #9055  
Old Posted Apr 24, 2026, 2:16 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,673
OC Transpo reopens washrooms for O-Train Line 1

By Adam Beauchemin, CTV News
Published: April 23, 2026 at 6:07PM EDT


OC Transpo says the washrooms at O-Train Line 1 stations have reopened.

The washrooms were closed over two months ago on Feb. 20 as OC Transpo undertook a risk assessment for all washrooms along the line due to drug-use and vandalism.

OC Transpo has not yet commented on the results of the risk assessment or whether security measures have been put in place.

In a Facebook post in March, Barrhaven East Coun. Wilson Lo said the closure followed an OC Transpo Special Constable investigation into needles that were “discovered placed in an intentional way that could cause harm to staff and customers.”

Line 1 has washrooms at Tunney’s Pasture, Bayview, Hardman and Blair stations.

With files from CTV’s Ted Raymond.

https://www.ctvnews.ca/ottawa/article/oc-transpo-reopens-washrooms-for-o-train-line-1/
Reply With Quote
     
     
  #9056  
Old Posted Apr 24, 2026, 12:47 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,106
I hope they at least added needle disposal containers.
Reply With Quote
     
     
  #9057  
Old Posted Apr 28, 2026, 6:38 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,088
I'm seeing a lot more Electric buses on the road. Any idea if this is boosting their availability of buses? And couldn't come at a better time given fuel prices.
Reply With Quote
     
     
  #9058  
Old Posted Apr 28, 2026, 7:15 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,115
Quote:
Originally Posted by Truenorth00 View Post
I'm seeing a lot more Electric buses on the road. Any idea if this is boosting their availability of buses? And couldn't come at a better time given fuel prices.
In general fleet availability is trending upwards. Electric buses still make up a relatively small portion of the fleet, but it's definitely helping.

The last day where they send out less than 500 buses in a given day was over a month ago. Before then it was happening at least once a week.

https://bettertransitottawa.ca/tracker/historical-graph
(scroll down)
Reply With Quote
     
     
  #9059  
Old Posted Apr 28, 2026, 7:23 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,665
Yes, OC Transpo now has roughly 100 active e-buses. That is 1/5 of what is needed, on average, during a weekday peak period. So, you should see e-buses more often.

That said, the number of runs not delivered is on a slow trend upwards over the past 4 weeks (715, 736, 846, 935). OC Transpo is back up to missing 1.9% of the scheduled service. This is, it seems, mainly because of, ‘Operator Availability’ (205, 167, 174, 219) and an increase in ‘Mechanical Breakdown’ (205, 199, 220, 265); each with a big jump of 45 more missed runs in the last week. However, other reasons for missed service are also higher now than four weeks ago: 'On Street Adjustments’ (252, 302, 326, 345), and ‘No Bus Available’ (53, 68, 125, 104). At least the addition of the new e-buses is starting to reduce the ‘No Bus Available’ number – at least for the last week.

The numbers lead me to believe that OC Transpo will have a VERY hard time reaching its goal of missing only 0.5% of the scheduled runs. Even if I zero out the other undelivered trips, just the 345 missed runs due to ‘On Street Adjustments’ – read buses caught in traffic congestion – account for about 0.7% of the total TEMPORARILY REDUCED runs.
Reply With Quote
     
     
  #9060  
Old Posted Apr 28, 2026, 8:15 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,665
Thanks for the link to Better Transit Ottawa, OCCheetos. However, I don’t see where the numbers come from.

For example, in the top graph, it has a variable labeled ‘Trips removed from schedule’ – which it describes as: “Trips removed are the number of trips that have been removed from the schedule since the schedule published on January 6th 2026.”

Yet, on January 12, 2026, OC Transpo TEMPORARILY removed 255 trips from the schedule. This is not reflected in the graph, which indicates that only 3 trips were removed on the 12th. Also, the graph shows a jump in removed trips of 142 on January 23, 2026; yet OC Transpo did not announce any additional trip removals at that time.

The Better Transit Ottawa graph seems to suggest that 127 of the removed trips were returned on March 16, 2026. I have not heard that OC Transpo has returned any removed trips. In fact, with the April 19, 2026 Spring Schedule, the number of TEMPORARILY removed trips increased to 279. The graph does show an increase on removed trips, from 105 to 216 on April 24, 2026, but even that does not match OC Transpo’s announcement.

As of its April 24, 2026 update, OC Transpo had 99 e-buses running in its fleet. The second graph from Better Transit Ottawa shows just 81 e-buses in total for April 27, 2026.

I don’t see an easy way of settling the discrepancies in the numbers.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:07 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.