HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #381  
Old Posted Apr 7, 2026, 12:26 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,200
Quote:
Originally Posted by officedweller View Post
Thanks!
Could be that the form was being lifted into place.
@10:28: A lot of the blue steel is just for support with the actual form starting on top.

Video Link
Reply With Quote
     
     
  #382  
Old Posted Apr 7, 2026, 10:50 PM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
When you think about it all, it kinda works out well that it was the Clayton Clipper that had gantry troubles, as it's the only one that's not passing through a station site (as Fleetwood Flyer built track segments to the east). That should help protect the overall project timeline as all of the stations can still be built on schedule.
Reply With Quote
     
     
  #383  
Old Posted Apr 8, 2026, 1:14 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Quote:
Originally Posted by madog222 View Post
@10:28: A lot of the blue steel is just for support with the actual form starting on top.
Thanks! That explains it.
Reply With Quote
     
     
  #384  
Old Posted Apr 9, 2026, 7:41 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,840
Reply With Quote
     
     
  #385  
Old Posted Apr 12, 2026, 2:32 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,744
Quote:
BC Hydro starts major work on power infrastructure for SkyTrain extension

One of the biggest parts of the new Surrey-Langley SkyTrain line – getting electricity to the system – is now under construction.

BC Hydro announced on April 8 that it has started installing the underground lines and equipment necessary to power the 16-kilometre extension of the line from the King George Station in Surrey to Langley City at 203 Street.

Relocation of existing lines and utilities along the Fraser Highway is now largely complete, Hydro said in its announcement, so crews can begin building the rapid transit line’s power supply system.

“Expanding rapid transit is an important part of building a cleaner, more sustainable future for the Lower Mainland and BC Hydro is committed to supporting that growth and the investments that come with it,” said Charlotte Mitha, president and CEO of BC Hydro.

The work started in March, and includes infrastructure at the eight new stations being built, along with infrastructure to connect the elevated guideway to the regional electrical system. Power for the SkyTrain will be delivered through dedicated circuits from two separate substations to ensure reliability.

ccording to BC Hydro, while the work is designed to meet the needs of the SkyTrain extension, it will also strengthen the local electrical system and support future growth along the Fraser Highway corridor. Construction will continue in phases through November 2027.

“BC Hydro’s work will ensure this new transit line will have the dependable power it needs to serve Surrey and Langley for decades to come,” said Adrian Dix, B.C. minister of Energy and Climate Solutions.
https://langleyadvancetimes.com/2026/04/...r-infrastructure-for-skytrain-extension/

Last edited by jollyburger; Apr 12, 2026 at 3:12 AM.
Reply With Quote
     
     
  #387  
Old Posted Apr 13, 2026, 9:54 PM
Ramsay's Avatar
Ramsay Ramsay is offline
Registered User
 
Join Date: Oct 2016
Location: Vancouver
Posts: 60
Quote:
Originally Posted by madog222 View Post

I'm surprised they aren't using the Sound Barriers they used on the Evergreen and Broadway lines.

https://www.ail.ca/project/sound-barrier-integrates-with-existing-lrt-guideway-in-bc/
Reply With Quote
     
     
  #388  
Old Posted Apr 15, 2026, 10:52 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,200
Eastbound span over Highway 15 in place.


From DriveBC https://www.drivebc.ca/cameras/94?pan=-122.734876%2C49.13825400000002&zoom=12
Reply With Quote
     
     
  #389  
Old Posted Apr 15, 2026, 2:01 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,840
Nice! That is one more left to be installed.
Reply With Quote
     
     
  #390  
Old Posted Apr 15, 2026, 5:11 PM
gaviscon gaviscon is offline
Registered User
 
Join Date: Nov 2021
Posts: 771
If a future Expo extension ends up connecting Abbotsford, do you guys think Abbotsford would be included into Vancouver's CMA for population stats?

The area would be unusually large so idk
Reply With Quote
     
     
  #391  
Old Posted Apr 15, 2026, 7:00 PM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,291
Quote:
Originally Posted by gaviscon View Post
If a future Expo extension ends up connecting Abbotsford, do you guys think Abbotsford would be included into Vancouver's CMA for population stats?

The area would be unusually large so idk
There's no realistic funding scenario that sees SkyTrain extended to Abbotsford.

There's a Fantasy thread for a discussion of ideas like that.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #392  
Old Posted Apr 15, 2026, 10:10 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,744
Quote:
Originally Posted by madog222 View Post
Eastbound span over Highway 15 in place.


From DriveBC https://www.drivebc.ca/cameras/94?pan=-122.734876%2C49.13825400000002&zoom=12
Just noticed that steel section in the middle which will join the two beams.
Reply With Quote
     
     
  #393  
Old Posted Apr 16, 2026, 1:05 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Quote:
Originally Posted by jollyburger View Post
Just noticed that steel section in the middle which will join the two beams.
The ones on North Road had concrete between the two box girders:


https://www.google.com/maps/@49.247538,-..._ep=EgoyMDI2MDQxMy4wIKXMDSoASAFQAw%3D%3D
Reply With Quote
     
     
  #394  
Old Posted Apr 16, 2026, 1:11 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,200
Video Link
.
Reply With Quote
     
     
  #395  
Old Posted Apr 16, 2026, 11:34 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,200
Reply With Quote
     
     
  #396  
Old Posted Apr 17, 2026, 12:36 AM
Chirpythecougar Chirpythecougar is offline
Registered User
 
Join Date: Nov 2024
Posts: 30
Is there a known reason for why this will terminate on Industrial ave instead on Fraser highway?
Reply With Quote
     
     
  #397  
Old Posted Apr 17, 2026, 12:41 AM
chowhou's Avatar
chowhou chowhou is offline
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,842
Quote:
Originally Posted by Chirpythecougar View Post
Is there a known reason for why this will terminate on Industrial ave instead on Fraser highway?
Fraser Highway starts getting a little tight at 200th St. and by 203rd where the terminus will be Fraser Highway is an older tight commercial street. There probably just isn't the room.
Reply With Quote
     
     
  #398  
Old Posted Apr 17, 2026, 2:03 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,744
Reply With Quote
     
     
  #399  
Old Posted Apr 17, 2026, 5:57 AM
surrey surrey is offline
Registered User
 
Join Date: Jan 2025
Posts: 50
is there a reason why the clayton clipper is moving at half the speed of the other 3 gantries? i watched the video from 2 weeks ago compared to today....the other 3 gantries built about 4 spans each and the clayton clipper built about 2.
Reply With Quote
     
     
  #400  
Old Posted Apr 17, 2026, 6:06 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,744
They just loaded the self-propelled modular transporters onto flatbeds to be taken away so I guess there's no more steel beams coming.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:40 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.