HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Apr 16, 2026, 4:02 AM
Hybrid247 Hybrid247 is offline
 
Join Date: Oct 2009
Posts: 1,320
Quote:
Originally Posted by sseguin View Post
Sorry I might not have explained it clearly enough. The single platform will be used for Moodie bound trains in special service, or late night/weekend service. That was previously the plan... whether things will change when it actually opens is another matter. With this setup, outside of the modified service pattern, it will operate as a typical centre platform station.
If the signage in the station is any indication, Moodie-bound trains will be using the side platform full time, even during regular weekday service.
Reply With Quote
     
     
End
   
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 6:23 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.